CATALOG Product Image Accessory Detail “A Installation Notes BA Tools Required Installation Steps Safety Tips Customer Service
PARTS LISTING Aluminum punch template Wall Bracket Anti Jumping Knob — Towel Bar Guide Block Allen key
NOTES BEFORE INSTALLATION repair the tools. (Please refer to page 5) All measurements and installation should do after the wall Is completed. EA Make sure the bottom is horizontal and the wall is vertical, if the bottom is not horizontal or the wall is not vertical, please contact our installation technical support. IA Understand the names and uses of individual accessories of shower doors. (Please refer to page 1~3) recommended. Please watch installation video or call us for installation support.
TOOLS REQUIRED (Please bring your own tools) (we offer) Aluminum punch template Spirit level Tape measure Power drill Screw driver Drill Bits 5/16" & 1/4" Rubber hammer Silicone Gun Hacksaw Modified Ypsilanti) Polymer 5s
INSTALLATION STEPS Measuring Punching Wall bracket Glass guide block Soft close Door seal Bottom anti-splash threshold *Technical support number 626-890-3620 321-946-6293
(M According to the assigned aluminum punching template (please measure with horizontal ruler), draw the punching point position after ensuring the slope value. 66" |61wel 76" | 71 wel or *Same punching data for both walls @ Drill the holes according to the drawn holes, making sure that there is no offset of the holes. The drilling positions of the left and right walls need to be in alignment and on the same horizontal and vertical plane.
the guide rail need to be cut to match your shower opening please do it based on actual measurements. If stretch the product installation width please adjusting the insertion depth of the wall bracket to the guide rail without cutting the guide rail. DDS has maximum installation width stretch of 1" for each size. After the installation of the guide rail, please use the level ruler to measure whether the level.
(5) After installing the rollers, hang the door on the guide rail (6) Installation of sliding glass: The height and level of the glass can be adjusted slightly by adjusting the rollers, through this adjustment can be adapted to the shower with a little wall offset, each wall offset preferably not more than 1/4".
Sliding door @ After the glass installation is completed, please measure the glass with level ruler to confirm the vertical and horizontal of the glass and then install the glass guide block.
(8) Soft-close fixed position: please adjust the buffer to the right position after the door is closed (need to reserve the width of door seal), because the buffer position will determine the closing position, determine the buffer position after the door is closed then tighten the four buffers on a total of 8 screws, set screws will be drilled into the top of the guide rail to fix the buffer, screws not tightened may lead to buffer displacement or damage.
Sliding door (9) The door seal can be installed according to your preference, but you need to ensure that there is minimum a wide door seal in the middle when you shower, The top of door seal needs to be slightly lower than the bottom of anti-jump knobs to avoid scraping 12.
Install the anti-splash threshold according to the guidelines, please cut to the right size according to the width of your shower opening. Clean up the garbage and dry the water and stains with a soft cloth after installation, then applying the glass glue. Note: Please dry for 24 hours after the glass glue is applied before use.
SAFETY TIPS: Installation, remove them only after installation is complete. Wear protective equipment when drilling, cutting rails and water barrier thresholds. EA Careful installation of the glass is required during Installation, please do not step on the glass to avoid bumping. EA Wait 24 hours after installation before using the shower.
Please contact our customer service to confirm the return steps before returning or get order replacement.