ProVision 3 Installation Manual 8100-35521-00 Rev. A1 ProVision 3 Installation Manual Model 1000-10004-PV Leidos Security Detection & Automation, Inc. – Proprietary Page 1 of 119 This item is subject to the U.S. Export Administration Regulations (15 CFR 730-774) and authorized for export only for certain countries, parties, end-users, and end-uses. It may not be exported, resold, transferred, or otherwise disposed of without approval under the EAR or as otherwise authorized by U.S. law and regulations.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Contents Disclaimer .................................................................................................................................................8 1.0 Introduction .....................................................................................................................................12 1.1 Relevant Procedures ................................................................................................................
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 11.5 11.6 11.7 11.8 11.9 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 11.18 11.19 11.20 Top Window Angle Brackets ......................................................................................................51 Motor Brake Release ...................................................................................................................52 Power Cord ....................................................................................
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 12.2 12.3 12.4 12.5 Power Cable Routing...................................................................................................................85 Scanner Power-Up and Warm-Up ...............................................................................................85 Date/Time Setting........................................................................................................................86 Scanner Calibration ...........
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 List of Figures Figure 1: Hazardous Voltage and High Current Labels ..............................................................................14 Figure 2: Belt-Drive Safety Labels..............................................................................................................16 Figure 3: Electrical Power Switch (Two Options) ......................................................................................
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 42: Bolt-On Side Frames..................................................................................................................46 Figure 43: U-clip Installed on Frame ..........................................................................................................46 Figure 44: Cross-Level Check .....................................................................................................................
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 85: Inner Radome Fastened in Place ................................................................................................78 Figure 86: Inner Radome Slotted Hole and Screw Sticking Out .................................................................78 Figure 87: Ceiling ........................................................................................................................................79 Figure 88: Ramp Support .....
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Disclaimer Leidos Security Detection & Automation, Inc., (“Leidos SD&A”), has made all reasonable efforts to ensure the information in this manual is accurate and complete. Leidos Security Detection & Automation shall not be held liable for any technical or editorial errors or omissions contained herein, or for incidental, special, or consequential damages concerning the furnishing or use of this manual.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Software License Agreement (Embedded Products) You have acquired a device (“DEVICE”) that includes software licensed by Leidos Security Detection & Automation from Microsoft Licensing Inc. or its affiliates (“MS”). Those installed software products of MS origin, as well as associated media, printed materials, and “online” or electronic documentation (“SOFTWARE”) are protected by international intellectual property laws and treaties.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 FCC Compliance Federal Communications Commission Radio Frequency Interference Statement FCC Compliance Federal Communications Commission Radio Frequency Interference Statement This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual Contact Information Mailing Address Telephone FAX North America Leidos Security Detection & Automation, Inc. 490 First Avenue South St. Petersburg, FL 33701 USA 727-556-0270 Leidos Security Detection & Automation, Inc. 1 Radcliff Road Tewksbury, MA 01876 USA 781-939-3800 727-556-0271 manuals-sds@leidos.com/ https://www.leidos.com/securitydetection 781-939-3996 manuals-sds@leidos.com/ https://www.leidos.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 1.0 Introduction This manual details the installation steps for the ProVision® 3 scanner, Model 1000-10002-PV. 1.1 Relevant Procedures The following procedures are referenced in this installation manual and might be required to complete movement or installation of certain components of the ProVision 3 scanner: Document Title Document No.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 The sole job of customer support is to help you serve customers. Be sure to have your specific problem and the troubleshooting methods you have employed documented and the installation site information available, especially the scanner location and serial number. The U.S. Customer Support staff can be reached Monday through Friday, excluding company holidays, from 9:00 AM to 5:00 PM EST / EDT (14:00 to 22:00 UT).
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 2.0 Safety The ProVision 3 scanner is designed for safe operation under a wide range of operating conditions. The scanner uses a rotating swing arm/antenna structure to inspect for contraband items. As with all such equipment, certain potential hazards exist if the scanner is operated improperly. The potential for injury from mechanical trauma or electrical shock can be avoided through proper use of the scanner.
ProVision 3 Installation Manual 2.2 8100-35521-00 Rev. A1 Lockout/Tagout Requirements and Procedure Lockout/tagout is applicable to all personnel, including contractors, involved with repairing, servicing, cleaning, routine maintenance, troubleshooting, inspection, testing, modification, installation, and disassembly of Leidos systems. Refer to the Lockout Tagout Work Instruction (8400-10708-WI) for details on the Lockout Tagout procedures.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 2: Belt-Drive Safety Labels 2.4 Toxic Safety Precautions The consumable materials listed below are toxic to the skin, eyes, and respiratory tract. Good hygiene practice is recommended; wash your hands thoroughly after leaving your work area. Wear nitrile gloves and safety glasses when handling the consumable materials: Isopropyl alcohol Electrostatic discharge (ESD) wipes [490-26003] Material safety data sheets are available.
ProVision 3 Installation Manual 3.0 8100-35521-00 Rev. A1 Tools List 3.1 Tools in Installation Kit Reference the installation kit packing list for the materials included. 3.2 Additional Tools In addition to the tools included in the installation kit, the following tools are required (Tables 2 and 3) or optional (Table 3). Table 1: Required Installation Tools Quantity Description 1 Cutter, wire, diagonal, cushion grip, 5-5/8" long 1 Screwdriver, slotted, 3/8" blade, 10.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Quantity Description 1 1.5mm hex key 1 10mm hex key 1 Hex Bits Set 1 Torque wrench, 3/8" square drive, 30–250 in-lb / 3.4–28.2 Nm 1 Torque wrench, 1/2" drive, 20–150 ft-lb / 27.1–203.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 4.0 Crate Unpacking 4.1 General Guidelines The area should be large enough to unpack and set aside the contents of the two crates until needed.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Entrance/exit ramp supports (2) OCP mounting brackets (3) Operator control panel (OCP) and OCP mount pole Belt barrier kit Cable pass-through hole cover plate/grommet Blank cover plate Seismic bracket kit [optional] Power cord Hardware kit Leidos Security Detection & Automation, Inc. – Proprietary © 2020 Leidos.
