Quantum 2200 High performance, all outdoor Mobile WiMAX base stations PureWave Quantum 2200 Installation Guide v2.
Quantum 2200 Installation Guide v2.1 © PureWave™ Networks 2011. All rights reserved. PureWave™ Networks has prepared this manual for use by PureWave Networks personnel, licensees, customers, and customers of customers. The information contained herein is the property of PureWave Networks and shall neither be reproduced in whole nor in art without prior written approval from PureWave Networks.
Quantum 2200 Installation Guide v2.1 Contents Contents ........................................................................................................................................................ 3 Figures ........................................................................................................................................................... 5 Tables ................................................................................................................................
Quantum 2200 Installation Guide v2.1 8 7.2 Preparing the Ethernet and Console Cables ............................................................................... 28 7.3 Weatherproofing the Ethernet and Console Connections ......................................................... 29 Connecting DC Power and Ground ..................................................................................................... 31 8.1 Base Station Single-Point Grounding ...........................................
Quantum 2200 Installation Guide v2.1 Figures Figure 1: PureWave Quantum 2200 Base Station .............................................................................. 11 Figure 2 Mounted PureWave Quantum 2200 .................................................................................... 11 Figure 3: Base Station Connectors..................................................................................................... 13 Figure 4: Base Station Mounting Holes ....................................
Quantum 2200 Installation Guide v2.1 Tables Table 1: Quantum Environmental and Mechanical Specifications ...................................................... 12 Table 2: Base Station LED Description ............................................................................................... 13 Table 3: Base Station Connector Descriptions ................................................................................... 14 Table 4: PureWave Quantum Base Station Pole Mount Kit Contents.................
Quantum 2200 Installation Guide v2.1 Regulatory Notice This device complies with the FCC limits a class B digital device, pursuant to Part 15 of the FCC Rules. A complete list of regulatory certifications can be provided by PureWave upon request. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
Quantum 2200 Installation Guide v2.1 Safety Precautions When installing this equipment, please observe the following precautions to minimize the risk of danger or personnel injury: NEVER install equipment if there is a chance of lightning or other adverse weather conditions. NEVER install equipment in a wet location unless the equipment is specifically design for wet locations. NEVER touch un-insultated wires or terminals unless the wire has been disconnected from any equipment.
Quantum 2200 Installation Guide v2.1 1 Preface 1.1 About This Document This guide is intended for use by a professional installer who performs the physical installation of any PureWave Quantum 2200 Base Station. It does not cover base station functional setup or operation. For detailed information about setup and operation of the PureWave Quantum 2200 Base Station, please refer to the Quantum 2200 User’s Guide.
Quantum 2200 Installation Guide v2.1 If you have purchased a 6-Port Antenna Panel or other antenna(s) from PureWave then it is packaged in a separate box along with its mounting kit and instructions. Please refer to the instructions provided with your antenna(s) for proper mounting procedures. Connection of the antennas to the base station is covered within this guide. 1.
Quantum 2200 Installation Guide v2.1 2 Base Station Basics 2.1 Physical and Environmental Specifications The PureWave Quantum 2200 Base Station (Figure 1) is made up of a single, weather-resistant enclosure with overall dimensions 17.5” x 16.7” x 5.3” (44cm x 42cm x 13cm). The base station is a single selfcontained unit and has no user-serviceable components.
Quantum 2200 Installation Guide v2.1 2.2 Physical and Environmental Specifications Table 1 lists the mechanical, electrical, and environmental properties of the PureWave Quantum Base Station. Physical & Environmental Specifications Dimensions 17.5” x 16.7” x 5.3” (44cm x 42cm x 13cm) Weight 32lbs (14.5kg) (does not include mounting hardware) -48 VDC 90 Watts Max -40C to +55C (ETSI EN 300 019-1.4 Class 4.
Quantum 2200 Installation Guide v2.1 2.3 Connectors and Indicators Figure 3 shows the bottom panel of the base station, where all the connectors and indicators are located. Figure 3: Base Station Connectors The base station connector panel contains 3 high-intensity LEDs that are intended to be viewable from the ground for quick confirmation of the operational state of the base station. Table 2 describes the function of each LED. LED STATUS LINK POWER Function Green - BS is up and running normally.
Quantum 2200 Installation Guide v2.1 Connector Function -48VDC power source inputs for the unit. POWER ETH-1 DC power connector: Fits Tyco P/N 796095-2 connector. This M5 screw provides a ground connection point to the base station. It is the installer’s responsibility to ensure that the unit is professionally grounded and complies with all relevant local codes. N-type connector for mandatory external GPS antenna. 3.3V power on center pin.
Quantum 2200 Installation Guide v2.1 3 Mounting the Base Station 3.1 Fundamentals The back side of the base station includes 6 metric M8-1.25 threaded mounting holes, as shown in Figure 4. Figure 4: Base Station Mounting Holes Because the mounting holes are recessed, provisions must be made to provide for spacing between the mounting points and the mounting bracket or surface, as exemplified in Figure 5.
