User Manual

MP-L28-600 INSTALLATION INSTRUCTION
3. Installation and operation instructions
Note: please read the instructions carefully before installation!
1. Technical Parameter
2. Parts List
Please check the parts in the package in comparison with the following list,make sure all of
the parts are in the package. Never use defective parts, never replace part with different specification.
Max VESA: 600×400 ; Maximum load: 77lbs.
(B)10x60 Plastic Anchor (6)
(D)Φ6 Flat washer (4)
(I)Φ6 Flat washer (8)
(C)Φ8 Flat washer (10)
(F)M6x25 screws(4) (H)M6x8 screws(8)(G)M8x25 screws(4)
(J) 10mm Outside Wrench (1)
(E)12mm Plastic Sleeve (4)
STEP1
STEP2
Lift
Step 1:
Unscrew 2 Pcs of nuts
at the back of the TV plate. Lift
up and take TV plate.
WALL
STEP1
STEP3
A
C
B
H
STEP4
STEP5
VT
Step 5:
Install the monitor/TV to the front plate
with suitable screws selected from the parts
bag.
F/G
E
C/D
STEP6
STEP7
Step 6:
a:
Hang the TV Plate with the TV Set
onto the arm connect part and screw
tighten at last.
b:After the TV is installed, use the level
adjustment to make sure the TV is level
before moving forward.
+2°
-12°
a
H
I
I
+3° -3°
b
(A) M7x80 Self-tap Screw (6)
Step 2:
Use the wall plate as a template to
drill six holes of dia. 10mm and
80mm depth in the wall.Then wedge
six plastic anchors into the holes.
STEP2
WALL
WALL
B
Step 4:
Select the M6x8 screws to fix the adaptors
with the TV Plate
Step 7:
The knobs should be loosened
before adjust the angle of view for
the flat panel TV between +2°~-12°
After the position has been determined,
the knobs should be screwed down
furthest.
J
J
J
Step 3:
Fix the wall plate with six lag
bolts

Summary of content (1 pages)