Installation Guide

English 9
Connecting the power
Step 3. Installing the power cord
For power cord installations, hook the strain relief over the power cord hole (1
3
8")
located below the rear of the drawer body. Insert the power cord through the
strain relief and tighten the device.
Conduit
connection
plate
Power
cord
Strain relief
You must install the power cord with a strain relief.
Attach the strain relief to the 1
3
8" opening in the conduit connection plate.
Installing a 3-wire power cord
WARNING
The neutral or ground wire of the power cord must be connected to the neutral
terminal located in the center of the terminal block. The power leads must be
connected to the lower left and the lower right terminals of the terminal block.
1. Remove the 3 lower terminal screws from the terminal block.
2. Insert the 3 terminal screws through each power cord terminal ring and into
the lower terminals of the terminal block. Be certain that the center wire
(white/neutral) is connected to the center lower position of the terminal block.
3. Tighten screws securely to the terminal block. DO NOT remove the ground
strap connection.
4. Go to Step 5 on page 13 to continue with the installation.
Neutral terminal
Live 1
Ground strap
Live 2
Black
Black
White
White
Red
Red
Install_NE63T8911_AA_DG68-01257A-00_EN.indd 9 3/19/2020 4:15:01 PM