Quantum 2200 Installation Guide v2.1 3.2 The Pole-Mount Kit The optional PureWave Quantum Base Station Pole Mounting Kit provides all hardware required for installing the base station on a pole ranging from 2.5-5 inches in diameter. It is important to note that the use of a pole mount in no way dictates that the base must actually be deployed on top of a long pole, although in many cases it will in fact be.
Quantum 2200 Installation Guide v2.1 If you have ordered the pole mounting kit then it was shipped in the same box as the base station. Please locate the kit and compare its contents to Table 4. Item Quantity Purpose a) Front Pole Mount Plate 1 Grips pole along with back pole mount plate (b). The base station mounting bracket also connects to this piece. b) Back Pole Mount Plate 1 Grips pole along with front pole mount plate (a).
Quantum 2200 Installation Guide v2.
Quantum 2200 Installation Guide v2.1 Front Mounting Plate Rear Mounting Plate Figure 9: Pole Mounting Plates First mount the Base Station Mounting Bracket (Figure 8: Base Station Mounting Bracket) to the base station using the provided hardware, as indicated in Table 4. When installing the base station mounting bracket onto the base station, be sure to align it as shown in Figure 10.
Quantum 2200 Installation Guide v2.1 The next step is to mount the front and back pole mount plates (Figure 9) to the pole, using the provided hardware as indicated in Table 4. Nylon tie wraps have been provided for convenience to temporarily affix the front mounting plate to the pole during the installation process. A selection of carriage bolts has been provided to accommodate a variety of pole diameters. Select a set of 4 bolts that enable a secure fit to your pole.
Quantum 2200 Installation Guide v2.1 4 Mounting the Antennas PureWave Quantum Base Stations can be deployed with virtually any type of antennas that operate in the relevant frequency band and that meet regional regulatory standards.
Quantum 2200 Installation Guide v2.1 5 Connecting the Antennas to the Base Station 5.1 Installation of Lightning Surge Protectors In most environments it is essential for the base station to be installed with external protection against surges caused by lightning on the antenna cables. PureWave therefore recommends that suitable surge protectors be installed on each base station antenna connector.
Quantum 2200 Installation Guide v2.1 Specifications for the PureWave Quantum Surge Protection Kit are summarized in Table 6. Surge Protector Feature Specifications Surge Capabilities IEC 1000-4-5, 8/20μs @ 10kA Frequency Range 2-6GHz Return Loss > 20dB Insertion Loss ≤ 0.2dB RF Power Limit 10 Watts Max Temperature -40 C to +85 C Relative Humidity 0-100% condensing Surge Throughput Energy ≤ 0.
Quantum 2200 Installation Guide v2.1 5.2 Connecting the Antennas to the Base Station The base station has two N-type antenna connectors that must be attached to each installed antenna using high-quality coaxial cable, as discussed in Section 4. The number of connectors/adapters used should also be minimized as they are especially lossy. Most industrial-grade antennas, including all PureWave antennas, utilize N-type connectors.
Quantum 2200 Installation Guide v2.1 6 Installing the GPS Antenna WiMAX base stations utilize GPS (the Global Positioning System) to maintain tight synchronization and coordination among themselves in a network. This assures that all base stations in the network transmit and receive in harmony, as they must all utilize the same Downlink / Uplink Ratio. 6.
Quantum 2200 Installation Guide v2.1 6.2 Connecting the GPS Antenna to the Base Station The base station utilizes an N-type GPS antenna connector. The GPS antenna that comes as part of the optional GPS Antenna Kit also has an N-type connector. Prepare a high-quality coaxial cable of the appropriate length and with the appropriate connector types for use in connecting the GPS antenna to the base station.
Quantum 2200 Installation Guide v2.1 7 Connecting Ethernet and Serial Console Cables 7.1 The PureWave Basic DC Installation Kit Each PureWave Quantum Base Station is shipped with the PureWave Quantum Basic DC Installation Kit, which contains hardware and components required for connecting and waterproofing the Ethernet ports, console port, the power port, and the grounding terminal. This kit has been shipped in the same box as the base station. Please locate it and compare its contents to Table 7.
Quantum 2200 Installation Guide v2.1 7.2 Preparing the Ethernet and Console Cables ETH-1 and ETH-2 connectors should both be run from the base station to the operator’s network equipment. The CONSOLE connection may be connected for initial provisioning and thereafter on an asneeded basis or it may be permanently connected as with the Ethernet connections.
Quantum 2200 Installation Guide v2.1 Figure 15: T-567B RJ-45 Connector 7.3 Weatherproofing the Ethernet and Console Connections If the CONSOLE port is not to be permanently connected then it should remain tightly capped for the time-being. A serial cable, a 6” Cat-5 cable, and a DB9 to RJ-45 adapter has been supplied with the PureWave Quantum Basic DC Installation Kit for bring-up and provisioning purposes utilizing the CONSOLE port.
Quantum 2200 Installation Guide v2.1 Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7: Step 8: Step 9: Slip the Sealing Nut onto the RJ-45 cable. Place the screw nut onto the housing with the threads facing forward Insert the seal into the housing Insert the cable through the seal and housing exiting the front of the housing Strip cable sheath Crimp the RJ 45 plug onto the cable Pull the cable back so the plug fits into the housing.