ProVision 3 Installation Manual 4.2 8100-35521-00 Rev. A1 Scanner Crate Unpacking The scanner crate lid is secured with approximately ten lag bolts (can differ from system to system). 1. Remove the bolts, lift the lid, and set it aside. 2. Remove all items on the top shelf and set aside. Handle the longest box with care (this box contains both antenna masts). Figure 4: Masts and Other Items on Top Shelf 3. Remove the two halves of the top shelf and set aside.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 6: Column Screws to Be Removed 7. Remove all screws/bolts and brackets securing the upper/lower frame assembly to the crate base. Figure 7: Screws/Bolts and Brackets to Be Removed 4.3 Installation Kit Crate Unpacking 1. Remove end panel and lay panel down as a ramp, as shown in the following figure (left side), by hooking the bolts in the holes at bottom of opening. 2.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 8: Installation Kit 3. Unscrew and remove the wood chock used to prevent the Genie Lifts from moving during transport. 4. Roll the Genie Lifts out of the installation kit crate. 5. Remove the straps securing ladders (with kits including ladders) to the Genie Lifts. 6. Set all items aside. Leidos Security Detection & Automation, Inc. – Proprietary © 2020 Leidos.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 5.0 Genie Lift Assembly NOTE: Genie Lift equipment requires inspection to be performed by a qualified inspection technician on an annual basis at a minimum. Each owner of Genie Lift equipment should have it inspected and tested. If inspection is required, hire a local inspection company to have the Genie Lifts inspected and tested per local country laws and regulations.
ProVision 3 Installation Manual 5.2 8100-35521-00 Rev. A1 Leg and Wheelie Bar Attachment 1. Lay the first of two Genie Lifts horizontally on its wheels. 2. Insert a leg into a square tube leg socket with the casters facing away from the Genie Lift as shown in Figure 9. 3. Slide the leg in until it hits the spring-loaded leg lock pin. 4. Holding onto the leg with one hand, reach under the lift and pull the spring-loaded pin until the leg starts to drop.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual Figure 11: Spring-Loaded Pin and Crank Handle and Carriage Lock Bar 9. From the back of the lift, insert a wheelie bar into the back of the leg tube with the holes in the wheelie bar facing up, as shown in Figure 12. Figure 12: Wheelie Bars (at Right) 10. Push the wheelie bar in until it touches the spring-loaded pin. 11. Pull the spring-loaded pin just enough so the wheelie bar can move forward into the leg without allowing the leg itself to move.
ProVision 3 Installation Manual 5.3 8100-35521-00 Rev. A1 Modified Cradle Fork Attachment 1. Take four fork lock pins from the fanny pack provided in the installation kit. 2. Slide a modified cradle fork onto the two fork support tubes, as shown in the following figure. Figure 13: Fork Support Tubes 3. Insert a fork lock pin into the hole on each fork support tube, then flip the rings over the end of fork support tubes, as shown in the following figure. 4. Repeat for other side. 5.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 6.0 Caster Operation Figure 15: Caster Assembly Following are some important notes on caster operation. The step-by-step procedures are presented in the next chapter. 1. When the caster assemblies are mounted onto the caster end plates, they must be in the “closed” (vertical) position to access the two lower screw holes and “dolly” (intermediate) position to access the two upper screw holes, as shown in the following figures.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 2. After the caster assemblies are attached to the upper/lower frame assembly (described in next chapter), they are moved to the open position by ensuring the two quick-release pins are removed, then inserting the leverage bar into the square tube in the center of the caster swing plate. The caster must be correctly oriented with the wheel bracket nearly vertical, as shown in Figure 17, before applying pressure on the leverage bar.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 19: Caster Pivot Lock Leidos Security Detection & Automation, Inc. – Proprietary © 2020 Leidos.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 7.0 Removal from Scanner Crate 1. Attach each of the two ramps (2800-20769-00) to the crate using two 2½-in. PFH drywall screws [0200-10176-40] in the outer screw holes per ramp, as shown in the following figure, ensuring that the ramps are the proper width apart to accommodate offloading the upper/lower frame assembly. Figure 20: Ramps Attached 2.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual ring and return the caster to the down position, pull the quick-release pin and lower the caster swing plate to the dolly position, and then tighten the two upper screws. 5. Repeat for the other caster. Figure 22: Caster Attachment to Caster End Plate 6. Repeat steps 2 to 4 for the other caster end plate. 7.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 14. Roll the assembly forward to the edge of the crate so that the casters align with the two ramps. At a minimum, two people are required to move the assembly down the ramps. Keep both hands on the assembly at all times. Move slowly; quick movements can make the assembly uncontrollable. 15. Maintaining a secure hold on the assembly to keep it under control, slowly roll the assembly down the ramps. 16.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 8.0 Movement to the Install Location 1. To maintain control when moving the upper/lower frame assembly, Leidos recommends to keep the two “front” (leading) casters locked unless steering around a corner. Both hands should be kept on the assembly at all times. Move slowly as quick movements can make the assembly uncontrollable. 2. Slowly push the assembly to the desired location. When turning corners, unlock the front (leading) casters. 3.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 24: Grip Point for Rotating Casters 6. Pull the caster pivot lock ring and rotate it to the unlocked position. 7. Grasp the caster with the locking pliers at the grip point shown in the previous figure and turn. 8. Once the caster is turned in towards the upper/lower frame assembly, return the pivot lock ring to the locked position. Make sure the caster is locked and cannot swivel. 