User's Manual

M7X and M7R Page 5-7 Maintenance
Back to Menu
Unscheduled Maintenance
The unscheduled maintenance detailed in this documentation describes diagnosis using the Built-In-Test
facility and rectification by module replacement.
An M7 radio weighs up to 26 kg. A minimum of two people should be used to lift the radio.
Special consideration should be given if the radio has to be lifted at height, for example from
the top of an equipment cabinet. Failure to take the necessary precautions can result in injury
to personnel.
All procedures given in this topic assume that the faulty radio has been removed from its operational
position and placed on a suitable work-bench.
This equipment contains devices sensitive to electrostatic discharge. Precautions applicable to
handling such equipment, including anti-static work surfaces and protection using wrist straps
connected to earth, should always be taken.
Tools and Test Equipment
The following tools and test equipment will be required to perform the unscheduled maintenance
procedures detailed in this documentation:
(1) Torx Screwdriver, size T10.
(2) Torx Screwdriver, size T15.
(3) Torx Screwdriver, size T20.
(4) Frequency counter able to measure 10.000 000 MHz. (when replacing the Processor module).
Part Numbers
Part numbers for the modules and other replaceable items are listed in Table 5-1.
WARNING Heavy Item
Caution ESDs

Summary of content (20 pages)