Service manual

Rev. 2.00
- 99 -
SRP-275
5-4-4 Cover middle assy
Part name Assembly procedure
Cover middle
PMO-roller paper/end
Label -logo-SAMSUNG
Label -logo-BIXOLON
Label -operation
Operation panel ass’y
Screw -taptite (M3×6) -2ea.
Switch -cover open ass’y
(Sub-assembly C-1)
Screw -tapping (M2×5) -2ea.
Switch-paper near end-W ass’y
(Sub-assembly C-2)
Harness (Operation panel)
1. Insert PMO -roller paper/end to Cover middle .
2. Paste Label -logo-SAMSUNG on the front side of Cover
middle.
3. Paste Label -logo-BIXOLON on the back side of Cover
middle.
4. Tighten Operation panel ass ’y to Cover middle with two
Screw-taptite (M3×6).
5. Insert Harness (Operation panel) in Operation panel ass’y .
6. Tighten Switch -cover open ass’y to Cover middle with two
Screw -tapping (M2×5).
7. Insert
Switch-paper near end-W ass’y
to Cover middle.
8. Align the harness of Switch -cover open ass’y and
Switch-
paper near end-W ass’y
.
1
2
3
4
5
6
7
7
8
9
9
10
11