电 话 Tel:0551-65538567 SNE9610-PLUS Protocol Converter User Manual SNEGRID Power Technology Co., Ltd.
电 话 Tel:0551-65538567 Table of Contents Foreword........................................................................................................................ 1 Overview................................................................................................................ 1 Readers................................................................................................................... 1 Use of Manual...............................................................................
电 话 Tel:0551-65538567 3..2.4 Installation of Antenna....................................................................... 11 Chapter 4 Electrical Connection.................................................................................. 12 4.1 Port Description..............................................................................................12 4.2 Device Connection......................................................................................... 12 4.2.1 Connection of Inverter........
电 话 Tel:0551-65538567 6.5.4 Adding Acquisition Process................................................................ 26 6.5.5 Acquisition Process Configuration......................................................27 6.5.6 Acquisition Protocol Configuration.................................................... 29 6.5.7 Data Upload Setting............................................................................ 30 6.5.8 Upload Setting of Cloud Data..........................................................
电 话 Tel:0551-65538567 Foreword Overview This manual mainly introduces the installation, electrical connection, system operation, maintenance and troubleshooting of SNE9610 protocol converter (hereinafter referred to as SNE9610). Before installing and using SNE9610, familiarize yourself with its functions and features and read the safety information in this manual carefully. The figures in this manual are for illustration only. The product appearance on site shall prevail.
电 话 Tel:0551-65538567 channels. Revision History Version V1.
电 话 Tel:0551-65538567 Chapter 1 Safety Precautions 1.1 Safety Instructions SNE9610 produced by SNEGRID Power Technology Co., Ltd. (hereinafter referred to as SNEGRID) is designed and tested strictly in accordance with relevant safety laws and regulations. However, as it is electrical and electronic equipment, the following safety instructions shall be followed during installation and maintenance, otherwise improper operations will cause injury and property loss to operators and the third-party.
电 话 Tel:0551-65538567 local state, such as qualifications of high voltage operation, aloft work, special equipment operation, etc. The equipment or parts (including software) must be replaced by professionals or authorized personnel. 1.3 Electrical Requirements If the equipment needs to be grounded, then the protection earth wire must be installed before the installation of the equipment and must be dismantled finally during the removal of the equipment.
电 话 Tel:0551-65538567 Chapter 2 Product Introduction 2.1 Product Functions SNE9610 is a monitoring and management equipment applied in the photovoltaic power station inverter and other photovoltaic equipment, integrating interface convergence, protocol conversion, data acquisition, data storage, centralized monitoring and centralized maintenance and other functions. 2.1.1 Flexible Networking Support RS485, Ethernet, WiFi communication.
电 话 Tel:0551-65538567 2.2 Appearance 2.2.1 Dimensions Length Width Height 199.66mm 121.25mm 31.8mm Width (W) Length (L) Fig. 2-1 External View of SNE9610 2.2.2 Appearance Fig.
电 话 Tel:0551-65538567 No. A B C D E F No. G H Port DC12V LAN1 LAN2 ANT COM5-C0M8 COM1-COM4 Port Description DC input Ethernet port 1 Ethernet port 2 WiFi antenna interface th 5 ~ 8th RS485 interfaces 1st ~ 4th RS485 interfaces Fig. 2-3 Rear View Port Port Description Card slot Micro SIM card slot Fixed hole position of Fixed mounting hole position of guide rail guide rail 2.2.
电 话 Tel:0551-65538567 COM2-TX Flashing COM2-RX Flashing COM3-TX Flashing COM3-RX Flashing COM4-TX Flashing COM4-RX Flashing COM5-TX Flashing COM5-RX Flashing COM6-TX Flashing COM6-RX Flashing COM7-TX Flashing COM7-RX Flashing COM8-TX Flashing COM8-RX Flashing COM1 data Flashing after the system sends COM2 data Flashing after the system receives COM2 data Flashing after the system sends COM3 data Flashing after the system receives COM3 data Flashing after the system sends COM4 da
电 话 Tel:0551-65538567 Chapter 3 Equipment Installation 3.1 Packaging Information After opening the SNE9610 packaging, please check whether accessories are complete and whether there is obvious damage of appearance. If there is any damage or missing items, please contact your dealer. No. Device Name Quantity Unit 1 SNE9610 1 set 2 2EDGK-5.08-03P port 1 piece 3 2EDGK-5.08-08P port 2 piece 4 WiFi antenna 1 piece 5 Certificate of Quality 1 piece 6 User Manual 1 piece 3.
