User Manual

MODEL SKY6016 TRIPOD/BASE MOUNT
Warning: Do not use with mount pipe longer than 18"
1. FIRST TIME ASSEMBLY: Attach adjustment knob using the square nut and nut clamp. Turn
base upside down. Place nut inside nut clamp and drop into slot on bottom of base so that the
open side of the nut clamp is toward the flat side of the base. Screw in adjustment knob. Use
this knob to remove and re-tighten pipe mount for travel or storage.
2. Attach compass to base, secure level to base.
3. Attach rubber feet to support legs.
4. Insert spring clips into the support legs until locked in place.
5. Slide legs into base until locked in place.
Square Nut and Nut Clamp
Adjustment Knob
18in Pipe Mount
Bubble Level Compass
Base
Spring Clip
Support Leg
Rubber Foot
Elastic Cord
Anchor Screw

Summary of content (2 pages)