User's Manual

Attaching the Ferrite Core to the Network Cable
The ferrite core must be attached to the network cable.
Attach the ferrite core to the network cable before you connect the network cable to
this machine.
For the procedure for connecting the network cable to this machine, see the User
Guide.
CATION
Network cable with a ferrite core must be used for RF interference suppression.
Make a loop about 5 cm (2 inches) from this machine end of the network cable
(1). Attach the ferrite core by enclosing the loop inside it.
Rinmei-MF_NfU_06.indd 1 2009/03/13 14:05:31
Draft 2009/03/17

Summary of content (4 pages)