Section 2 ~ installation a Ra vi and Modal 9000 Assembly Top View Figure 2-1.
Lars BO-800-281 issue 1, September 1998 Model $000 Assembly Top View Jamie Fi | HBA In, Ru : rim 240 rms ESE si goes Hon hora BA diy Fort View Figure 2-2, Model 9000 Assembly Dimensions and Elevations 2d
Section 2 ~ Installation A vase ting Cavendish Sighting i wi San py sons el G1 moe {1 Suites Benson Lee Commandant Un oo. {Sea rn font : * Msc akin ton Bharat wo dks oi Finn Figure 2-3.
Lars 80-800-281 issue 1, September 1999 2:8 38-15 Ube (ay © EE Hak Bot Dishwasher Mast Clare RANKIN. ‘Tragedian Rod (ity. 4) YEA Hex Lock washer £3 : EF ays 142 fre 100 Flat Washer Azimuth Clamp Elevation Rog Assembly QRH Hex Hd Bolt Assembly £811 Hox Nut {uty 8) 8-16 Hex Nut 016 Sherlock 38 in. Bloodshed WE-16 Mes Nut-BS fat 2) B24 in. iy Alas Washer Katy 2) 39 ins AD Fiat Washer B18 In. Dishwasher ify 4 2 Pl ages Figure 2-4.
Section 2 ~ Instillation BE 2.302 {continued} Connect Type N coal jumper cable from the AF module to wave guide and run the wave guide, in turn, to the antenna: Refer to Figure 2-5. Allow approximately 3 inches of hole clearance through walls for the cable connector. Connect the wave guide to ground, Ensure that the outdoor connection from RF module to antenna is properly weatherproofed with 3M Scotch™ 1300 or equivalent. With reference to subsection 2.5, power up the radio system.
2411 ~ Section 2 installation Power Plant battery connects to the Mods! 8000 equipment at terminal block TB1 on the controller's errs panel, The assignments for this terminal block include FRM GND. BAT GND, snd Vdr. Refer to Figure 2-8, Follow the steps below to make power and ground connections to the shalt. Use a DU power source capable of supplying.
Section 2 ~ installation 2.43 EHDS1T Lines 2.431 Customer E1/DS1 lines connect to the Model BOO through the Bopping RJ48M (Amp Champ Male] connector P4 on the Control Modules rear panel.
Lars 80-800-281 tissue 1 2442 September 1989 Lightning Protection All grounds for lightning are Oft outside the Central Office structure while equipment grounds are entirely inside the structure. The only place where everything ties together is at the master ground bar, typically located in a cable vault or basement or near the battery room.
Section 2 ~ Installation Lighting Rods Ring Ground on rooftop . tse Conduct one = Grand Figure 2-7.
Lars 80-600-281 Issue 1, September 1998 im: oe REE SOR OE ey Going the Wii oni freedom fete pio seat RES AF tale Die Should not | Cetacean Sine who sinned Edit grind wna of stg inclinations, § § Weg Haney wanton xii : {oat doo o rare te ind pile = pte on fai Optional ! Baring = dri i EE DUG | Sven REG inebriation aol SATE 5 ounce 4 he ie Gruel so | NOTE: Local practices may dictate a different method of grounding, Figure 2-8. Outdoor Grounding at Installation 9.
2.481 Section 2 ~ Installation Virtual Data Circuit (Modem) Attach a prefabricated cable to the DE-SP connector PS REMOTE on the control module's rear panel. The pin assignments for these connectors are listed in Table 2.8. Table 2-B Modem REMOTE DB-9 Connector Pin Assignments DER {data set ready) 1 DCD (data carrier detect) 8 i Rx) {caregiver data) 1 ? RTS ready to send) TxD {transmit data) 8 CTE {clear to sand} 8 DTR {date terminal ready} Stringing indicator} GPa JN SG (signal ground] 2.50 2.6 2.