Specification

Installation Instructions
Towel Ring / Garment Hook
Model No. 75-09, 75-12
1. Drill holes in wall at points marked using the appropriate drill size:
· Wood Screw (#10 x 1 3/4”) - use: 1/8" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill
2. Fasten BASE (1) to wall using either WOOD/TOGGLE SCREWS (2). (See Fig. 1)
Align the BASE (1) so that upper flat is level.
3. Thread ESCUTCHEON (3) onto BASE POST (1). (See Fig. 2)
4a. Towel Ring: Slide END POST (5) onto BASE POST (1) and secure into place with
SETSCREW (4). (See Fig. 3)
4b. Garment Hook: Slide END POST (5) onto BASE POST (1) and secure into
place with SETSCREW (4). (See Fig. 4)
Fig. 1
Fig. 3
Fig. 4
5
4
4
5
1
2
Fig. 2
1
1
3
1
Recommended Installation by a Professional Contractor
(949)417-5207
NWP-75-09 Santa Ana CA 92705 12/5/2011
www.brasstech.com

Summary of content (1 pages)