Users Manual Part 2

TP-R-400 Operation
31
2.4 Replacing Measuring Unit
NOTICE
Risk of damage to the equipment!
Clean and dry the probe well before opening!
Do not use compressed air to clean the touch probe!
When inserting the new measuring unit, ensure that the O-rings inside the touch probe housing and on the
measuring unit are properly seated!
1. Remove the stylus according to chapter 2.2.1.
2. Remove the battery from the touch probe according to chapter 2.2.3.
3. Insert the C-spanner into the bores of the measuring unit and carefully unscrew the measuring unit in a counter-
clockwise direction.
4. Insert the new measuring unit into the touch probe and carefully screw it in by hand.
5. Insert the C-spanner into the bores of the new measuring unit, screw the measuring unit completely to the stop.
6. Mount the stylus according to chapter 2.2.1.
7. Reinsert the battery into the touch probe according to chapter 2.2.3.
INFORMATION
After changing the battery, the time for starting the touch probe (reboot) is approx. 5 s!
8. Align the stylus to spindle centre.
9. Calibrate the probe.
Replacing Measuring Unit (Example: PP41.00 -> MY21.00)
Measuring unit
PP41.00
Measuring unit
MY21.00
C-spanner
(2951)

Summary of content (8 pages)