PAB01 Smart Energy In Wall Meter Fig 2. Assembling This dual meter module is a transceiver which is a Z-WaveTM enabled device and is fully compatible with any Z-WaveTM enabled network. Mini size design let the module can easily hide itself into the electricity distribution box and that will be good for the house decoration. This dual meter module is able to detect Instant power wattage (13800W/230Vac)(60 Fig 1. Assembling Amperes) of connected light or appliances.
Adding to Z-WaveTM Network a node ID to the meter. Inclusion 1. In the front casing, there is an on/off button with LED indicator below which is used to Have Z-Wave Controller entered One press one flash inclusion mode. carry out inclusion, exclusion, reset or association. After being excluded, its LED 2. Pressing INCLUDE_BUTTON three flashes on and off alternately and repeatedly at 2-second intervals.
※Including a node ID allocated by Z-Wave Controller means inclusion. Excluding a node Installation ID allocated by Z-Wave Controller means exclusion. ※Failed or success in including/excluding the node ID can be viewed from the Z-Wave Controller. LED Indication To distinguish what mode the meter is in, view from the LED for identification.
Programming , 1. Z-Wave’s Groups (Association Command Class Version 2) The meter can be set to send reports to associated Z-Wave devices. It supports 3 association groups which every group has one node support.
Size = 4 Bytes (Meter Value) Precision = 2 Meter Value 1 = (W) MSB Scale = 0x00 (KWh) Meter Value 2 = (W) Size = 4 bytes (Meter Value) Meter Value 3 = (W) Meter Value 1 = (KWh) MSB Meter Value 4 = (W)LSB Meter Value 2 = (KWh) Meter Value 3 = (KWh) Example: Meter Value 4 = (KWh) LSB Meter Value 1 = 0x00 (W) Meter Value 2 = 0x00 (W) Example: Meter Value 3 = 0x03 (W) Scale = 0x00 (KWh) Meter Value 4 = 0xEA (W) Precision = 2 Meter(W) = Meter Value 3 *256 + Meter Value 4 = 100.
When receiving Meter Get Command, it will report Meter Report Command to the node asked. 2-2-5 AC load current ( I ) When receiving Meter Get Command, it will report Meter Report Command to the node asked.
AC load current = (Meter Value 1*256) +(Meter Value 2)= 2.89 (A) 2-3 Multi Channel Command Class Version 3 2-2-6 load power factor (PF) When receiving Meter Get Command, it will report Meter Report Command to the node asked. If the value of configuration parameter 3 is 1, it will report the power factor of CT1, but not the sum of PF of CT1 and CT2.
Command =0x05 COMMAND_CLASS_MULTI_CHANNEL 2-3-5 METER_GET: MULTI_CHANNEL_CMD_ENCAP Using meter get command to get the KWH,W,V,I,PF from endpoint of PAB01 Source End Point = 0x03 2-3-5-1 Get KWH from endpoint (Bit Address+Destination End Point = 0x01) Command Class = 0x32 Command =0x04 (Command_Class_Meter_V3 = 0x32) (Meter_Supported_Report = 0x04) Parameter 1 = 0x81 (Meter Reset =1 , Meter Type=0x01) Parameter 2 = 0x75 (Scale Supported = Meter_GET example: COMMAND_CLASS_MULTI_CHANNEL MULTI_CHAN
(Bit Address+Destination End Point = 0x05) (Bit Address =0;Destination End Point = command owner Endpoint value) Command Class = 0x32 Command =0x02 Parameter 1 = 0x21 (Meter_Report = 0x02) (Scale Bit2 = 0 ,Rate Type = 0x01, range 1~3) Command Class = 0x32 ( Command_Class_Meter_V3 = 0x32) Command =0x01 (Meter_Get = 0x01) Parameter 1 = 0x10 (Scale = W = 0x02) (Precision = 2,Scale Bit1Bit0 = 0,Size = 4) Parameter 3 = 0x00 0x03) (Bit Address =0;Destination End Point (Command_Class_Meter_V3 = 0x32)
Instant Power Consumption = Parameter 4 = 0x00 0x000003EA Parameter 5 = 0x03 = 100.
(Bit Address+Destination End Point = 0x03) (Bit Address =0;Destination End Point Parameter 4 = 0x2B range1~3) 2-3-5-5 Get power factor PF from endpoint Meter_GET example: Command Class = 0x32 ( Command_Class_Meter_V3 = 0x32) Command =0x01 (Meter_Get = 0x01) Parameter 1 = 0x28 (Scale = A = 0x05) COMMAND_CLASS_MULTI_CHANNEL MULTI_CHANNEL_CMD_ENCAP Source End Point = 0x05 (this is the endpoint of command owner, here we assume endpoint is 5,if the owner PAB01 AC input current (I) example: doesn’t s
(Bit Address+Destination End Point = 0x05) Meter (Bit Address =0;Destination End Point = 0x7FFF hour Report command owner Endpoint value) Period 3 Command Class = 0x32 Command =0x02 (Command_Class_Meter_V3 = 0x32) Slected 1 1-3 1 End Point 2:CT1 3:CT2 (Meter_Report = 0x02) Parameter 1 = 0xA1 (Scale Bit2 = 1 ,Rate Type = 0x01, Parameter 2 = 0x51 Parameter 3 = 0x63 1:CT1 and CT2 4 Threshold Meter Type=0x01) of Current (Precision = 2,Scale Bit1Bit0 = 0x10,Size for Load = 1) Caution
If the setting is configured for 1hour (set value =720), the PAB01 will report its This is a warning when the current of load over the preset threshold value, If the Accumulated Power Consumption (KW/h) every 1 hour to the node of correspond setting value is 750, when the load wattage of CT1 or CT2 over 7.5A, PAB01 will Group. The maximum interval to report its Accumulated Power Consumption send current Meter Report command to the node of correspond Group. (KW/h) is 45 hours (5s*32767/3600=45hr).
FCC ID : RHHPAB01 Troubleshooting Symptom Cause of Failure Recommendation The meter is not working 1. The meter is not 1. Check power connections and LED off connect to the Main power 2. Don’t open up the meter and send it for repair. 2. The meter break down The meter cannot report to 1. Not carry out the group association 1. Carry out association 2. Wait for a while to re-try 2.