9. Repeat steps 6 to 8 for the other casters. 10.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 9.0 Upper Assembly Lift Before beginning this procedure, ensure that the casters and caster end plates are removed. 9.1 Preparation of Assembly and Genie Lifts 1. Remove the two “outer” bolts (nearest either end of the scanner) from each shipping leg, as shown in the following figure. Figure 25: Bolts to Remove from Shipping Legs 2.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 26: Lifting Bracket with Quick-Release Pin Being Inserted 3. Repeat for the second lifting bracket at the other end of the assembly. 4. Retrieve the two long rectangular lifting bars from the installation kit and insert them through the square holes in the two lifting brackets. Lift them up and secure them in place, as shown in the following figure, with the quick-release pins provided in the hardware kit.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 column has the base plate on the left and the right column has it on the right, as shown in the following figure. Figure 29: Left and Right Columns 7. One left column should be installed at the left side of each end of the assembly, and one right column should be installed at the right side of each end. 8.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 31: Columns Attached with Bolts and Column Head Clamps 11. Position one Genie Lift (assembled in Chapter 5) at one end of the upper/lower frame assembly with its modified cradle forks pointing at the assembly and its wheelie bars pointing away. 12. Position the other Genie Lift at the other end with its modified cradle forks pointing at the assembly (and the other Genie Lift) and its wheelie bars pointing away.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual Figure 33: Modified Cradle Fork and Lifting Bar Secured with Quick-Release Pin 15. Put a wheel chock behind each wheel of the Genie Lift wheelie bars (four in total). Figure 34: Wheel Chock 16. Tap each wheel chock with your foot to wedge the chocks under the Genie Lift wheels. 17. Rotate the crank handles on the Genie Lifts a bit to take up the slack between the lifting bars and the lifting brackets. 18.
ProVision 3 Installation Manual 9.2 8100-35521-00 Rev. A1 Upper Frame Assembly Lifting 1. Rotate the crank handles on the Genie Lifts simultaneously to begin lifting the upper frame assembly. If the upper frame assembly does not separate from the lower frame, verify that all bolts have been removed securing shipping legs to lower frame, and verify there are no wires or cabling hooked from the upper frame to the lower frame. 2.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual Figure 37: Column Bolt Direction 9. Using a 24mm socket, torque three of the column base bolts to 94.9 Nm (70.0 ft-lb) in the following order: first 1, then 2, then 3 (refer to the following figure). Leave bolt 4 (the bolt diagonally opposite the leveling foot) loose. Figure 38: Bolts 1–3 Torqued on Left (Top) and Right (Bottom) Columns 10. Loosen the shipping leg top bolts but do not remove them. Leidos Security Detection & Automation, Inc.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 11. Retrieve the two cross braces from the installation kit and attach each between the shipping legs on either side of the assembly, as shown in the following figures. Figure 39: Cross Braces Between Shipping Legs 12. Remove the bolt through each of two L brackets that is screwed vertically into the end of the swing arm, as shown in the following figure. Figure 40: Bolt Through L Bracket into Swing Arm 13. Remove the shipping leg top bolts.
ProVision 3 Installation Manual 9.3 8100-35521-00 Rev. A1 Genie Lift Removal 1. Carefully begin lowering the Genie Lifts. If the shipping legs do not separate from the upper frame, verify that all bolts have been removed. 2. Rotate the crank handles on the Genie Lifts simultaneously to lower the shipping legs and brackets. 3. When the shipping legs reach the ground, remove the pins holding the cradle forks and lifting bars. 4. Remove the wheel chocks, then roll the Genie Lifts out of the way. 5.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 10.0 Scanner Leveling and Alignment 10.1 Pre-leveling The ProVision 3 scanner arrives with the leveling feet fully raised and with two lock nuts on the threaded stem, one between the leveling foot and the welded column plate and the other above the welded nut (see following figure; note that the bolt-on side frame is already in place in photo).
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 42: Bolt-On Side Frames Figure 43: U-clip Installed on Frame 5. Repeat for the other frame along the other side. Leidos Security Detection & Automation, Inc. – Proprietary © 2020 Leidos.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 10.3 Isolation Footpads (optional) Install the optional isolation pads per 8100-23121-TM or Leidos document: 8000-22070-IP 10.4 Feet Lowered 1. Lower the leveling feet by turning each threaded stem clockwise until each foot touches the floor. 2. Once the feet are touching the floor, turn each threaded stem clockwise a full turn using an adjustable wrench to raise the scanner off the facility floor. 10.5 Seismic Bracket Kit (optional) 3.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 11.0 Scanner Assembly 11.1 Upper Frame Torque 1. Using a 6mm hex bit socket and 3/8th” drive torque wrench, torque the 16-column head clamp screws to 13.6 Nm (10.0 ft-lb) using a cross pattern to prevent binding the screws (see Figure 45). The spacing on both sides of each clamp should be equal. 2. Using a 24mm wrench, 24mm socket, and half inch drive torque wrench, torque the eight column upper and lower bolts to 67.8 Nm (50.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 46: Bottom Outer Radome Angle Bracket 2. Repeat for the other angle bracket. 11.3 Floor Cover Trim 1. Install one of the two floor cover trim pieces (3810-10085-00) shown in the following figure left, just inside the bottom outer radome angle bracket, as shown in the following figure right.\ 2. Fastened the floor cover trim with four M8 x 16mm PFH screws (0201-20413-16) in the locations circled in green as shown in Figure 47.
