Installation, Manual Installation,Operation Operation &&Maintenance Maintenance Manual Installation, Operation and Maintenance Manual iSteam 3 Control iSteamAQX ® Linear Steam Head Residential Model: 104480 ____________________ MPORTANT: Leave this material with t he homeowner. ______ _ _ _ _ _ _ _ _ _ _ _ _ _ mr.steam l mr.steam ® ® Feel Good Inc. Feel Good Inc.
® When installing and using this electrical equipment, basic safety precautions should always be followed, including the following: READ ME FIRST! RE A D M EAs FyouI R S Tthese ! ! follow instruc-tions, you will notice warning As you these and caution symbols. Thisfollow blocked instructions, you will notice warning information is impor-tant for the safe and This andcaution eff icientsymbols. installation andblocked operation information is impor-tant theof safe of this generator.
® Table of Table ofContents: Contents: Box Contents: Box Contents: Important Safety . . . .. .. .. .. .. .. ..... .. .. .. .. .. .. .. ..... .. .1 .1 Important SafetyInstructions Instructions • iSteamAQX • Control iSteam®3 Control • iSteamAQX Hub IINSTALLER N S T A L L E R INFORMATION I N F O R M AT I O N • Control Cable (30 ft.) • Power Supply Installation Template . . . . .. .. ..... .. .. . . . .. .. ..... .. .. . . . .. .. ..... .. .1 .
INSTALLER INFORMATION ® Before Installing Before Installing ! WARNING To avoid unintentional steambath opavoidthe unintentional steambath operation, eration, do notTolocate control where other controls, do not locate the control where other controls, accessories, accessories, shower heads, valves, body sprays or simishower valves,could body sprays similar within the lar withinheads, the shower cause or confusion or interfere shower could cause confusion or interfere with the MrSteam with the MrSteam con
INSTALLER INFORMATION ® Locating the Control Locating the Control 1b Determine the desired installation location of the control. The Determine the desired installation location of the control. The iSteam®3 iSteamAQX controls are designed to be installed inside or outside the controls be installed insideIf or the steam room steam roomare as designed a matter ofto personal preference. theoutside control is installed as a matter of personal preference.
INSTALLER INFORMATION ® STEP 1 Installation with Optional Rough-In Box Make a 1 1/4" diameter hole in the desired control location. (cont.) IMPORTANT NOTE: Be careful not to strain, staple, pinch or otherwise damage the cables. Route cables as required to permit STEP 1 replacement. Do not route cables inside conduit together with power Route the control cable from the wall cutout to the lines or close to hot water or steam piping. Hydtrotouch Hub.
INSTALLER INFORMATION ® ® InstallationInstructions Instructions iSteam 3 Installation forfor iSteamAQX STEP1.1 Step PLUGthe thehub 30’securely. control The cable pigtail (1a). Mount hubinto maythe be iSteam3 mounted control in any orientation. Plug the 30 foot generator cable into the generator and into the hub. Turn the generator on and test the control to verify correct connection. With proper proceed to Step 2. Do not force function, or twist cable ends together.
INSTALLER INFORMATION ® Installation Instructions for iSteamAQX (cont.) STEP 22 STEP 2a Peelthe thedouble double stick adhesive off back the back Peel stick adhesive off the of theof the iSteamAQX control(2a). (2a).Apply Apply a bead iSteam3 control beadofofsilicone siliconearound around the control to to create therear rearofofthe theiSteamAQX iSteam3 control createaamoisture moisture seal feed thethe cables into into the rough-in box seal(2b). (2b).
® H O M E O W N E R R REA E FFI RI R S!T ! E AD D M ME ST Asyou youfollow follow these these As As you follow these instruc! WARNINGyou instruc-tions, will notice warning and instructions, willwarning noticeand warning tions, you willyou notice caution caution symbols. This blocked and caution symbols. This blocked symbols.
® USER/HOMEOWNER INFORMATION Turning iSteamAXQ On and Off: • To power the iSteamAQX on, momentarily press the button on the bottom edge. • To power the iSteamAQX off, press and hold the button on the bottom edge of the control. Follow the onscreen prompts for power the iSteam AQX off • Show picture with arrow pointing to the button. Care Tips Use only mild soap and water on a soft cloth to clean the control. Do not use abrasive cleansers. Safety and Operating Information the duration at 10 minutes max.
® USER/HOMEOWNER INFORMATION FCC Statement: ISED Statement: Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This device contains licence-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canada’s licence-exempt RSS(s). Operation is subject to the following two conditions: 1. This device may not cause interference. 2.
® USER/HOMEOWNER INFORMATION mr.steam ® Feel Good Inc. ® www.mrsteam.com Products, information and specifications are subject to change without notice. Please call Technical Support at 1.800.76.STEAM (East Coast) or 1.800.72.STEAM (West Coast) for more information. The model and serial number is printed on the data plate on the front of the steam bath generator. Have this information available when contacting Technical Service. mr.steam Warranty ® I hello@mrsteam.com I www.mrsteam.