Installation Guide

LEDGESTONE PLANTER INSTRUCTIONS
SCENARIO 1- SINGLE LAYER ON SOLID GROUND
SCENARIO 2- DOUBLE LAYER ON SOLID GROUND
STEP 1:
Choose (A) if you are installing your planter on solid ground (i.e. concrete) or soft ground (i.e. dirt)
and (B) if you are installing one or two layers. Continue to the appropriate scenario below.
A) Using SHORT fiberglass pins, connect panels in desired planter shape. Push pins down (pointed end first)
through each of the hinge holes until pin hits the ground. See Figure 1 and Figure 2. It might be necessary
to push the pin down using the flat end of another pin.
A) Using LONG fiberglass pin, connect panels in
desired planter shape. Push pins down (pointed end
first) through each of the hinge holes. See Figure 3.
B) Remove 2 pins and set 2 second layer panels at
those two joints, then re-insert the pins through each
of those hinge holes until pin hits the ground. See
Figure 4 and 5. It might be necessary to push the pin
down using the flat end of another pin. Continue two
panels at a time until the second layer is complete.
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5

Summary of content (2 pages)