manual

1970-02
2. Fitthexingclipstothe
sink using the screws
provided,asshownin
g. 2 and hinge them
back away from the
sinkedge.
3. Atthispointtrythesink
in the cut-out, some
localised enlargement
of the hole may be
necessaryaroundthe
clips.
4. Fit the tap to the
sink.
5. Fit the wastes to the sink following the instructions
packedwiththem.
6. Fitthefoamsealtotheedgeofthesink.Peeloffthepaper
backingstripandstickthesealtotherecessinthesink
asshowning.3.Ensurethataneatbuttjointisachieved
wheretheendsofthesealmeet.
FITTINGTHESINK
1. Positionthesinkinthecut
out.
2. Tensionthexingclipsas
showning.4.
Ensurethatthefoamseal
is carefully compressed
butdonotovertightenthe
clips.
3. Completetheplumbingof
thehotandcoldsupplyto
thetap.
ALTERNATIVEMETHODOFSEALING
1. Applysiliconesealant(notsupplied)totheundersideof
thesinkrim,asshowning.5.
2. Removesurplussealantfromaroundthesinkusingadamp
cloth.
NOTE: During installation care should be taken to ensure
the sinkisprotectedfromscuffsandscratches.Strainingand
overtighteningofallplumbingxturesconnectedtothesink
shouldbeavoided.Installersshouldcarefullycheckthatthe
mouldingandtheedgesof thesinkaredeadlevel sothat
waterwillowoffthedrainer.
PLEASEREADTHOROUGHLYBEFOREATTEMPTINGTO
INSTALLSINK.
PREPARINGTHEWORKTOP
1. Itisrecommendedthattheinsetsinkisttedtotheworktop
beforebeingpermanentlyxedtothecabinet.
2. Placethesinkupsidedownonworktop.Positionthesink
relativetotheworktopasrequired,ensuringthatthecabinet
frameworkwillbeclearofallpartsofthesink.
Withasharpsoftpencildrawroundsinkasaccuratelyas
possible.Seeg.1.
3. Remove the sink and draw another line 10mm inside
theout-lineofthesinktop.Thisisthecuttinglineforthe
aperture.
4. Drillaslargeaholeaspossibleinsidethecuttingline.Using
apadsaw,jigsaworsimilar,cutouttheaperture.Atthis
pointwewouldrecommendthattheworktopapertureis
sealed.Todothispaintoverwithap.v.a.adhesive,paint,
varnishorsmearwithsiliconesealant.
PREPARINGTHESINK
1. Ifatapholeisrequired,buthasnotbeensuppliedinthe
sink,proceedasfollows.
Decidewhetherthebowlistobeontheleftorrighthand
whenthesink istted.Cut theappropriatetapholeinto
thesink.Todothisyouwillneedaholesawortankcutter
settocutouta35mmdiameterholeandapilotdrill.On
thereversesideofthesinkyouwillndalocationpoint
forthepilotdrillinthecentreofthetapcut-out.Drillout
thepilothole.TurnthesinkoverandcarefullydrilLcOt4he
tap-hole.
WARNING: Velstra&Neostoneproductsincludeasilicaller.
Anymachiningoperationwillproduceneparticlesofdust.
Drillingorcuttingmustbecarriedoutinawell-ventilated
area.
INSTALLATIONDETAILSVELSTRA
®
&NEOSTONESINKS

Summary of content (4 pages)