Installation & Assembly

Sealant Tape
1/8"
Plus:
• 1-1/4" copper tube or 1/2" nipple
• Emery paper
Clear 100%
Silicone Sealant
Stainless
Plumbers Putty
Use emery paper to remove burrs.
X
2
Slip-Fit Spout: Install the tube
1-9/16" (40 mm) from the wall.
1
Install the escutcheon on the
spout.
Important Information
Observe all local plumbing and
building codes.
Record your model number below
for future reference:
1/8"
Loosen the setscrew to remove the
slip-fit assembly.
X
Install the nipple 1-3/4" (44 mm) from
the wall.
3
Threaded Spout: Apply sealant
tape to a 1/2" nipple.
1/8"
Loosen the setscrew. Slide the spout
and escutcheon against the wall.
Tighten the setscrew.
Apply plumbers putty or sealant to
the escutcheon, leaving a gap at the
bottom.
4
Wipe away excess sealant.Use a clean strap wrench to install
the spout.
Apply plumbers putty or sealant to
the escutcheon, leaving a gap at the
bottom.
1284109-2-A

Summary of content (2 pages)