B020 Series ! Parts such as accessory boxes、handle etc are stored with the aluminum frame 22.03.01.
General information Please inspect the product immediately upon receipt for transit damage, missing packs/parts or manufacturing fault. Damage reported later cannot be accepted. Please handle the product with care avoiding knocks and shock loading to all sides and edges of the glass. Note: Safety glass can not be re-worked. -Please read these instructions carefully before start of installation. -Special care should be taken when drilling walls to avoid hidden pipes or electrical cables.
ASSEMBLY INSTRUCTIONS-DRAWING 18 01 17 19 02 20 03 15 04 05 10 06 07 08 12 11 16 14 09 13 PART LIST NO. Description 01 Slideway 1 11 Hole decorative covers 1 02 Cross round head machine screw(M4 x 12) 4 12 Metric Screw(3.9x12) 2 2 13 Slideway 1 03 Movable glass QTY Doagaram NO. Description QTY Doagaram 04 Metric Screw(3.
Step 1 1.1 1.2 13 06 13(1/2'') >60mm 06 NOTE:Put two wall profile (#6) into the shower room, align them with a level ruler, and then mark the holes of the frame with a pen.
2.1 ∅6 2.2 05(x6) NOTE:Use the drill bit of Ø6 to drill the holes in turn against the marked holes, and then drive the expansion sleeve into each hole (#5).
3.1 Inside Outside 3.2 4(x4) 9(x4) NOTE: Put the bottom guide rail (#13) on the installation position, and the wall profile (#6) fits into the bottom guide rail and presses against the wall.Install 4 wall trough buffer blocks (#9) in the upper and lower holes of the wall trough and tighten them with screws (#4).
4.1 08(x2) 4.2 07(x2) 12(x2) NOTE:Use 2 screws (#8) to drive into the holes in the middle of the wall grooves on both sides to tighten. Then install the wall groove buffer block 2 (#7) and tighten it with screws (#12).
5.1 01(x1) 5.2 Outside Inside NOTE: Install the top rail (#01) into the wall groove.
6.1 6.2 Ø3.2 6.3 Ø3.2 NOTE:Place the top guide rail with a spirit level, adjust it to the level, use an electric drill to align the pre-opening hole to drill it through a layer, and also align the bottom aluminum material to the pre-opened hole and drill it through a layer .
pay attention to installation derection 7.1 02(x2) 16(x2) 7.2 02(x2) 16(x2) Inside Outside NOTE:Use the screw cap set (#16) and the cross round head machine screw (#2) to install and lock the upper and lower 4 holes.
17(x4) 18(x8) 19(x8) 20(x8) 3 8.3 8.2 8.1 19 18 20 17 3 NOTE: Put the rubber sleeve (#19) in the glass hole, and then clamp the pulley frame (#17) on the glass, and then use the screw (#18) through the gasket (#20) to install it on the pulley frame, pay attention to the installation of the pulley Direction (as shown in the picture).
Move the inner glass door into the interior of the room. 9.1 Install the outermost glass door first, and then install the inner glass door. 9.
9.3 9.4 Put in the middle NOTE: Hang the glass door with the pulley installed into the top guide rail, then push the door to one side, slide the guide block on the guide rail to the middle of the guide rail, and respectively snap into the glass door. Put glass glue on both sides of the guide block.
10.1 11(x1) 10.2 10.3 10(x1) Outside 15(x1) NOTE:Attach the handle to the glass door. You can install the handle according to the use situation, which is convenient for hanging towels.
NOTE:In the last step, put glass glue on the inside of the connection between the room body, the wall and the ground, and let it stand for 24 hours before using it 24 hours Allow 24 hours for silicone to dry before use.