ProVision 3 Installation Manual 11.4 8100-35521-00 Rev. A1 Mounting Brackets 1. Determine the location of the operator control panel (OCP). The OCP can be located on the left or right side of the electrical enclosure end of the scanner. 2. Install the first of three mounting brackets (3000-23601-00) onto the column at the location selected in step 1. 3. Use the set of holes directly over the leveling foot (see following figure left and center), not the other set that is around by the end of the scanner.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 6. Install two additional mounting brackets onto the columns at the opposite end of the scanner; these were used for the barrier belt installed later. As with the first mounting bracket, use the set of holes directly over the leveling foot (as shown in the previous figure left and center), not the other set that is around by the end of the scanner. 7. Install each bracket so that the face of each bracket points away from the center of the scanner.
ProVision 3 Installation Manual 11.6 8100-35521-00 Rev. A1 Motor Brake Release 1. Connect the motor brake release jumper located on top of the electrical enclosure as shown in Figure 50. Figure 50: Motor Brake Release Cable and Detail Showing Jumper Connected 11.7 Power Cord 1. The power cord included with the scanner should be appropriate for the location and available power source. There are several power cord length/plug options.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 52: Power Switch in the On Position 11.8 Swing Arm 1. Move swing arm by hand to the calibration position (across the scanner, 90 degrees from the longitudinal center line), as shown in Figure 53. Figure 53: Swing Arm in Calibration Position 2. Turn the power off by pressing the portion of the power switch labeled “O”. 3. Unplug the scanner’s power cord from the electrical outlet and use the lockout/tagout procedure (see Section 2.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 The mast is fastened to the arm with five M12 x 35mm HC bolts (0201-10005-35), five M12 spring lock washers (0221-10002-00) and five M12 flat washers (0221-10076-00). Four around the perimeter and one in the center. 5. Torque the four perimeter bolts to 54.2 Nm (40.0 ft-lb) in a cross pattern and torque the center bolt to 37.9 Nm (28.0 ft-lb). Figure 54: Antenna Mast Being Attached to Swing Arm 6. Repeat steps 2 to 5 for the other antenna mast. 11.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 6. Connect the BNC connectors of the five color-coded cables to the ISU, matching each to its colorcoded or color-labeled connector. From the D-sub connector, shown at the right side of the following figure right, the sequence is red (R), green (G), orange (OR), blue (BL), yellow (Y). 7. Secure the cables to the swing arm using a zip tie at the point shown in the previous figure and two zip tie points located on the inner portion of the swing arm. 8.
ProVision 3 Installation Manual 11.11 8100-35521-00 Rev. A1 Cosmetic Mast Wrap 1. Retrieve the two rolls of cosmetic mast wrap (3000-32879-00). 2. Unroll the first wrap and remove the protective film from both sides, as shown in the following figure. Figure 58: Cosmetic Mast Wrap Protective Film Being Removed 3. Wipe down the now filmless wrap with electrostatic discharge (ESD) wipes (490-26003) included in the hardware kit. 4.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 5. Starting from the top of the mast and working down, insert the plastic push-in rivets (410-21034) as shown in the following figure. Figure 60: Push-In Rivets Inserted 6. Repeat steps 2 to 5 for the other mast. 11.12 End Cap Top Bracket 1. Install the first of four end cap brackets (3000-23128-00) use one nut plate (3000-23129-00) and two M6x16mm SFH screws (0201-10293-16).
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 11.13 Entrance/Exit End Cap 1. Remove the column bolt (bolt #4) that was left loose in each column when they were installed. 2. Install one left entrance/exit cover (3000-22286-01) and one right one (3000-22286-00) at one end of the scanner as shown in the following figures. Each cover is fastened with two M6 x 16mm FBHS screws (0201-22775-16) in the top and three M8 x 10mm FBHS screws (0201-10292-10) in the bottom. Leave loose.
ProVision 3 Installation Manual 11.16 8100-35521-00 Rev. A1 Outer Windows 1. There are two outer windows: one with a figure demonstrating the pose to hold for 3 seconds (3810-10062-01) and one plain (3100-10062-00). There is also the option of having two plain outer windows. If the system has two plain outer windows skip to step 4. Figure 64: Outer Windows 2. Install the outer window with the stance on the right side of the scanner when viewed from the electrical enclosure end. 3.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 11.17 Outer Window Bracket Supports 1. Install the first of four outer window bracket supports (1000-26549-00) and (1000-26549-01), ensuring that the middle cover bracket is pointing toward the centers of the window as shown in the following figure right. The support is fastened as shown in the following figures left/center with an M6 x 12mm FHC screw (0201-10069-12) in the top and an M8 x 20mm FHC screw (0201-20452-20) in the bottom.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 2. Repeat for the other side of the first outer window. 3. Repeat Steps 1 and 2 for the second outer window. 11.19 Outer Window Screw Tightening Order 1. Tighten the top screw of each of the four outer radome bracket supports. 2. Tighten the bottom screw of each. 3. Tighten the screws along the outside top and bottom of the two outer radomes. 4. From inside the scanner, tighten the outer radome bracket retainer screws, upper and lower end cap screws.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 10. Click Close Cal and click OK at Verify the cal target is in place. Wait for completion (green check by Closed cal). 11. Remove the calibration beam from the scanner. 12. Click Open Cal. Then click on OK at Verify the scanner is empty. Wait for completion (green check by Open cal). 13. Click Clutter cal . 14. Once the clutter cal completes a second window appears and prompts you to review of the test results. 15. Review the results for any failure.