Installation Guide

1011304-2-A
2001 Kohler Co.
Español, Página 5
Français, Page 9
ANATOLE
VITREOUS CHINA
PEDESTAL LAVATORY
K-2099
BEFORE YOU BEGIN
NOTES
Observe all local plumbing and
building codes.
Prior to installation, unpack the
new lavatory and inspect it for
damage. Return the lavatory to its
protective carton until you are
ready to install it.
These instructions are for installing
the lavatory to wood frame
construction. For other
installations, supply suitable
bracing and fastening devices of
sufficient size and strength.
The walls and floor must be
square, plumb, and level.
ROUGHING-IN
(S) Supply 10” (25.4cm) (Based on 12”
(30.5cm) riser which may require
cutting).
(T) Pop-up drain typically 14-1/8”
(35.9cm).
Fixture dimensions are nominal and
conform to tolerances in ASME Standard
A112.19.2M.
4” (10.2cm)
3/8” COLD
1-1/4” OUTLET
3/8” HOT
(S)
(T)
2-7/8”
(7.3cm)
8”
(20.3cm)
7-1/4”
(18.4cm)
FINISHED
WALL
1/2” D. MOUNTING HOLE
IN PEDESTAL
FINISHED
WALL
FINISHED
FLOOR
15” (38.1cm)
18-1/4”
(46.4cm)
21-3/4” (55.2cm)
11-3/8” (28.9cm)
3-1/2”
(8.9cm)
8-1/2”
(21.6cm)
31-7/8”
(81cm)
6-1/8”
(15.6cm)
1/2” D.
ANCHOR
HOLES
4” (10.2cm)
K-2099-4
4” (10.2cm)
2-7/8”
(7.3cm)
2-7/8”
(7.3cm)
K-2099-1
K-2099-8
4” (10.2cm)

Summary of content (12 pages)