电 话 Tel:0551-65538567 The installation method and position must be suitable for the weight and size of SNE9610 (with suspension loop) (L * W * H: 224mm * 121.25mm* 31.8mm). Make sure that there is enough space around SNE9610, that the installation position is 1500mm from the ground, and that at least 500mm of maintenance space is reserved. The minimum spacing shall meet the following requirements shown in the following figure. 3.2.2 Wall Mounting Select an appropriate mounting plane.
电 话 Tel:0551-65538567 3..2.4 Installation of Antenna The sucker base must be placed on a metal object outside the container to avoid affecting signal reception. The container must be drilled to reserve the sucker antenna outlet with a diameter of 20mm. Fix the sucker base on the outside of the container body, pass the nut end of the sucker antenna through the hole, and screw it clockwise to the corresponding antenna of SNE9610.
电 话 Tel:0551-65538567 Chapter 4 Electrical Connection 4.1 Port Description No. A B C D E Fig. 4-1 Schematic Diagram of SNE9610 Port Port Port Description POWER DC 12V input, width voltage, supporting DC12-36V LAN1 Ethernet Port 1, default IP: 192.16.1.136 LAN2 Ethernet Port 2, default IP: 192.16.2.136 COM1-4 RS485 Communication Interface 1-4 COM5-8 RS485 Communication Interface 5-8 4.2 Device Connection 4.2.1 Connection of Inverter Select RS485 communication cables with an appropriate length; 2* 0.
电 话 Tel:0551-65538567 insulation layer by about 8mm~10mm with a wire stripper. Connect one end of the cable with the insulation layer peeled off to RS485 COM port of SNE9610, RS485 A to the corresponding terminal of COM Port A and RS485 A B to the corresponding terminal of COM Port B.
电 话 Tel:0551-65538567 4.2.4 Connection of Electricity Meter When the electricity meter is connected to SNE9610, it is recommended to use the electricity meter that meets the requirements of Modbus protocol. The communication cables from the electricity meter are connected to COM Port A and COM Port B of RS485 of SNE9610. 4.2.
电 话 Tel:0551-65538567 Chapter 5 System Running 5.1 Check before Power-On Check before power-on shall be conducted to ensure the normal operation of SNE9610 after power-on. Check that SNE9610 has been installed in place. Check that all cables between SNE9610 and other devices are connected correctly and firmly Check that RS485 communication cables of SNE9610 are connected correctly and firmly Check that cables are bundled neatly and beautifully.
电 话 Tel:0551-65538567 Chapter 6 WEB Configuration 6.1 Introduction of WEB Interface The data of the pictures on the WEB interface in this document are for reference only. When you log in the WEB with different identities, the parameters of the operation interface will be different. This document describes how to log in the operation interface as an administrator. Parameter names, ranges and default values are subject to change or adjustment and the display values shall prevail.
电 话 Tel:0551-65538567 Default IP of LAN1 port is 192.16.1.136 and default IP of LAN2 port is 192.16.2.136. Modify the IP address of the computer so that the IP address shall be in the same network segment with the Ethernet port. For example: IP address: 192.16.1.137 Sub-net mask: 255.255.255.0; Default gateway: 192.16.1.1 Fig. 6-1 Modification of Computer IP Address 6.4 Data Allocation of Inverter 6.4.
