User's Manual

AKL01PRF ZigBee Zone Pump Wiring Center
Wiring Guide
Fuse: 5A slow blow, 5x15mm (2AG)
Electrical Connections
Dry Contacts (rated 120VAC, max.2A)
XX Active Pump
120VAC Connections
L
AC Line In
Zone Pump Line Out (max. 1/6 HP)
N AC Neutral
Earth Ground
Issue Date: May 2017
For PDF Installation guide go to
www.salusinc.com
Technical Helpline 1-855-557-2587
Warning
This product must be installed by qualified personnel and the installation must comply with the codes and regulations applicable to the
municipality where this product is installed. Failure to do so could lead to injury, death, or prosecution.
Always disconnect the AC power before installing or working on AC power components.
LED Indicators
Name Color Meaning
Power
120 VAC power ON
Zone 1
Zone pump active
Network
Status
Searching for
network
Paired to a network
Zone Pump
The zone pump will be activated when
the thermostat calls for heat.
Auxiliary Output
XX: Contact closure when zone pump is ON.
Factory Default
To restore the wiring center to Factory Default,
press and hold the Pair button until the
Network Status LED turns off (~10 secs).
Note:
Restoring to Factory Default will remove
the wiring center from the network and delete
all associated devices.
WCID#
Zone LED Pattern:
short=1, long=3
1
2
3
4
5
6
7
8
9
Operational Summary
Wiring Center ID Number

Summary of content (2 pages)