Installation & Assembly

A904
ASSEMBLY INSTRUCTIONS:
1. SHUT OFF THE MAIN ELECTRICAL SUPPLY AT FUSE BOX/
CIRCUIT BREAKER.
2. Remove all parts from carton. Do not throw away any parts.
3. Remove quick link (G) from hang straight (F). Keep quick link (G)
attached to loop (H).
4. Remove cross bar (A) (with threaded tube (C) and hang straight (F)
attached) from canopy (D). Do this by unthreading collar (E) from
hang straight (F). Set collar (E) and canopy (D) over hang straight
(F) aside.
5. Ax cross bar (A) (with threaded tube (C) and hang straight (F)
attached) to ceiling outlet box using screws (B) provided.
6. Measure desired drop for xture to hang and add/remove extension
tubes (I) to reach desired position. Guide wiring through extension
tubes before threading tubes together.
**TO ADD/ REMOVE EXTENSIONS: (Un)Thread the threaded
tube of one extension out of/ into the threaded opening of the next
extension. Make sure wiring is pulled tight when threading
extensions together to prevent damage to the wire.**
7. Thread bottom extension tube (I) onto threaded tube (J).
8. Slide collar (E) and canopy (D) over hang straight (F) and down
extensions (I) until they rest on housing (K).
9. Lift xture to ceiling and secure quick link (G) to hang straight (F).
Carefully guide wire through hang straight (F) and threaded tube
(C) into ceiling outlet box.
10. Make proper electrical connections noted in steps 11-13. A
LICENSED ELECTRICIAN IS RECOMMENDED.
11. Attach ground wire from xture (green or silver in color) to ground
wire from outlet box. Fasten wires together with wire nut (O) and
tightly wrap connection with electrical tape.
12. Attach hot wire from xture (black in color or smooth side of wire)
to hot wire from outlet box. Fasten wires together with wire nut
(O) and tightly wrap connection with electrical tape.
13. Attach neutral wire from xture (white in color or ribbed side of
wire) to neutral wire from outlet box. Fasten wires together with
wire nut (O) and tightly wrap connection with electrical tape.
14. Carefully push wire connections back into ceiling outlet box.
15. Slide canopy (D) up extensions (I) and hold ush against ceiling.
To secure position of canopy (D), slide collar (E) up extensions (I)
and thread it onto the hang straight (F). Turn until hand tight.
16. Remove nial (K) from harp (M). Squeeze harp (M) inward and
place into the opening of saddle (N).
17. Place shade (L) onto harp (M). Thread nial (K) back onto the
harp to secure the shade to the lamp. Repeat steps 16-17 for
remaining shades.
18. Install six (6), 60W max., type B candleabra base bulbs into the
sockets.
19. Reconnect main electrical supply at fuse box/ circuit breaker
and test the xture.
*These instructions are provided for your safety. It is very important that they are read completely before beginning the installation of your xture.
*WE STRONGLY RECOMMEND INSTALLATION BY A LICENSED ELECTRICIAN.
*Turn o power at switch before replacing bulbs.
*If any special control devices are used with this xture, follow the instructions carefully to assure full compliance with N.E.C. requirements. If there
are any questions, contact a qualied electrical contractor.
*This xture is UL rated for dry locations.
IMPORTANT SAFETY INSTRUCTIONS:
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(H)
(I)
(I)
(I)
(I)
(J)
(K)
(L)
(M)
(N)
(O)
***To clean, use soft cloth only. Do not use any chemical or abrasive cleaners.***
ASSEMBLY INSTRUCTIONS FOR YOUR
VERSAILLES CHANDELIER

Summary of content (1 pages)