电 话 Tel:0551-65538567 Fig. 6-2 WEB Login Interface ID: admin Password: admin123 6.4.2 Start Wizard Click [Start Wizard] button to enter the Start Wizard interface. Fig. 6-3 Start Wizard Interface Factory default acquisition process is CommModbusM1, corresponding to COM1 serial port, baud rate of 9600. Enter the number of inverters and click [Save] button.
电 话 Tel:0551-65538567 support the address query, you can click the [Search] button to query the inverters, and the result will be returned after the query; click the [Save] button to save it. 6.4.3 Address Allocation Adjustment Click [Special Features] ->[Address Allocation Adjustment] button to enter the Address Allocation Adjustment interface of the inverter. Fig.
电 话 Tel:0551-65538567 Fig. 6-6 Address Adjustment Address allocation adjustment requires the support of the inverter firmware. If the slave IP address of the on-site inverter has been set, the address allocation adjustment can be omitted. 6.4.4 WiFi Connection Click [System]->[Net Set Up] button to enter the network setting interface. Fig. 6-7 Network Setting Interface Click WiFi button, select the network, enter the WiFi password and then click [Link] button for connection.
电 话 Tel:0551-65538567 Fig. 6-8 WIFI Connection During waiting for the connection, switch the page to check the connection status. After successful connection, the interface will display connected status, WiFi name, WiFi password and WiFi IP address. If the interface displays unconnected state, please check whether the WiFi name and password are correct. Currently, the device only supports WiFi in the frequency band of 2.4GHz. Special settings may be made for some 2.4GHz/5GHz routers.
电 话 Tel:0551-65538567 6.4.5 Restart Device Click [System]->[Recover From The Factory Set Up] button to enter the backup and recovery setting interface. Fig. 6-10 Backup and Recovery Setting Interface Click [Execute] button under the Reboot option to restart the system. Wait for one minute. After the system is restarted, the acquisition communication configuration of the inverter is completed. You can view the collected real-time data in the real-time data interface.
电 话 Tel:0551-65538567 type interface. Fig. 6-11 Adding Equipment Type Click [+New] button to add collected equipment type. Fig. 6-12 Adding Equipment Type 6.5.2 Adding Equipment Template Point Table Click [Equipment] ->[Equipment Template] button to enter the equipment template interface, and then click [+New] button in this interface to complete the template point table for the devices added in the previous step.
电 话 Tel:0551-65538567 Fig. 6-13 Equipment Template Fig. 6-14 Adding Equipment Template Point Table Equipment type- Select the type of equipment to be added. Data type- remote communication, telemetry, remote control, remote adjustment; Data number- increasing successively from 0, the basis for automatic generation of ID; Data name- name of the monitoring point, selected according to the communication protocol. Display type- data display type, including decimal, hexadecimal or BCD.
电 话 Tel:0551-65538567 electricity meter in this field, which is the basis for anti-Anti-reflux later) Function code- Function code, selected according to communication protocol. Data format- Data type, selected according to communication protocol. Byte Serial Number - serial number of the data byte, selected based on the communication protocol. Register address- register address, selected according to communication protocol. End identity- end identity, usually 0. Fig.
电 话 Tel:0551-65538567 system will automatically generate the corresponding device measurement point and ID. At the same time, you can view the measuring point information of the added equipment in the real-time data interface. If there are multiple acquisition devices, please add them one by one. 6.5.4 Adding Acquisition Process Click [Data Gather] - >[ Acquisition Process] button to increase the number of equipment to be collected and then click [+New] button to add them. Fig.
电 话 Tel:0551-65538567 Statute type- process type: MODBUS master station Channel type- channel type: serial port 6.5.5 Acquisition Process Configuration Click [Data Gather] - >[Channel Configuration] button to select the processed added newly and then click [+Increase] button to add them. Fig. 6-19 Adding Process Configuration Link number: link number, 0 (default) Link name- link name: electricity meter (optional) Fig.
电 话 Tel:0551-65538567 MAXLEN- Maximum number of bytes returned, 256 (default) Fig. 6-21 Protocol Parameter Configuration Click [Edit] button in Channel Parameters option to configure the channel parameters in our processes added.
