User's Manual

Installing the 100W Endpoint
TDC-0909-002 100W and 100WP Pit Datalogging Water Endpoint Installation Guide 17
Proprietary and Confidential
Base Mount Installation
The 100W may be mounted to a flat surface using the base tab.
Caution Observe the following guidelines for mounting the 100W using the wall mount
procedure:
Endpoint positioning other than upright could negatively affect radio performance
and battery life.
Use only Itron-approved splice kits or inline connectors.
Required Base Mounting Tools and Hardware
Drill and drill bits appropriate for mounting location material.
Common hand tools for the selected fastening method.
Mounting screws: #10 size pan head screws appropriate for the wall or pit box material.
To install the 100W endpoint using the base mount procedure
1. Select a flat surface.
2. Position the endpoint vertically.
3. Mark the mounting-hole location.
4. Drill a pilot hole in the mounting location material. Follow the screw manufacturer's recommendation for
the pilot hole size.
5. Position the 100W and insert a #10 pan head screw in the base mounting tab. Carefully tighten the
mounting screw until the 100W is secure.
Caution Do not over-tighten the mounting screws. Over-tightening the mounting screws may break the
endpoint mounting tabs.

Summary of content (25 pages)