WPC110757 11’ X 7’ INSTALLATION INSTRUCTIONS 136.61” 2.36” 83.62” 1.97” 3.15” 76 sq . ft. 3.
ENGLISH INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS • Remove all parts from the packaging and lay themout on a clean work surface in Zone I/II and III. • Please read the list of components BEFORE assembly, making sure that no parts are damaged or missing. • Read through the complete assembly instructions again. • Assemble all parts according to the instructions in this manual and do not skip any step. • • For shed construction and handling, please use only the tools listed in the assembly instructions.
Description QTY 1-1 Aluminum Bottom Frame (Front & Rear) 1.38” H X 0.79” D X 68.58” L 2 M1107 35.2-30-1742-1 1-2 Aluminum Bottom Frame (Front & Rear) 1.38” H X 0.79” D X 68.58” L 2 M1107 35.2-30-1742-2 2 Aluminum Bottom Frame (Left & Right) 1.38” H X 0.79” D X 83.62” L 2 M1107 35.2-30-2124 1 Left front column M1107 59-59-2222 1 Right front column M1107 59-59-2222 1 Left rear column M1107 59-59-2008 1 Right rear column M1107 59-59-2008 M1107 59.
No Description Structure Window (Right Side) 19 QTY 1 80.51” H X 12.64” D X 4.21” L 20 Color Steel Tile Code M1107 1996-322 5 33.07” H X 87.80” D Double Door 53.15” H X 72.05” D 21 Composite Wall Panel 22 6.69” H X 0.79” D X 73.82” L Composite Wall Panel 23 6.69” H X 0.79” D X 77.32” L Aluminum connectstrip 24 2.72” H X 1.85” D X 23.62 L 1 36 20 3 Aluminum connectstrip 25 0.78” H X 0.78” D X 23.
COMPOSITE SHED THREE-VIEW DRAWING 142.91” 137.17” 83.62” FRONT VIEW EN SIDE VIEW EN 80.63” 83.62” 137.17” 134.17” AXONOMETRIC VIEW TOP VIEW TOOLS REQUIRED FOR INSTALLATION 8mm 8 5 79.06” 77.32” 73.82” 87.48” 73.82” 87.48” 87.
86.61” GROUND REQUIREMENTS EN EN Composite shed should be installed on the hard ground like concrete foundation, the surface of ground should be flat and the size should follow the dimension of drawing. Bottom Beam Dimension Drawing. .
EN After prepare the installation area for your composite shed, please check parts according to the part list firstly, then place those parts on site, and assemble the following parts in advance. B 11.81” 10 10 25 x2 EN Please note that the notching is in the same direction. 11.81” B 16 16 24 x3 16 C 16 16 16 D 16 C 16 16 D EN Connect the aluminum beams with L brackets by applying screws in advance.
A 1-1 2 1-2 1-2 2 20x A 1-1 EN Install aluminum bottom frames according to dimensions and positions as the sketch map shown above,then fix them with plastic expansion bolts. Please make sure the leveling of the bottom frames.
3 22 22 2 1 2 1 3 21 21 B EN Install the shed from the front side, please insert column (left & front) and composite wall panel into the groove of aluminum bottom frames, then fasten column and planks with screws. Two operators are required for this step, one needs to hold the column so as to avoid any broken caused by tilt. (We suggest to install composite shed under the calm weather, and more operators are needed if install under windy weather).
3 22 22 1-1 2 1-2 1-2 2 1-1 EN Install the composite wall panel one by one. 3 5 22 1-1 2 1-2 1-2 2 EN 1-1 Install the column (left & rear) into place. Use a sealant gun to apply a bead of sealant inside the column, following the red line.
3 5 22 1-1 2 1-2 1-2 2 EN 1-1 Install the composite wall panel one by one. 5 3 11 22 23 2 1-2 1-1 1-1 2 1-2 EN Insert the aluminum H-shaped beam (left/right) into the column, then install the composite wall panel into the place one by one.
10 5 3 11 6 23 22 2 1-2 1-1 1-1 2 1-2 EN Install the aluminum column (right & rear) into the place, then insert the aluminum H-shaped beam (rear) into the column. 6 10 11 4 5 23 11 22 3 22 2 1-2 2 1-1 EN Install the aluminum column (right & front) into the place, then insert the aluminum H-shaped beam (left/right) into the column.
10 10 11 11 10 22 X6 22 X6 EN Install front composite wall panel and aluminum H-shaped beam (front) into the place.
9 8 53.15” 7 EN Insert the left and right aluminum door frames into the position, then install the aluminum threshold, and adjust perpendicularity and dimension between the two frames shown as the above sketch map. B EN After adjustment, please ix the composite wall panel, aluminum bottom frame and aluminum H shaped beam with screws, two screws are required in the connection of every composite wall panel and beams.
17 18 17 19 EN EN Install window into the place. (Please note different sides of window, the side with rivets should be toward the inside) Fasten the window with columns and H-shaped beams by using screws.
16 EN 16 16 Connect the aluminum beams with window (left & right side) by using screws.
IMPORTANT 3.15” 2.36” G F 20 E E F E F E F E EN Install the color steel tile, the extension length of roof tile should be 2.36” in the shed’s front side, while the left and right side should be 3.15”. Please note that the length of screws for roof tiles ixing is different from those for the conne ction with aluminum beams .
20 20 20 20 20 IMPORTANT: When installing the roof, you must respect the measurements on page 17. When the panels are installed, screw a first screw on the right and another on the left, respecting the measurements on page 17. Make a line at using a chalk-line or a level to be sure to follow the aluminum beam of the roof and put the screw in it. EN Install roof tiles one by one, please pay attention to the connection method shown as the above sketch map.
J 12 14 13 J J 13 14 12 J EN Install all aluminum verge boards inline with the diagram as above.
3 0 0 mm 3 0 0 mm 2 5 0 mm 2 5 0 mm Please install the door with following steps: - Assemble the hinge on the door with rivets(see diagram above); - Place the door in the position where needs to install it; - Put a subplate with a thickness of 5mm under the door; - Insert the other side of hinge into the place, and mark the position with a pencil; - Remove the door, then fix hinges with rivets.
H H EN Install the latch of door. EN Install the door lock. .
IMPORTANT Composite Wall Lower aluminum frame Floor EN To prevent water iniltration issues, you must add a sealant at the bottom of the shed: 1. Perform a thorough cleaning of the shed: remove any dust and debris from the floor and ensure the f l oor is completely dry. 2. Apply a bead of sealant all around the interior of the shed between the floor and the lower aluminum frame (refer to parts #1 and #2 in the installation guide). 3.