Utility Trailer Wiring Instructions Smart 7 with LampCheck ATIS 2/4/2021
Step 1 – mount Smart 7 to trailer Step 2 – run harness, with approximately 2” of jacket fed through Smart 7 grommet Step 3 – connect ring terminals on main harness to bottom row of studs, as shown in Figure 1 Step 4 – connect .180 male bullet from main harness to female .180 bullet in Smart 7 to supply red power to ABS, as shown in Figure 1.
Step 5 – run harnesses for Automatic Tire Inflation System, with approximately 2” of jacket fed through Smart 7 grommet. Step 6 – connect ATIS wiring and LampCheck ATIS as shown in Figure 2 Figure 2 Note – LampCheck ATIS ground wire will be pre-installed on ground post.
FCC Statement This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.
ISED Statement ‐ English: This device complies with Industry Canada license ‐ exempt RSS standard(s). Operation is subject to the following two conditions: (1) This device may not cause interference, and (2) This device must accept any interference, including interference that may cause undesired operation of the device. The digital apparatus complies with Canadian CAN ICES‐3 (B)/NMB‐3(B). ‐ French: Le présentappareilestconforme aux CNR d'Industrie Canada applicables aux appareils radio exempts de licence.