GL-1 Gate Lock Installation Instructions and Operating Manual 1 500-22090, Rev A
Table of Contents Table of Contents .............................................................................................. 2 Specifications ..................................................................................................... 3 Physical .......................................................................................................... 3 Electrical ......................................................................................................... 3 Product Overview ......
Specifications Physical Holding Force Preload Dimensions 2,000 lbs [907 kg] Up to 100 lbs (Fail Locked only) 2 ¾” L X 7 ¼” H X 3 ¼” D [70 mm L X 184 mm H X 83 mm D] Electrical 24 VDC Current Requirement Initial (Peak): 720 mA (~ 1 sec) Reduced: 170 mA Power Consumption: 4.1 Watts Operating Temperature –58 to +167 F [–50 to +75 C] ° Initial (Peak): 870 mA (~ 1 sec) Reduced: 290 mA Power Consumption: 3.
• • • • • • Self-aligning receiver (up to +/- 1/2" horizontally or vertically) helps compensate for gate misalignment and sag Tamper proof cast housing Latch status monitor switch (SPDT) ½”-14 NPSM inside pipe thread Surface Mount Black finish Product Components Upon unpacking this product, an inventory should be made to ensure that all the required components and hardware have been included.
Installing the GL1 Electromechanical Gate Lock Installation Concerns CAUTION: It is vital that all welding be completed prior to making any electrical connections to the mounted GL1. Welding in or around an electrically-connected lock assembly can cause damage to the electronic components. • Installation should be performed by a qualified service person, who conforms to all local codes and complies with The National Electrical Code (or equivalent).
assembly should be installed in a location that will not hinder or create a potential safety hazard to authorized personnel routinely accessing the protected area. Because of the diversity in gate construction and installation configurations, optimum mounting platforms may be achieved by welding adequate size metal plates, channels or tubing to the fence frame and the gate.
Figure 3. Installation Spacing Dimensions Figure 4.
Perform the Cylinder Lock/Cover Hole Plug Installation NOTE 1: The GL1 provides for the additional function of an optional keyoperated cylinder lock. The cylinder lock can be installed to either side of the lock cover, because the GL-1 lock latching mechanism features an actuator lever that will engage the cylinder lock from either side. NOTE 2: IF the cylinder lock is not used, THEN a cover hole plug (provided) must be installed on both sides of the cover. 1.
Figure 5. Cylinder Lock Installation c. SLIP the spacer over the cylinder lock and INSERT the cylinder lock into the applicable side hole on the lock cover. d. SLIP the lock mounting nut over the cylinder lock inside the cover and THREAD the nut onto the lock body by hand. e. TIGHTEN to secure the nut in place using the provided cylinder nut tool. f. INSTALL a cover hole plug in the opposite side of the cover, and SECURE its retaining nut using the provided retaining nut tool.
Figure 6. Cover Hole Plug and Retaining Nut Mount the GL1 and Connect the Electrical NOTE: The FMK-SL (Sliding Gate) and the FMK-SW (Swing Gate) mounting bracket kits are recommended for installing the GL1. 1. IF not using one of the recommended mounting bracket kits, THEN USE the included template to locate and install mounting hardware. 2. INSTALL the lock chassis using the top two lock chassis mounting positions.
3. ROUTE all electrical wiring through either the provided wire conduit coupling in the bottom of the lock chassis or through the ½” [12.7 mm] hole in the rear of the lock mounting chassis (see Figure 7, “Wire Routing”). 4. FEED wires through the hole in the side of the lock chassis opposite to the cylinder lock, if installed. 5. IF there is no cylinder lock installed, THEN FEED wires through either side of the lock chassis (see Figure 7). Figure 7. Wire Routing 6.
Figure 8. PC Board Terminal Block Figure 9. System Connections 7. PERFORM a functional test of the GL1.
Complete the GL1 Installation CAUTION: Lock cover must be installed straight on to avoid possible damage to the PC Board. 1. INSTALL the lock cover over the lock mounting chassis by placing the cover straight on and then sliding to engage. 2. SECURE the cover to the mounting surface using two (2) socket head cap screws and two (2) split lock washers. 3. PLUG conduit fitting if not used, welding the plug for maximum security.
Troubleshooting PROBLEM: The lock does not latch. ▪ ▪ ▪ CHECK lock-to-strike engagement distance—strike may be mounted too far away from the lock. CHECK wire routing to ensure wiring does not impede the function of the lock mechanism manual override/actuator lever, or behind lock catch. ENSURE that there is power supplied to the unit and that the lock is wired correctly. PROBLEM: The lock output does not report secure condition.
PROBLEM: Cover does not fit on the lock. ▪ ▪ ▪ CHECK welding—If the lock chassis was welded to the mounting surface; verify that there are no welds that extend beyond the edge of the chassis back plate. CHECK wire routing to ensure that the placement of the wires is not inhibiting the proper fit of the cover to the lock chassis. Cover must be straight on and slid into position (DO NOT TILT). PROBLEM: Manual override does not work.
Securitron 10027 S. 51st St. Ste 102 Phoenix, AZ 85044 Tel: 1-800-624-5625 Mon-Fri: 6:00am - 4:00pm PDT Fax: 1-800-232-7329 m o c . n o r t i r u c e s 16 © 2014, Hanchett Entry Systems, Inc., an ASSA ABLOY Group Company.