ot S Strop 5 ot Dig & 24" esp hole in the desired location and insert a 4x4 waylaid post. Leave 48° exposed above ground. Fill the hole with per-ix concrete (not included) and Jg val the wood post. Once the concrete has cured, slide the decorative post (part 1) over the wood 4i4 ensuring that the base sits flush with the ground. Optional Ground Screw: Twist the screw into the ground and attach a 44 post (approx. 48” length, not included} with the 5x lag bolts provided.