Instructions / Assembly

Check Box for These Contents
In the event of missing or defective parts please call our customer service
dept. at
1 800 282 9346, ext #20
(Mon. to Fri. 8:00 AM to 4:00 PM EST).
1.
Arched Top Rail
(1)
2.
P
ost Caps (2)
3.
P
osts (2)
4.
Vertical Spindle Left
(1)
5.
Vertical Spindle Right
(1)
6.
Horizontal Spindles
(4)
7.
Diamonds
(2)
8.
Bottom Rail
(1)
9. Ground Anchoring Stakes (2)
10. Hardware (in plastic bag)
a) 5/8” Self-Auguring Stainless Steel Screws (12)
b) #2 Robertson Drill Bit (1)
Tools You Will Need
• Cordless Drill
• Hammer
Tape Measure
• Level
• Shovel
General Information
Read Instructions through carefully before beginning assembly.
When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
We recommend an area approx 5’x 8’ for unobstructed assembling.
You should not need to use excessive force when assembling components.
The Milan Trellis
Please read through before starting assembly.
ASSEMBLY INSTRUCTIONS
1
www.edenarbors.com
1
2
10
a
b
Not to Scale
8
59.26
4
27.27
55.26
20
3
4
5
6
7
9
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.

Summary of content (3 pages)