Quantum 2200 Installation Guide v2.1 8 Connecting DC Power and Ground 8.1 Base Station Single-Point Grounding Extensive analysis and investigation of installations has led to the belief that the root cause at the heart of the majority of power-related failures is likely to be the presence of multi-point grounding of equipment. Single point grounding eliminates ground voltage differentials and thus dramatically increases equipment survivability during surges.
Quantum 2200 Installation Guide v2.1 This DC power connector assembly has been provided as part of the Basic DC Installation Kit (Table 7) and consists of a 4-pin female power connector plug, a set of crimp contacts, and a cable clamp. The connector with pin assignments is shown in (Figure 18). Figure 18: IP67 DC Power Connector and Pin Assignments To successfully complete the power cable assembly you will need the following tools (not provided).
Quantum 2200 Installation Guide v2.1 Step 1: Use wire strippers to remove about 1/4 inch of insulation from each wire and approximately 1” of outer cable insulation. It is important that each wire be the same length, with equal lengths of stripped wire. Step 2: Slide the circular socket connector over the power cable as shown in Figure 20. Figure 20: Slide connector onto cable before crimping.
Quantum 2200 Installation Guide v2.1 Figure 22: Side and top views of correct crimping technique Figure 23: Properly completed first crimp Step 5: Crimp the cable again at the second crimp location by starting with the “A” side of the crimping tool (Figure 24). Release crimping pressure when the second crimp location begins to curl. Next place the second crimp location in section “B” of the tool (Figure 25) and securely complete the crimp.
Quantum 2200 Installation Guide v2.1 Figure 24: Start the second crimp with tool section “A”. Figure 25: Complete the second crimp with tool section “B”. The fully completed pin is shown in Figure 26. Now repeat Steps 3-5 for each of the three additional pins.
Quantum 2200 Installation Guide v2.1 Step 6: Using your fingers, insert the crimped pins into the corresponding holes of the DC power connector plug (Figure 27). Be sure to match the pin-out as specified earlier. Figure 27: Pins inserted into DC power connector Step 7: Next use needle nose pliers to insert the pins further by grabbing the first crimp location and pushing all the way into the connector body. It helps if you place the connector face down on a table to provide extra leverage.
Quantum 2200 Installation Guide v2.1 Figure 29: Use insertion tool to secure the pins in the plug. Figure 30: Front view of plug with crimp pins properly inserted Step 9: Complete the assembly by screwing the plug into the circular socket connector and secure with the cable clamp by tightening the two strain-relief screws using a Phillips screwdriver. The completed assembly is shown in Figure 31.
Quantum 2200 Installation Guide v2.1 Appendix A Connector Weatherproofing Required Materials PureWave recommends that appropriate weather protection sealing be applied to all “outdoor” installed elements of the system. Weatherproofing tape kits can very effectively seal the junction between mating connectors. Proper and diligent weatherproofing not only protects the connection from water damage, but also prevents vibrations from loosening the interface.
Quantum 2200 Installation Guide v2.1 Weatherproofing Procedures The following procedure is illustrated for an N-type antenna connector (without surge connector) but applies to all connector types. Step 1: Tighten the connection with a torque wrench to the proper torque value (12-15lbs for an Ntype connector) to ensure that correct internal seals and surface contacts are made. One recommended torque wrench for an N-Type connector is the Andre 244379 and is shown in Figure 33.
Quantum 2200 Installation Guide v2.1 Figure 35: First Rubber Tape Layer Step 4: Start wrapping a layer of 2” (50-mm) plastic tape 1” (25 mm) below the rubber tape, overlapping at half width (Figure 36). Finish the wrap at the flange of the antenna connector and cut the tape.
Quantum 2200 Installation Guide v2.1 Figure 37: Wrapping ¾”Plastic Tape 1” Below Previous Wrap Step 6: Inspect your weatherproofing job for quality. Any exposed areas will quickly become problematic. Repeat for all remaining connectors.
Quantum 2200 Installation Guide v2.1 Appendix B Warranty Statements Hardware PureWave, Inc (“PureWave” or the “Company”) warrants to the end-user (“Customer”) that this hardware product will conform in all material respects to the specifications provided with the hardware and will be free from defects in workmanship and materials, under normal use and service, for a period of 365 days from the date of original shipment by PureWave.
Quantum 2200 Installation Guide v2.1 This limited warranty is VOID if failure of the Software is due to modification of the Software not made by PureWave, or the abuse or misapplication of the Software. PureWave does not warrant that the Software is error free, that the Customer will be able to operate the Software without problems or interruptions or that the Software or any equipment, system or network on which the Software is used will be free of vulnerability to intrusion or attack.
Quantum 2200 Installation Guide v2.
Quantum 2200 Installation Guide v2.1 Table 9 summarizes the conditions and charges that PureWave reserves the right to levy.
Quantum 2200 Installation Guide v2.1 (vi) (vii) When an advance replacement is provided and Customer fails to return the original product to PureWave within fifteen (15) days after shipment of the replacement, PureWave will charge the Customer for the replacement product, at list price. The shipment of advance replacement products is subject to local legal requirements and may not be available in all locations.