GREEN POWERLINK On-Line Energy Management Solution User Manual © Copyright 2012 The information contained herein is subject to change without notice. This document contains proprietary information, which is protected by copyright. No part of this document may be photocopied, reproduced, or translated into another language without the prior written consent. Feb.
TABLE OF CONTENTS INTRODUCTION...................................................................... 2 HARDWARE FEATURES ......................................................... 3 INSTALLATION....................................................................... 5 Wireless Setup Range.......................................................................... 5 Install Smart Socket............................................................................ 5 Install Smart Power Strip .......................
INTRODUCTION HARDWARE FEATURES Thank you for purchasing the GREEN POWERLINK online energy management ZigBee Tracking Smart Socket solution, an innovative product which is designed to manage home electricity ZigBee Tracking Smart Strip R9P136A600 usage efficiently and reduce home electricity bill. R9P624NI00 In an effort to reduce your electricity bills, why not first check out what appliance uses most energy in your home.
ZigBee Tracking Smart Socket INSTALLATION ZigBee Tracking Smart Strip M9PC020000 M9PG040000 Wireless Setup Range The energy gateway and smart socket/strip/CT meter communicate with wireless technology. To ensure the communication with no interruption, please locate and setup energy gateway, smart socket/strip/CT meter within 100 Ft of range.
Install CT Smart Meter in the circuit breaker panel Install Smart Power Strip The smart power strip allows the user to track electricity consumption of group The CT smart meter allows the user to measure entire electricity powerconsumption from electrical panel. home appliances in the same area and protect it against surge and voltage spikes. 1. Plug in the smart power strip to a powered AC outlet. 2. Plug in the appliances into the smart power strip outlets. 3.
Connect the CT clamps & voltage wires to the current & voltage input terminals Wiring Diagram Refer to the following wiring diagram and dial the mode switch that matches Before installation, please connect the CT clamp wires to the current input your electrical panel type. Then install CT clamp over the power line and terminal following the sequence 1S(red) 1L(black) 2S(red) 2L(black). Then connect voltage wires to L and N voltage terminals.
ENERGY MANAGEMENT GATEWAY INITIAL SETUP 1 Phase & 3 Wire – 2CT Browse and access Gateway within intranet network On IE browser, user can browse the energy information retrieved from smart socket, smart strip and smart CT meter. 1. Enter the Control Panel of PC or notebook GREEN POWERLINK On-Line Energy Management Solution V1.0 10 GREEN POWERLINK On-Line Energy Management Solution V1.
2. Select and double click Network Connections 4. Right‐click the mouse and select Properties 3. Select Local Area Connection 5. Select Internet Protocol(TCP/IP) GREEN POWERLINK On-Line Energy Management Solution V1.0 12 GREEN POWERLINK On-Line Energy Management Solution V1.
. Open Internet Explorer web browser and key in “Http://192.168.1.168 6. Select the “Use the following IP address” option and key in the to enter the gateway operating page. following IP address information in the area, then press OK to exit. IP address: 192.168.1.100 Subnet Mask: 255.255.255.0 Default gateway: 192.168.1.1 10. In the login page, enter the following default User ID and Password to 7.
11. To set up Internet Explorer to work with the energy gateway, click on tools 13. To check for newer version of stored pages, check on “Every visit to the page” and select internet options option then press OK to exit. 12. Select Settings in internet options page to setup temporary internet files option. GREEN POWERLINK On-Line Energy Management Solution V1.0 16 GREEN POWERLINK On-Line Energy Management Solution V1.
Energy Gateway and Smart Metering Devices pairing instructions 4. In the channel page, from CH1 to 9, select which channel you would like to add the smart device to the energy gateway. Then click on connect key to pair up the smart device with the energy gateway. The learning function allows you to expand smart sockets/strips/CT meters later on. You may purchase more compatible smart metering devices and pair up to 9 smart metering devices to the energy monitor. 1.
6. After the smart device and energy gateway finished pairing up, the LED 5. In Channel Name Settings, you can set a name for the channel and press Apply to save it. For smart power strip user, you can set a name for individual outlet. indicator on the smart devices will stop flashing. If the smart device has This will help you to recognize what are the devices connected to smart successfully paired up with the energy gateway, it will display “Connected” in power strip. the column. 7.
Change User ID and Password Electricity Cost and CO2 Emission Setup 1. Click on “User” in the energy gateway operating page. In the event your local utility uses a tariff calculation other than flat electricity 2. Change the User ID to your preference. rate, please key in the average rate that most nearly resembles your utility’s 3. Enter your new password and confirm the new password. tariff schedule. 4. Click on “Apply” to perform User ID and Password change.
Outgoing Server Setup Reset to factory default from energy gateway web server The energy gateway can collect energy database and transmit onto designated server for energy management service. 1. Click on the “Defaults” in the energy gateway operation page. 2. Clink on the “Apply” to reset to factory default. 3. The gateway will be hard reset to factory default setting. Please perform all the 1. Click on “Server” in the energy gateway operating page. necessary setup and channel setting. 2.
2. Select Advanced setup and choose the languag In order for user to browse and access Gateway from internet, the following requirements are needed *Fix public IP address provided by internet service provider (ISP) *Router with Network Address Translation (NAT) service User will first be required to obtain a fix IP address provided by internet service provider, then enable and setup the network address translation (NAT) service in the router.
4. Enable Network Address Translation (NAT) service. 6. In the application page, key in the Gateway IP address information as following example. *Select “HTTP” as Service Name. *Select Port 80 as your Gateway port selection *Key in the IP address of the gateway *Press apply to finish NAT setup 5. Select “Application” 7.
! CAUTION: To assure continued FCC compliance: Any changes or modifications not expressly approved by the grantee of this device could void the user's authority to operate the equipment. FEDERAL COMMUNICATIONS COMMISSION INTERFERENCE STATEMENT This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.