Instructions / Assembly

PIPE COVER
Installation Manual
2
PC-10S
Included Accessories
Check for any missing items before starting installation.
Requests to Installers
Read this Installation Manual
carefully, and then install the
Pipe Cover according with this
Installation Manual.
WARNING
Completed Image
Water Heater
The shape may differ
depending on the water
heater.
1
Installation
3
4
SBB819Q
Part #
Part
Q'ty
Part #
Part
Q'ty
1
Left Side Cover
Bottom Bracket - Back
1
2
Right Side Cover
Tapping Screw w/ PW
14
3
Front Cover
M4 Machine Screw
2
4
Top Bracket - Front
10
Panel Screw
2
5
Top Bracket - Back
11
Wood Screw
2
6
Bottom Bracket - Front
12
Wall Anchor
2
On the Water Heater ;
(a) Remove 4 screws on the Front Cover.
(b) Remove 2 screws on the both Side Cases.
(a)
(a)
(a)
(a)
(b)
(b)
Assemble the 4 Brackets into the Side Covers
referring to the following instruction.
STEP 1
Secure 4 Brackets to
the Left Side Cover.
1
5
4
6
7
8
STEP 2
Secure opposite side
cover (Right Side Cover).
2
8
Secure the "pre-assembled side covers"
to the Water Heater.
(b)
9
9
12
12
11
11
Secure the Front Cover by the Panel Screws
referring to the following instruction.
Fit the Front Cover onto the
Bottom Bracket carefully.
10
10
NOTE
Before securing the pre-assembled side covers to
the Water Heater, make two holes* on the wall using
a drill for Wall Anchors. And then insert the Wall
Anchors into the wall. (Light tapping with a hammer
on the Wall Anchors may be necessary.)
* Hole Diameter : Φ9/32" (Φ7.2mm)
* Hole Depth : 1.4" - 1.6" (35 - 40mm)
9
9
3
3
(b)
Securely affix using Panel Screws
When tightening (or loosening) the Panel
Screws, be aware of the section without thread
(as illustrated below), and continue turning
until secured (or removed).
«When mounting» Turn horizontally while pressing
the Panel Screw in.
«When removing» Turn horizontally while pulling
the Panel Screw out.

Summary of content (1 pages)