Verizon LTE 13245 UE Tester Quick Installation Guide
Table of Contents CHAPTER 1 INTRODUCTION .............................................................................................. 1 Package Contents .............................................................................................................. 1 LEDs ................................................................................................................................... 2 CHAPTER 2 INITIAL INSTALLATION...........................................................................
Chapter 1 Introduction 1 This Chapter provides an overview of the device's features and capabilities. The LTE 13245 UE Tester is a Desktop Small Cell LTE Device Tester handles multiple scenarios, running different protocols simultaneously, and provides a complete, independent solution. Package Contents The following items should be included: If any of the above items are damaged or missing, please contact your dealer immediately.
LEDs Top-mounted LED POWER (Red) On - Power On/Normal Operation Off - Power off WAN1 (Red/Green) On Green - CPU1 LAN active On Red - CPU1 LAN inactive WAN2 (Red/Green) On Green – CPU2 LAN active On Red – CPU2 LAN inactive Band 5 (Red/Green) On Green – Band 5 in service On Red – Band 5 RF not in service Band 2 (Red/Green) On Green – Band 2 in service On Red – Band 2 RF not in service Band 13 (Red/Green) On Green – Band 13 in service On Red – Band 13 RF not in service Band 4 (Red/Green) On Green
/broadband router Ant Band 4 SMA connection for Band 4 External Antennas Ant Band 13 SMA connection for Band 13 External Antennas Ant Band 2 SMA connection for Band 2 External Antennas Ant Band 5 SMA connection for Band 5 External Antennas 3
Chapter 2 Initial Installation 2 This Chapter covers the software installation of the device. Procedure 1. Power Up Connect the supplied power adapter to the UE Tester. Use only the power adapter provided. Using a different one may cause hardware damage. 2. Connect LAN Cable Use a standard LAN cable to connect the device to the Ethernet port on the UE Tester 3. Check the LESs The Power LED should be ON.
Chapter 3 Specifications 3 General Specification Connectivity - Eight SMA RF connector for External Antennas - Four Gigabit Ethernet LAN ports Power Supply External Power Adapter: AC100~250V, 50Hz/60Hz Operating Requirement Operating Temp. 0ºC to 40ºC Storage Temp. -5ºC to 45ºC Operating Humidity 5% to 90% Non-Condensing Storage Humidity 5% to 95% Non-Condensing Reset button Two LED 7 LED for Status.
Regulatory Requirements Catalog Area Standard Safety USA UL 61010 3rd EMC USA FCC Part 15B RF USA FCC Part 24E/27/22H/27F Note FCC Statement This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Safety Information All instructions, warning and caution statements that accompany this equipment must be strictly followed at all times to ensure its safe use. Observe all warning and caution symbols that are fixed to this equipment. This electrical equipment is designed with the utmost care for the safety of those who install and use it.