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 5. Turn on the scanner and wait at least five minutes. 6. Connect the Ethernet cable that is attached to the upper end of the outer radome bracket support to a field service laptop and turn the field service laptop on. 7. Wait at least five more minutes. 8. Log in to the laptop as sv_admin. 9. Double-click the Field Service Tool icon on the desktop to launch the Field Service Tool program. 10. Click Connect at upper right. 11.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 24. In the left hand column, click Software tests and verify that all tests pass. Correct any failures as needed. 25. In the left hand column, under Hardware tests, click Mast antenna ISU0 test. Verify all pass. Correct any failures as needed. 26. Click the next test under Hardware tests, Mast antenna ISU1 test, as shown in the following figure. Verify all pass. Correct any failures as needed. 27. Restore the motor brake release jumper. 28.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 2. If the OCP is being located on the left column at the electrical enclosure end, and the power input box is being located in the upper position at the motor/pulley end of the scanner, you must separate the cables. 3. Route the power input box/cable to its selected location and route the OCP, Ethernet and any other cables to the OCP’s selected location. Figure 69: Cabling Route with Power Input Box, OCP, and Other Cables Together 4.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 70: Power Input Box in the Lower (Electrical Enclosure End) Position 11.25 Router If an optional router is required, it should be installed in accordance with 8100-23121-TM option section or 8000-23712-IP. 11.26 Remote OCP If an optional remote OCP is required, it should be installed in accordance with 8100-23121-TM option section or 8000-27088-IP. 11.27 Roof 1.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 71: Roof Middle Holes 3. Install the roof so that the four middle hole (shown circled in green in the following figure) align with the brackets that are already installed on the upper frame. 4. The roof is secured using four M6 x 10mm FBHS screws (0201-22775-10) and four M6 fender washers (0220-23073-00). Leave screws loose until final cover fitting/alignment. Figure 72: Roof Middle Holes (Viewed from Motor/Pulley End) 11.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 73: Top Side Cover and Clip-On Panel Nuts 3. Slide the notched end of the top side cover into the bracket at the top of the entrance/exit cover, as shown in the following figure left. 4. Repeat steps 1 to 4 for the other top side cover. 5. Line up the holes along the top edge of the top side cover (shown circled in green in the previous figure) with the clip-on panel nuts along either side of the roof.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 74: Top Side Cover Sliding into Entrance/Exit Cover 11.29 Notch Delete Install the notch delete kit per Error! Reference source not found. or 8000-25161-00. Leidos Security Detection & Automation, Inc. – Proprietary © 2020 Leidos.
ProVision 3 Installation Manual 11.30 8100-35521-00 Rev. A1 Blank Plate and Cable Pass-Through Hole 1. Attach the blank plate (3000-23667-00) to the lower hole of the middle OCP cover (3000-27080-00) if located on right side of electrical enclosure end or upper hole if located on the left side of the electrical enclosure, as shown in the following figure left, using four M3 flat washers (410-14123) and four M3 lock nuts (0216-10012-00). 2. Attach the cover plate with 1½-in. [38.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 11.31 Middle OCP Cover 1. Grasp the middle OCP cover from the previous section (3000-27080-00) in both hands. 2. Slide the edge nearest the four large mounting holes into the pocket of the entrance/exit cover, as shown in the following figure left, and check to see if the four holes line up with those on the OCP mounting bracket.
ProVision 3 Installation Manual 11.32 8100-35521-00 Rev. A1 Plain Middle Cover 1. Locate the plain middle cover (3000-27081-00). It can fit on either the right or left side of the electrical enclosure end. 2. Slide the edge with the notch at top and bottom (see the following figure) into the pocket of the entrance/exit cover and line up the screw hole shown circled in red in the following figure with the hole on the middle cover brace bracket. 3.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 6. Fasten the middle cover for barrier belt using one M6 x 16mm FBHS screw (0201-22775-16). 4. Figure 78: Middle Covers for Barrier Belt 7. Repeat steps 1 to 6 for the other middle cover for barrier belt. 11.34 Upper/Lower Cover with Switch/Power Input 1. Orient the upper/lower cover with switch/power input so that the cutout is located where the power input box is located (lower electrical enclosure end or upper motor/pulley end). 2.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 5. Attach the cover plate with 3" rectangular hole (3000-23668-00) to the upper/lower cover using four M4 x 16mm BHS screws (410-22394). Figure 79: Upper/Lower Cover with Switch/Power Input in Lower Position 11.35 Plain Upper/Lower Covers 1. Locate the first of three plain upper/lower covers (3000-27082-00). The three plain upper/lower covers are interchangeable. 2.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 80: Top Entrance/Exit Cover 3. Repeat steps 1 and 2 for the other top entrance/exit cover. 11.38 Belt Barrier Assembly Install the belt barrier assembly per Appendix F or 8000-21314-IP. 11.39 Operator Control Panel Install the OCP per Appendix F or 8000-21314-IP System Mounted Resolution Station. 11.40 Optional Resolution Station Install optional system mounted Resolution station per 8100-23121-TM option section or 8600-26545-IP 11.
ProVision 3 Installation Manual 11.42 8100-35521-00 Rev. A1 Inner Radome Base Flange Support Brackets 1. Install the first of two inner radome base flange support brackets (3810-10103-00) as shown in the following figure. The inner radome base flange support bracket does not require screws or other fasteners. It has two holes to accommodate the two guide pins that stick up from the bolt-on side frames. Figure 82: Inner Radome Base Flange Support Bracket and Guide Pin 2. Repeat for the other bracket.
