Installation & Assembly

ASSEMBLY INSTRUCTIONS FOR YOUR
783
ASSEMBLY INSTRUCTIONS
**SHUT OFF ELECTRICAL SUPPLY AT CIRCUIT BREAKER**
1. Remove all parts carefully from the carton. Do not throw away any parts.
2. Remove cross bar (B) from hang straight (E) by un-threading tube (C) from hang straight
(E). Af x cross bar (B), including threaded tube (C), to ceiling outlet box using mounting
screws (D) provided.
3. Measure desired drop for xture to hang and add/remove extension tubes (H) as needed.
Guide wiring through extension tubes before threading tubes together.
**TO ADD/REMOVE EXTENSIONS: (Un)Thread the threaded nipple of one extension into/
out of the threaded opening of the next extension. Make sure electrical cord is pulled tight
when threading extensions together to prevent damage to the wiring.**
4. Thread the bottom extension (H) onto the threaded tube located at the top of housing (K).
5. Guide wiring from top extension (H) through center hole in hang straight (E).
6. Un-thread collar (J) from hang straight (E). Slide collar (J) and canopy (I) down
extensions (H) until they rest on housing (K).
7. Lift xture to ceiling outlet box. Guide wiring through threaded tube (C). Thread hang
straight (E) onto threaded tube (C).
8. Attach loop (G) and hang straight (E) using quick link (F).
9. Pull wiring from ceiling outlet box and make proper electrical connections described in
steps 10-12. A LICENSED ELECTRICIAN IS RECOMMENDED.
10. Attach ground wire from xture (green or silver in color) to ground wire from outlet box.
Fasten wires together with wire nut (A) and tightly wrap connection with electrical tape.
11. Attach hot wire from xture (black in color or smooth side of wire to hot wire from outlet
box. Fasten wires together with wire nut (A) and tightly wrap connection with electrical
tape.
12. Attach neutral wire from xture (white in color or ribbed side of wire) to neutral wire
from outlet box. Fasten wires together with wire nut (A) and tightly wrap connection with
electrical tape.
ojai pendant
IMPORTANT SAFETY INSTRUCTIONS:
*These instructions are provided for your safety. It is very important that they are read
completely before beginning the installation of your xture.
*Turn off power at switch before replacing bulbs, making sure xture has had suf cient time
to cool down.
*If any special control devices are used with this xture, follow the instructions carefully to
assure full compliance with N.E.C. requirements. If there are any questions, contact a
quali ed electrical contractor.
*WE STRONGLY RECOMMEND INSTALLATION BY A LICENSED ELECTRICIAN.
13. Carefully push wire connections back into ceiling outlet box.
14. Slide canopy (I) up extensions (H) and hold rmly against ceiling. Slide collar
(J) up extensions (H) and thread onto hang straight (E) to secure canopy (I)
against the ceiling.
15. Lift shade (M) over bottom section of xture. Slide split washer (L) between
shade washer (J) and shade washer (K). Secure position of shade by turning
shade washer (K) clockwise until it rests rmly against split washer (L).
16. Install three (3) 100W MAX Type A bulbs into sockets.
17. Place diffuser (O) over threaded tube (N). Thread nial (P) onto tube (N) to
secure position of diffuser in place.
18. Reconnect main electrical supply at fuse box/circuit breaker and test xture.
** To clean, use soft cloth only. Do not use any chemical or abrasive cleaners as
they can damage the nish.**
(I)
(J )
(H)
(H)
(H)
(H)
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(K)
(J )
(K )
(L)
(M)
(O)
(N)
(P)

Summary of content (1 pages)