Installation Guide

INSTALLATION
DURASHARDWOOD FLOORING INSTALLATION GUIDELINES
IMPORTANT INFORMATION BEFORE YOU BEGIN
It is
EXTREMELY IMPORTANT
that you read and understand this information completely prior to starting, since improper
installation can void the warranties.
INSTALLER/OWNER RESPONSIBILITY
Carefully inspect
ALL
material prior to installation for defects. Materials installed with visible defects are not covered under
warranty. Remember Wood is a natural product that can vary in color, grain, and contains natural characteristics that varies
from plank to plank and is to be expected. We do not warrant against these natural variations from plank to plank or variations
from sample to plank. Remember If you are not satised with the ooring prior to installation, contact your dealer
DO NOT
INSTALL
the ooring. Accepting or rejecting the material must be done on full shipment of quantities only, not carton by
carton or plank by plank. Material is manufactured to exceed industry standards (ANSI/HPVA EF 2009).
We urge you, as the nal inspector to inspect for proper color, nish, style, and quality PRIOR to installation. Verify that the ooring is the
correct material. Care should be taken at this time to remove or repair particular characteristics you do not desire. Manufacturer declines
responsibility for any costs incurred when plank(s) with visible defects have been installed.
The use of stain, ller, or putty stick for the correction of minor defects during installation should be accepted as normal procedure.
5% cutting allowance, depending on layout, must be added to the actual square footage amount needed. (Diagonal, herringbone, or bordered
installations will require a higher percentage)
Install cabinets prior to ooring to prevent damage to the ooring. Shaw is not responsible for removal of cabinets in the event of a claim.
TOOLS AND EQUIPMENT NEEDED
Broom or vacuum Moisture Meter Safety Glasses
Tape Measure Hand Saw Color Wood Filler
Chalk Line & Chalk Electric Miter Saw/Table Saw
Hammer Pry Bar NIOSH designated
Dust Mask
CAUTION: WOOD DUST
The International Agency for Research on Cancer has classied wood dust as a nasal carcinogen. The sawing,
sanding, and/or machining of wood products can produce wood dust that can cause respiratory, eye, and skin
irritations.
Equipment should be equipped with a dust collector to reduce airborne wood dust. Wear an appropriate
NIOSH designated dust mask to reduce exposure to airborne wood dust. Avoid contact with eyes and skin. In case of
irritation, ush eyes or skin with water for at least 15 minutes. In cases of severe irritation; seek immediate medical
attention.
For further technical or installation questions or to request a Product Specication Data Sheet contact the
manufacturer.
WARNING
Drilling, sawing, sanding or machining wood products can expose you to wood dust a substance known to the State
of California to cause cancer. Avoid inhaling wood dust or use a dust mask or other safeguards for personal
protection. For more information go to www.P65Warnings.ca.govtwood
PRE-INSTALLATION & JOBSITE CONDITIONS
It is the installer/owners responsibility to ensure that the jobsite conditions and jobsite suboor are environmentally and
structurally acceptable prior to the installation of any hardwood ooring. The manufacturer declines any responsibility for
failures or deciencies of hardwood ooring resulting from or related to sub-oor, sub-surface, or job-site environmental
conditions. All substrates must be clean, at, dry, and structurally sound.
Suboors must be clean and free of dirt, curing compounds, sealers, drywall mud, paint, wax, grease, urethane, or other materials that may affect the
integrity of the ooring material or adhesives used to install the ooring.
All suboors and suboor systems must be structurally sound and must be installed following their manufacturer's recommendations. Local building
codes may only establish minimum requirements of the ooring system and may not provide adequate rigidity and support for proper installation and
performance of a hardwood oor. Whenever possible install the planks perpendicular to the oor joists for maximum stability. Our warranties
DO NOT
cover any problems caused by inadequate substructures or improper installation of said substructures.
1
shawoors.com
For reference purposes only if printed or downloaded.

Summary of content (8 pages)