ProVision 3 Installation Manual 11.44 8100-35521-00 Rev. A1 Inner Radome Edge Support Brackets 1. Locate two of the four inner radome edge support brackets (3000-22310-00) and install the first vertically along the side of one of the inner radomes. 2. Slide the bracket over the edge of the inner radome, as shown in the following two figures, such that the edge of the inner radome fits inside the bracket and the holes line up. The bracket uses tabs to lock onto the radome.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 Figure 85: Inner Radome Fastened in Place 4. Tighten the center screws first, then tighten the outer screws working from the center out. 5. Secure inner radome to end cap using six #8 x .625 PTH screws [0200-20643-10] and six M4 nylon retaining washers [0221-29376-00] 3 on each side of the radome. 6. Repeat Steps 2–5 for the other inner radome. 7.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 10. Flex the inner radome by pressing in at the top and bottom of the inner radome and fit the slotted holes over the two screw heads left sticking out in the previous step. 11. Slide the inner radome while pushing in until the screws are at the end of the slots. 12. Fasten the inner radome in place with eight additional M6 x 12mm FBHS screws (0201-10291-16), 13.
ProVision 3 Installation Manual 11.47 8100-35521-00 Rev. A1 Entrance/Exit Ramp Supports and Ramp 1. Install the first of two ramp supports [3000-22249-00] at either end of the scanner, as shown in the following figure. 2. The ramp support is secured with four M10 x 25 FHC screws [0201-20444-25] as shown circled in green in the following figure. Figure 88: Ramp Support 3. Repeat steps 1 and 2 for the other ramp support at the opposite end of the scanner. 4.
ProVision 3 Installation Manual 8100-35521-00 Rev. A1 6. The ramp assembly is secured with two M8 x 25mm SHC screws (0201-10018-25) as shown circled in green in the following figure. Tighten the screws but do not over-tighten. Figure 90: Ramp Assembly 7. Repeat steps 4 and 5 for the other ramp assembly at the opposite end of the scanner. Leidos Security Detection & Automation, Inc. – Proprietary © 2020 Leidos.
8100-35521-00 Rev. A1 ProVision 3 Installation Manual 11.48 Center Floor Board CAUTION Not installing the center floor panel correctly can cause a subject being screened to stand in the portal facing the wrong direction. Doing so can have a drastic impact on scanning results. 1. Install the floor center panel (1000-26606-00) with the feet facing towards the right when viewed from the electrical enclosure end. 2.
ProVision 3 Installation Manual 11.49 8100-35521-00 Rev. A1 Floor Side Panels and Center Panel 1. Install one of the two floor side panels (3810-10080-00) on either side of the floor by fitting it over the two guide pins as shown circled in red in the following figure. 2. Fasten the panel in place with four M8 x 25mm SHC screws (0201-10018-25) in the holes shown circled in green in the following figure. Figure 92: Floor Side Panel 3. Repeat steps 1 and 2 for the other floor side panel. 11.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual 12.0 Scanner Power-Up 12.1 Pre-Power-Up Checks Remove the power cord from the power input receptacle, then turn the power switch to the on position by pressing the portion of the power switch labeled “I”, as shown in the following figure. Using a digital multimeter in ohm mode, check the resistance from each point listed in the following table and indicated in the following figure.
ProVision 3 Installation Manual 12.2 8100-35521-00 Rev. A0 Power Cable Routing 1. After performing the pre–power-up checks, plug the power cord into the power input receptacle on the scanner. 2. If the power input receptacle is located at the lower position, route the cord downward along the edge of the entrance/exit cover. 3. Lift the cable clips referenced in Section 11.34 and slide the cord under each clip and into the rubberized portion of the clip. 4.
ProVision 3 Installation Manual 12.4 8100-35521-00 Rev. A0 Date/Time Setting 1. Open a remote desktop connection and perform the following or connect a keyboard and mouse to the ASCU a. Double-click the SCU icon located on the Desktop of the Field Service Laptop. b. Follow on screen prompts to connect to the ASCU desktop c. At the Remote Desktop Connection window, click Yes. 2. Click on the time or date in the lower right corner of the Windows task bar. 3. Click change Date and Time settings. 4.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 95: Field Service Tool Connect Page 5. Click the Connect button at upper right to activate the testing and diagnostics features. Figure 96: Field Service Tool Testing, Diagnostics 6. Click Start SVDiagnostics on the right side of the Field Service Tool window. 7. Click on Calibration to open the Calibration window. Leidos Security Detection & Automation, Inc. – Proprietary Page 87 of 119 © 2020 Leidos.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 97: SVDiagnostics Figure 98: Calibration Window 8. Click on Pre-cal. a. The system performs the motion cal (if this is after power-up) and VCO cal automatically. b. If any faults occur click on LIP reset then click Pre-cal again. 9. Once complete, a green check appears beside both Pre-cal and VCO cal. Leidos Security Detection & Automation, Inc. – Proprietary Page 88 of 119 © 2020 Leidos.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 99: Pre-cal and VCO Cal 10. Position the calibration beam in the center of the scanner. 11. Click on Close Cal. Then click on OK at Verify the cal target is in place. Wait for completion (green check by Closed cal). 12. Remove the calibration beam from the scanner. 13. Click on Open Cal. Then click on OK at Verify the scanner is empty. Wait for completion (green check by Open cal). 14. Click Clutter cal . 15.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 100: Pre-cal and VCO Cal 16. After review the test results click save baseline, this is only allowable after the test results have be reviewed and are passing. 17. Click the Close Window icon (white X with a red background) at upper right to close SVDiagnostics. Auto Test Verification with Field Service Laptop 1. Press Ctrl+Alt+Shift+X to close the lane application and return to the Field Service Tool window. 2.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 13.0 Acronyms and Abbreviations ASCU Advanced System Control Unit BHS Button Head Socket cm Centimeter(s) ESD Electrostatic Discharge EULA End User License Agreement FBHS Flange Button Head Socket FDRS Field Data Reporting System FHC Flange Hex Cap HC Hex Cap Hz Hertz IQT Image Quality Test ISU Image Sampling Unit K Thousand M Million mm Millimeter(s) MS Microsoft Licensing, Inc.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual 14.0 Appendix A: ProVision 3 Control Kit Install Procedure 15.0 Purpose This instruction explains how to install the Provision 3 Vibration Control Kit (1600-21348-00). 16.
