Installation Guide

INSTALLATION & WIRING PROCESSING
Step I.
Open the package, read the INSTALLATION & AFTERCARE INSTRUCTIONS firstly.
Mark the hole positions (A - B for Vertically hanging, A - C for Horizontal hanging) by provided
Hanging Template and Mini Level in the package.
Before drilling, ensure there are no hidden cables or pipes behind the mounting points.
Step II.
Drill holes in the marked positions to a suitable
depth, and then use a handle screwdriver to
insert wall plugs provided.
Step III.
Use a electric screwdriver to insert screws
provided.
Step IV.
Find the input cable with two connectors
equipped on the end. Make connections with
filed wire, Neutral to white and Line to black.
This mirror was designed and produced
according to CLASS II level (Double insulation),
no need ground wire connection.
Ensure all connection are tight in place.
Input Wire
of Mirror
Line / Black
Neutral / White
Line / Black
Neutral / White
Filed Wire
A
B
C

Summary of content (2 pages)