电 话 Tel:0551-65538567 Fig. 6-22 Channel Parameter Configuration 6.5.6 Acquisition Protocol Configuration Click [Data Gather] - >[Protocol Configuration] button and select the process you just add and click [+Increase] button to add the protocol. Data type- data type: including four-remote all; Link number-link number: 0 (default); Equipment address - slave address of device: the same as that on site. Click [Sure] button for automatic generation.
电 话 Tel:0551-65538567 Fig. 6-23 Acquisition Protocol Configuration 6.5.7 Data Upload Setting Click [Special Features] ->[Collector Settings] button, select the number of devices to be collected.(This step is not required for inverters) Fig.
电 话 Tel:0551-65538567 instruments connected: consistent with the actual; Ammeter acquisition quantity- number of ammeters connected: consistent with actual acquisition; Convection box acquisition quantity- number of convergence boxes: consistent with actual acquisition. 6.5.8 Upload Setting of Cloud Data Click [Special Features] - >[Ginlong Upload] button to enter the setting of uploading cloud data.(This step is not required for inverters) Fig.
电 话 Tel:0551-65538567 6.6 Special Functions 6.6.1 Address Assignment Adjustment See Section 6.4.3 6.6.2 Inverter Upgrade Click [Special Features] - >[Inverter Upgrade] button to enter the inverter upgrade interface. Inverter upgrade is divided into upgrade of HIMI, master DSP and slave DSP. Select the corresponding acquisition process, fill in the slave address and version number of RS485 corresponding to the inverter, and select the upgrade file from the local unit to upgrade the inverter.
电 话 Tel:0551-65538567 6.6.2 Inverter I-V Curve Scanning Setting Fig. 6-27 I-V Curve Scanning Setting Click [Special Features] - >[I-V Curve scan Set up] to enter the I-V curve scanning setting interface of the inverter. Select the corresponding acquisition process and fill in the slave address, starting voltage and voltage interval of RS485 corresponding to the inverter for setting. 6.6.
电 话 Tel:0551-65538567 Fig. 6-28 Startup &Shutdown Setting of Inverter 6.6.4 Modifying National Standards of Inverter Click [Special Features] - >[Modify The National Standard] to enter the national standard modification setting interface of inverter. Select the corresponding acquisition process, fill in the slave address of RS485 corresponding to the inverter and select the corresponding GB for setting. Fig. 6-29 Modifying National Standard Setting of Inverter 6.6.
电 话 Tel:0551-65538567 setting interface of inverter. Fig. 6-30 Anti-Reflux Setting of Inverter Input status- input status: select “Input”; Way to Control - control mode: select “Local”; Reactive power type- reactive power type: select “Other” (no input). Reactive local target: reactive power target: 0 (any value if no input is required); Reactive remote target ID: reactive remote control: 0 (any value if no input is required); Active type- active power type: Select “Anti-reflux mode”.
电 话 Tel:0551-65538567 Chapter 7 Technical Specifications Model Basic Parameters Dimensions CPU Master Frequency Indicator Light SNE9610-PLUS 200*121*32mm ARM Cortex-A7 800MHz Running, power supply, communication and status indicator lights Maximum optional 2-way MB ports Maximum optional 8-way serial port DC 12V Ethernet Port Serial Port Working Power Supply Mounting Method Wall mounting, guide rail mounting Communication Parameters Communication RS485/RJ45 Mode Baud Rate Adjustable, 1200 -19200bps Pure
电 话 Tel:0551-65538567 IP Protection Grade IP20 37
电 话 Tel:0551-65538567 Chapter 8 Contact Us Company Name: SNEGRID Power Technology Co., Ltd. Company Address: Intersection of Xinfa North Road and Yihu Avenue, Yangcun Industrial Park, Tianchang City, Anhui Province, China Tel.: 0551-65550976 Fax: 0551-65550976 Official Website: www.snesolar.