User's Manual

TDC-0823-005 100G Datalogging Installation Guide - Direct Mount 28
Proprietary and Confidential
This chapter provides the instructions to install the 100G Datalogging gas endpoint on an Itron/Sprague
Meter.
Note Itron/Sprague meters are also known as Actaris and Schlumberger meters. For these
instructions, all meters are referred to as Itron/Sprague meters.
To remove the index from the meter
1. Remove the index cover screws and the index cover from the Itron/Sprague meter. Examine the mounting
screws. If they are 5/8" long and not corroded, keep them to re-attach the 100G Datalogging gas endpoint
assembly. If the screws are not the correct length or if the screws are corroded, discard.
Note Use the removed index cover as a temporary storage container for screws. Properly
dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials.
Do not leave materials on customer premises.
C H A P T E R 4
Itron/Sprague Meter Installation

Summary of content (29 pages)