User's Guide

J9
Meter
Input Cables
MT2W-MK
Long-Range
Synthesized Radio
Meter Transmitter
Installation Manual
Web Site: www.kpsystems.com
ISRAEL Office
Email: info@kpsystems.com
Tefen Industrial Park, Tefen 24959
Tel: 972-4-987-3066 Fax: 972-4-987-3692
USA Office:
KP ELECTRONICS INC.
Email: info@kpsystems.com
109 Tudor Drive, North Wales, PA 19454
Tel: (215) 542-7460 Fax: (215) 542-7461
Book
096
Approved: Amir S.
Rev:
New
MT2W-MK™ General Description
MT2W-MK™ is a long-range, synthesized
radio-metering transmitter in the VHF 450-
470 MHz frequency range..
When the MT2W-MK detects pulse
conditions at one or more of its inputs the
pulse is counted and saved.
When the number of the pulse is equal to
the Trans Scale defined by the GUP10™, it
is then transmitted to the central station
according to the WAT-NET
TM
protocol
selected for the system in operation.
MT2W-MK™ has one connector (see
Figure 1).
1. J9: The 10-pin programming jack is a
serial port to connect a PC or a FTU (see
Figure 1).
Unit parameters and meters values
are easily programmed using
Gup10™ utility-programming
software. (See the MT2W-MK
Programming Guide) or by the FTU.
1.2. Meter Input: The meter input is a
two wires cable. These wires connect to
the meter output.
Figure 1: MT2W-MK™ View
Preparing for Operation
Before installing the MT2W-MK
on site, perform the following
preparations:
1. Setting communication
parameters
2. Self test
Setting Communication
Parameters
Connect GUP10 program to the
MT2W-MK™ (see the MT2W-
MKprogramming guide)
Self-Test
In order to perform a self-test please
see the Field Programmer User
Guide.
Installing the MT2W-MK
There are two mounting methods:
1. Wall mounting
2. On-Pipe mounting
Wall Mounting Installation
1. Fasten the mounting bracket on
the wall with four screws (See
figure 2)
2. Slide the MT2W-MK unit on the
mounting bracket until the 4 clips
are locking the unit
3. Define the parameters with the
field programmer (FTU100) see
the FTU User Guide
4. Insert the terminator to J9 (See
figure 1)
5. Put the cover
On-Pipe Mounting Installation
1. Fasten the mounting bracket
on the pipe with two screws
and the “Omega” bracket
(See figure 3)
2. Slide the MT2W-MK unit
on the mounting bracket
until the 4 clips are locking
the unit
3. Define the parameters with
the field programmer GUP
application.
4. Insert the terminator to J9
(See figure 1)
5. Put the cover
Figure 2: Wall Mounting
Figure 3: On-Pipe Mounting

Summary of content (2 pages)