Installation Manual

Fit everything. Together.
FOR MORE INFORMATION CONTACT:
T
1.604.881.7875
F
1.604.881.7835
www.primex.com
STEP 1
STEP 3
Install horizontal joist and gang box
To ensure a comfortable working height it is recommended that the
top of the gang box be installed 36” from the ground using a level.
Note: Leave at least a 2” buffer zone around base to keep clear from
perpendicular walls.
Remove knock outs
Prior to installation, remove the knockouts for the conduit and
electrical box using a flush cutter tool.
STEP 2
STEP 4
Connect power and install electrical outlet faceplate
At this stage, connect conduit for outgoing and incoming services and
secure with Primex conduit adapters.
Install base over top of the gang box using No. 8 flat
head screws
Install single screw in corner flange, level, then secure with
additional screws.
The Primex Verge WiFi transparent Media Distribution Enclosures
for structured wiring bring reliability when managing today’s
inside cable system requirements. Its flexible design provides a
convenient, lockable and centralized location for easy installation
and distribution of multi-play services within residential and
commercial premises.
P3000 STANDARD FRAME & LID INSTALLATION
PRIMEX
MDE Installation Instructions
Verge MDE
P2100, P3000, P4200, P6300
PRODUCT
MODEL CODE
• DO NOT stretch enclosure walls or lid won’t seat properly.
• DO NOT overtighten mounting screws.
• DO NOT use mounting screws larger than #8.
WARNING
1
4
3
2
Note: Adhere to your local electrical code when installing all cabling.
452-3113

Summary of content (4 pages)