CFIP Lumina Series Full Outdoor Unit Installation Manual Product code: I0DGET01 © SAF Tehnika JSC 2010
Table of Contents 1 Introduction ......................................................................................................................................... 3 1.1 1.2 1.3 1.3.1 1.3.2 2 Revision history....................................................................................................................................... 3 List of Abbreviations...............................................................................................................................
Proprietary notice The information presented in this guide is the property of SAF Tehnika, JSC. No part of this document may be reproduced or transmitted without proper permission from SAF Tehnika, JSC. The specifications or information contained in this document are subject to change without notice due to continuing introduction of design improvements. If there is any conflict between this document and compliance statements, the latter will supersede this document.
BNC connector - Bayonet Neill-Concelman coaxial connector DC – Direct Current FO – Fiber Optics FODU – Full Outdoor Unit FTP – File Transfer Protocol GUI – Graphical User Interface IEEE - Institute of Electrical and Electronics Engineers QPSK - Quadrature Phase-Shift Keying RSL – Received Signal Level RSSI – Received Signal Strength Indicator Rx - Receive SNMP - Simple Network Management Protocol TCP/IP – Internet Protocol Suite (Transmission Control Protocol / Internet Protocol) Tx - Transmission 1.
Figure 1. 2 Getting Started 2.1 Unpacking and Inventory There are two types of packages, - the box for transportation and the commercial package. CFIP Lumina are packed in commercial packages whereas commercial boxes are packed in transportation boxes. Transportation package for two CFIP Lumina contains two trading packages for CFIP Lumina. 2.1.1 Contents of Transportation Package for CFIP Lumina link – – – – – – CFIP Lumina Full Outdoor Unit, 2 pcs.; CFIP Lumina mounting wrench, 2 pcs.
– Necessary tools for assembling the optical or Ethernet cables, power cables and connectors (not included) 2.2.2 Antenna Installation Tools – – – Voltmeter/multimeter with corresponding BNC adapter (not included); Mounting bracket and necessary wrenches, nuts, screws and clamps; Binoculars and compass for clear sight installation (not included). 2.3 Labels 2.3.1 CFIP Lumina Label The label can be found on the front side of the unit.
Notes: – The default IP address of Eth port is 192.168.205.10 or 192.168.205.11 (depends on Low or High band side model) and mask is 255.255.255.0.
5 6 7 Figure 2.1. Assembling DC power weatherproof connector 1. 2. 3. 4. 5. 6. 7. 4.2 You will need: (1-6) DC connector components and (7) ready 2-wire DC power cable. Wider sealing rubber ring should be fitted inside from the front end of (6). Narrower sealing rubber ring should be fitted inside from the rear end of (6). Parts of the DC connector should be put on the cable in the sequence as shown DC power cable should be soldered in any layout – any polarity can be used.
– – Safari v. 3.0 Opera v. 9.50 If everything was connected correctly, you will see a screen similar to this (with no alarm indications): Figure 4. Web Interface - main window Otherwise please refer to “The CFIP Series Full Outdoor Unit Technical Description and Configuration Guide” or contact SAF Tehnika JSC support team techsupport@saftehnika.com STEP 1 To start basic configuration process, you must proceed with the configuration wizard.
STEP 4 • • Enter preferable Tx power and Tx frequency; Press ‘Next step >>’. STEP 5 • • Check the settings; Press ‘Execute configuration’ to confirm your choice. STEP 6 • • Repeat STEP 1-5 for the second CFIP Lumina; Go to ‘Status’ screen to check link operation. 4.
5.2 Attaching CFIP Full Outdoor Unit to Antenna Figure 5. Attaching CFIP Full Outdoor Unit to Antenna Fig. 5(1). You need only one tool to attach CFIP Lumina to the antenna. Fig. 5(2). Check antenna polarization and match it with CFIP Lumina polarization. Note, that antenna feed sticker must be removed before use. Fig. 5(3). Note, that lockings should be positioned in way it is shown on picture. Fig. 5(4). Use two guidance pins or 4 side lockings to choose preferable way of attachment.
5.3 Grounding the Full Outdoor Unit Attach the site ground to the CFIP Lumina using the grounding screw provided on the CFIP Lumina housing, the location of the grounding screw is depicted in the picture below. Grounding screw Figure 6. 5.4 Antenna Alignment 5.4.1 Calculating Expected Received Signal Level (RSL) The expected RSL (receive signal level) can be calculated using “path calculator” provided by SAF Tehnika JSC. 5.4.
peaked for both azimuth and elevation. After the AGC voltages have been peaked on both ends of the link, observe the RSL indicated in Web management window. Ensure that the RSL is within +/- 5dB of calculated RSL. 5.4.3 RSSI Readings To aid in the antenna alignment process, the following chart and table shows typical relationship of the RSL (Rx level) vs. RSSI port output voltage (RSSI – Received Signal Strength Indicator). The evaluated Rx level has the error +/-2 dBm.