Installation Guide

Table Of Contents
1
1
79-88
5Chiseling wall diagram
3.5"
2.7"-3.1"
wall
Tiles
1.8"
6.7"
4.7"
1.Read the instructions carefully before installing.
2.The installation must be performed by a qualified person.
3.Installation tools:
2Installation Preparation
account can cause permanent damage to the cartridge.
3.Screw connections and test for leaks.
4.Using a spirit level on the cams, the mixer align horizontally,vertically and
parallel to the wall.
5. Warm reminder:
In the cold areas or the indoor temperature is less than 4 in Winter, if no
using the faucets for a long time, please turn off the inlet water valve and
drain the remaining water inside the supply pipe, which can avoid the faucet
damage caused by the expansion of the frozen water.
Hot water
Shower head
outlet
Handle shower
outlet
PRT0001
开平市预发卫浴有限公司
2
3
4
4Dimentional drawing
47-63
4-1/2-
14NPT
1/2-14NPT
6Pipe-connection diagram
Concealed installation shower set
2
INSTALLATION
11
35-39
3Accessory list
MANUAL
12
3
4
1New installations
NOTE!!!
1.Supply lines should be purged to clean impurities before connecting the unit.
2.The hot water supply should be connected to the left and the cold water supply
to the right, when viewed from the operating position. If this is not taken into
inlet
Cold water
inlet
5
Unitinch
2.7
2
5.1
6
5
3Accessory list
7
8
9
10
8
Handle shower
7
Elbow with hook
6
5
4
Cartridge handle
3
Diverter handle
2
1
9
10
11
No.
12
Concealed installation valve
1
1
Shower hose
1
1
1
1
Cover board
1
1
Qty.
Shower head
1
Shower arm
1
Cover board
1
Description
Allen-key
1
Nails bag
7.1
9.6x9.6
15
1/2-14NPT

Summary of content (2 pages)