Users Manual Part 3

28 / 29
INSTALLATION AND OPERATING INSTRUCTIONS FOR OEM USE ONLY
© 2018 Mertik Maxitrol GmbH & Co. KG, All Rights Reserved.
DRAFT 21/11/2018
ON-OFF
UP
DOWN
Wall Switch (optional)
G6R-ZWSE(N)…
Power Flue Control
(not available from
Mertik Maxitrol)
Receiver
B6R-R8(9)P…
RECEIVER FOR POWER FLUE CONTROL, FAN, LIGHT / DIMMER, LATCHING SOLENOID, AUX (VOLT-FREE CONTACT)
Relay with Cable (volt-free contact)
G6R-CL40 (50 V / 0.6 A)
G6R-CLB40 (240 V / 5 A)
Power Flue Control
The receiver has an additional connection to start the power ue control.
With a bistable relay at the cable the receiver controls the start function of a Power Flue Control.
A solenoid valve must be installed downstream from the GV60. In case a 2nd burner is installed,
the Solenoid Valve has to close both burners. If the Solenoid Valve is installed upstream of the
valve a pilot gas position would not be possible.
Solenoid Valve
(Required for Power Flue Control)
Gas Combination
Control
GV60…
Pilot Burner
G30-ZP2M-L
For Relay with Cable strain reliefs
required, min. 30 N.
(to be mounted by installer)
Figure 29
Power Flue Control, solenoid valve, fan and pressure switch are not available from Mertik
Maxitrol. The Power Flue Control operates the fan and the solenoid valve and checks the pres-
sure switch. When there is the required draft, the solenoid valve opens. For safety, the solenoid
valve must close in case of power outage.
The B6R starts the Power Flue Control with the ignition sequence and when the motor leaves
the pilot gas position and stops it at shut off and in pilot position.
Main Burner 1Main Burner 2
LightFan
Fan
Draft
Switch
Start
in
Latching Solenoid Valve
Mains Power
(115 / 230 V; AC)
V Module G6R-BUMV3

Summary of content (7 pages)