> ome ree FLOATING CANOPY TRACK HEAD INSTALLATION 1. Place frack head in desired position and insert top of ack head connector into frack. 2, Relate connector 90F until track head locks into place on frack, (See illustration D). IMPORTANT: If connector does not tum freely, do not force! instead, tum in opposite direction. 4. To reposition or remove track head, pull down on the connector and rotate 90° EE — CAUTION: Refer to the revamping label located near the placeholder for recommended maximum wattage.