ProVision 3 Installation Manual 20.0 8100-35521-00 Rev. A0 Responsibilities This procedure is to be performed by a Leidos field service representative. 21.0 Installation Overview This appendix explains how to install the Provision 3 Vibration Control Kit on a Provision AIT-2. This instruction assumes that the scanner is powered off and the Lock Out-Tag Out procedures have been followed. 21.
ProVision 3 Installation Manual 21.3 8100-35521-00 Rev. A0 Method 2 1. Clean the area where each foam block is to be attached with alcohol. 2. On each of the end caps measure and mark 3.25 inches up from the bottom of the scanner and 3.75 inches from the tangent of the last bend. 3. Clean an area approximately 4” up and 2” across from the corner of the mark (as shown in the following figure). 4. Repeat this process for the four endcaps. Figure 102: End Cap Measurements 5.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 103: Foam Block 10. Pull the backing off of the double sided foam tape on the back of the foam block. 11. Place the foam block with the double sided tape so that the foam block edges aligns with the mark put previously on the endcap face (see the following figures). 12. Place the barcode label for P/N 3000-22208-00 above the block on the endcay as shown in Figure 105.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Add foam block P/N label Figure 105: Barcode Label Above Block 13. Check if the foam blocks are properly installed when the mast comes to its end of travel or is at start of travel, the foam blocks should be softly touching the front corner edge of the mast. See top down view in Figure 106. Figure 106: Top Down View 14. If the foam blocks are touching correctly, replace the components removed to access the inner endcaps. 15.
ProVision 3 Installation Manual 22.0 Appendix B: End Cap Notch Delete Plate Installation Procedure 23.0 Purpose 8100-35521-00 Rev. A0 This appendix explains the process to install the end cap notch delete panels (3000-25159-00 or 300024159-001) on to the Provision 3 system. 24.0 Scope The ProVision 3 end cap panels have a notch to allow the OCP to be mounted on any leg. When the OCP is not mounted on that leg, the end cap delete panel should be employed. 25.
ProVision 3 Installation Manual 29.0 8100-35521-00 Rev. A0 Preparing System To prepare the system: 1. Remove all fiberglass panels necessary to access the notches on the end caps with no OCP mount. Figure 107: Fiberglass Panel Removal 2. Start at the end cap directly across the exit from the OCP. 3. Clean an area on the inside of the end cap with alcohol at the notch as shown in Figure 108. Leidos Security Detection & Automation, Inc. – Proprietary Page 98 of 119 © 2020 Leidos.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 108: Clean Area with Wipe 4. Determine which way the end cap delete plate [3000-25159-00] will be applied to the end cap. 5. If the back plate (3000-25159-01) has the double sided tape applied, skip to step 7. 6. Clean the backing plate [3000-25159-01] and the end cap notch delete plate (3000-25159-00) with alcohol. Leidos Security Detection & Automation, Inc. – Proprietary Page 99 of 119 © 2020 Leidos.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 109: Clean Surface 7. Apply a strip of tape along the full length of the backing plate. Figure 110: Apply Tape Strip 8. Peel the paper off of the tape. Leidos Security Detection & Automation, Inc. – Proprietary Page 100 of 119 © 2020 Leidos.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 111: Peel Paper Off 9. Line up the front edge of end cap notch delete plate with one edge of the backing plate and center. You can lay both edges on a flat surface for easier alignment. Figure 112: Line Up Plate 10. Press the end cap notch delete plate down on the backing plate. Leidos Security Detection & Automation, Inc. – Proprietary Page 101 of 119 © 2020 Leidos.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual Figure 113: Plate Alignment 11. Ensure the front edge of the end cap delete plate lines up with the edge of the end cap. Attach to the end cap and press together to adhere the tape. End cap notch delete plate line up End cap notch delete plate in place Figure 114: End Cap Alignment 12. Repeat the above steps for the other two endcaps. 13. Reassemble scanner. Leidos Security Detection & Automation, Inc. – Proprietary Page 102 of 119 © 2020 Leidos.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual 30.0 Appendix C: Label Kit 31.0 Purpose The purpose of this appendix is to provide instructions to field personnel for placing labels on the power entry panel after customer has defined whether power entry is to be from the bottom or top of the system. Also explained is the labeling procedure when the customer decides to change the power entry scheme of an installed system. 32.
ProVision 3 Installation Manual 35.0 8100-35521-00 Rev. A0 Procedure 1. Determine whether the power entry panel is to be installed on the top or bottom of the system. 2. Install the power entry panel. System leveling should be completed. 3. Ensure all of the labels are applied to the panel straight and neat. 4. Use a small level, if necessary, to place the labels straight. 5. Place all labels in the order shown in the following figures.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Figure 116: Labeling for Top Power Entry 9. Ensure the labels are pressed onto the panel with no bubbles or edges sticking up. 10. Add labels 6000-21320-00 and 510-21471 to the one entrance/exit panel that covers the motor end of the upper frame. See Figure 117. Figure 117: Label position for Entrance/Exit Panel on Motor End Leidos Security Detection & Automation, Inc. – Proprietary Page 105 of 119 © 2020 Leidos.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual 36.0 Appendix C: OCP and Belt Barrier 37.0 Purpose This procedure is to be followed when installing an OCP mounting kit and/or belt barrier on a ProVision 3 or SafeView system. 38.0 Scope Both manufacturing and field service can use this document to install the options as required. 39.0 Applicable Documents Refer to assembly manual supplied with monitor support post. 40.0 OCP PPH FSHC ROW TSA - 41.
