User's Manual

Installing the plinth (continued)
Plinth on the pole
Note that the length of mounting screws
depends on the diameter of the pole.
Please see the user manual for details.
(Note that installations is shown. See the user manual if the pole mounting kit is used.)FPKA VMPB
1. Fix the upper mounting bracket on
the pole. Attach the mounting bracket
screws (M10) on the bracket. Tighten
screws to 30 Nm.
2. Fix one side of the lower pole
mounting bracket on the plinth with
mounting screws (M8). Tighten
screws to 20 Nm.
3. Lift the plinth on the pole and fit it to
the mounting screws of the pole
mounting bracket. Tighten screws
(M8) to 20 Nm.
4. Place the counterpart of the lower
pole mounting bracket in its place.
Tighten screws (M10) to 30 Nm.
6. Ground the plinth to the site main
ground.
5. If a second plinth is required, install
it on the other side of the pole
mounting bracket.
3
6
1
30 Nm
5
30 Nm
2
20 Nm
4
20 Nm
Plinth is installed according to instructions.
Plinth is level.
Check list
Grounding principle
1. Ground the plinth to the site main
ground. Tighten to 8.0-10.0 Nm (5.9-7.37 ft-lb)
2. Connect the wrist strap.
to ESD stud
Wrist strap
Antistatic wrist strap is used when handling modules.
Check list
Plinth is grounded.
Local grounding (earthing) regulations are followed.
Grounding the plinth
4

Summary of content (2 pages)