Service manual

Rev. 2.00
- 96 -
SRP-275
5-3-8 Main assy
Part name Assembly procedure
AC timing belt ass’y
(Sub-assembly 5-3-1)
AC upper frame caulking ass’y
(Sub-assembly 5-3-2)
AC upper cutter guide ass’y
(Sub-assembly 5-3-3)
AC motor ass’y
(Sub-assembly 5-3-5)
Gear-AC worm wheel
Gear-AC gear pulley -2ea.
Shaft-AC-shaft guide -2ea.
Ring-e hole (ø3.0) -2ea.
Frame-AC lower
Screw-taptite -5ea.
Screw-tapping
Harness-AC
1. Attach AC timing belt ass’y to two Gear-AC gear pulley
and then insert two Gear-AC gear pulley to two Shaft-AC-
worm/pulley of AC upper frame caulking ass’y.
2. Insert Gear-AC worm wheel to Shaft-AC-worm/pulley of
AC upper frame caulking ass’y.
3. Assemble AC upper cutter guide ass’y to AC timing belt
ass’y and then insert two Shaft-AC-shaft guide to AC
upper cutter guide ass’y and four holes AC upper frame
caulking ass’y. And assemble two Ring-e hole (ø3.0).
4. Tighten AC motor ass’y to AC upper frame caulking ass’y
with Screw-taptite and Screw-tapping.
5. Tighten Frame-AC lower to AC upper frame caulking
ass’y with four Screw-taptite.
6. Insert
Harness-AC to the connector of AC motor ass’y.
2
1
3
4
5
6
6
7
7
8
8
9
10
10
10
10
10
11
12