ProVision 3 Installation Manual 42.0 8100-35521-00 Rev. A0 Installation of Barrier Belt Option Belt End Receiving End Figure 118: Barrier Belt The barrier belt has two parts; belt canister and belt receiver. These are installed on either side of the entrance. 1. Attach the receiver end bracket supplied with the barrier belt (0125-20359-00) to the wall mount angle bracket (3000-20412-00 or 3000-23604-00) using two M3-0.5x4mm PPH screws (0201-2038004). Refer to Figure 119.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual Figure 120: Belt End 5. Secure Barrier Belt (0125-20359-00) to studs on barrier belt bracket with M4 nuts (0216-10084-00). 42.1 Installation of Monitor Pole Mount Option Monitor Mounting Bracket Figure 121: Monitor Attached With Support Post 1. The monitor mount assembly is supplied with the monitor pole (0120-20358-00). 2. Separate the monitor mounting bracket from the monitor mount by moving the release lever and lifting as shown in Figure 122.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 Monitor Mounting Bracket Monitor Mount Figure 122: Monitor Mount Disassembly 3. Insert two provided thumb screws and snap into place as shown in Figure 123. These are for locking monitor height. 4. Figure 123: Install Thumb Screws 5. Attach Monitor Mount to pole by sliding into one of four channels in the Monitor Pole. Ensure manufacturer’s logo is readable and not upside-down. Refer to Figure 124. Leidos Security Detection & Automation, Inc.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual Cap Monitor Pole Monitor Mount Monitor Mounting Bracket Monitor Pole Bracket Adhesive-backed Gasket Figure 124. Monitor Support Post Assembly 6. 7. The install cap is included with pole to open end of monitor pole. 8. With mid-panel installed with grommet cover plate (3000-23666-00) and 1-1/4” ID rubber grommet (0235-20349-00) installed in upper hole, pull monitor power, video, and USB cables through. 9.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual 15. If installing OCP (1000-24266-00 ROW) or (1000-24641-00 TSA) 16. Attach OCP (1000-24266-00 ROW) or (1000-24641-00 TSA) to monitor mounting bracket removed in step 1 using four M4-.7X8MM PPH screws (0201-10001-08). Install with the bracket release lever toward the monitor top. 17. If installing OCP (1000-30159-00 ROW) or (1000-27624-00 TSA) 18. Lay the monitor face down on a protected surface.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 23. Figure 126: Screws and Spacers Installed 3. Feed monitor power, video, and USB cables through mid-panel. Secure the panel. 4. Slip four .88”spacers (3000-22752-14) onto four M8x30mm FSHC screws, (0201-22862-30) and thread loosely into OCP mounting bracket (3000-23601-00X) where monitor is to be located. See Figure 126. 5. Extend monitor video, USB, and power cables from system through riser from behind for later connections.
ProVision 3 Installation Manual 8100-35521-00 Rev. A0 8. Place monitor face-down on flat protected surface. 25. If installing a OTEK Monitor (older) 26. Place the OCP monitor mount assembly (1000-27378-00) over the four holes on the back of the monitor and loosely install two M4 x 8mm PPH screws (0201-10001-08) in top two mounting holes. Carefully tighten the four screws without over tightening them. 27. If installing a GVision Monitor 28. Lay the monitor face down on a protected surface.
ProVision 3 Installation Manual 43.0 8100-35521-00 Rev. A0 Appendix D: Installation Checklist Section 4.0 4.2 4.3 5.0 5.0 7.0 7.0 7.0 7.0 7.0 8.0 8.0 8.0 8.0 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.2 9.3 10.1 10.2 10.2 10.3 10.4 10.5 10.6 2.2 11.
ProVision 3 Installation Manual Section 11.3 11.4 11.4 11.5 11.9 11.10 11.11 11.12 11.13 11.14 11.15 11.16 11.17 11.17 11.18 11.19 11.20 11.21 11.22 11.23 11.24 11.25 11.26 11.27 11.28 Error! R eference source not found. 11.31 11.32 11.33 11.34 11.35 11.36 11.37 11.38 11.39 11.40 11.41 11.42 11.43 11.44 11.45 11.45 11.46 11.47 11.48 Completed 8100-35521-00 Rev.
ProVision 3 Installation Manual Section 11.50 12.1 12.2 12.3 12.4 Error! R eference source not found. 12.5 Completed 8100-35521-00 Rev. A0 Task Adjust top side and entrance/exit covers and tighten screws Conduct pre-power-up checks Route power cable Power up and warm up scanner Set date/time Calibrate OCP if finger touches are mistracked or misinterpreted Lock out on-screen display (OSD) Calibrate scanner Verify operation and test system Leidos Security Detection & Automation, Inc.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual 44.0 Appendix E: Genie Lift Pre-Use Inspection Form Genie Lift GL-8 Form 8200-20034-09 Leidos Security Detection & Automation, Inc. – Proprietary Page 117 of 119 © 2020 Leidos.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual Manual Feedback Form Document Number Document Revision Software Revision (if applicable) Document Title Comments (Include proposed rewrite or recommended improvements – Attach additional pages as needed) Submitted by Title Company / Organization Name and Address Date Submitted Telephone E-mail After completing this form, mail, fax, or e-mail it as follows: Leidos Security Detection & Automation, Inc.
8100-35521-00 Rev. A0 ProVision 3 Installation Manual Revision History Date Rev. 10/19/2020 05/25/21 A0 A1 Originator L. Kovner L. Kovner Workflow No. PMF006041 AXE006794 Change Description Initial Release. Update screenshots Leidos Security Detection & Automation, Inc. – Proprietary Page 119 of 119 © 2020 Leidos.