Elster American and Itron Actaris Commercial Meter Installation To attach the 100G Datalogging commercial gas endpoint to the Elster American Meter commercial meter Warning Handle the 100G Datalogging commercial gas endpoint carefully so the metal passive radiator antenna is not damaged. 1. Tilt the 100G Datalogging commercial gas endpoint at an angle and turn the wriggler until the drive notches line up with the meter wriggler's drive teeth.
Elster American and Itron Actaris Commercial Meter Installation 2. Align the endpoint so the screw holes line up with the meter's top screw holes. Carefully lower the endpoint on the meter with the wriggler notches lining up with the meter's wriggler teeth. Warning The INLET label on the 100G Datalogging commercial gas endpoint must line up with the INLET label on the meter case. 3. Verify the bottom of the endpoint and the top of the meter meet.
Elster American and Itron Actaris Commercial Meter Installation 5. Place the index cover mounting plate on the 100G Datalogging commercial gas endpoint so the printing "FLOW FRONT AL800 AL1000 AL1400 AL2300 AL5000 TURBINE ROTARY" stamped on the plate is toward the front of the meter. (A gap between the mounting plate and meter at the screw locations is normal.) 6. Install four mounting screws included with the 100G Datalogging commercial gas endpoint and tighten them in an alternating diagonal sequence.
Elster American and Itron Actaris Commercial Meter Installation To attach the index/cover assembly on the meter 1. Place the mounting plate gasket (previously removed) on the index cover mounting plate. Align the gasket and index cover mounting plate screw holes. 2. Place the index/cover assembly on the index mounting plate. (The index must face the direction it faced before removal.) Attach the index/cover assembly on the mounting plate using original index screws.
Elster American and Itron Actaris Commercial Meter Installation This completes installation of the 100G Datalogging commercial gas endpoint on an Elster American Meter commercial meter.
Elster American and Itron Actaris Commercial Meter Installation Installing the 100G Datalogging Commercial Gas Endpoint on an Itron Commercial Meter This section provides instructions for installing the 100G Datalogging commercial gas endpoint on Itron/Sprague/Schlumberger 675A, 800A, and 1000A commercial meters. Installation requires an Itron adapter kit available from Itron, Owenton, KY.
Elster American and Itron Actaris Commercial Meter Installation To attach the 100G Datalogging commercial gas endpoint to the meter 1. Turn the 100G Datalogging commercial gas endpoint over and place the four mounting screw bushings into the screw holes on the endpoint. 2. Turn the 100G Datalogging commercial gas endpoint on its side and align the wriggler with the meter's drive dog.
Elster American and Itron Actaris Commercial Meter Installation 3. Inlet lettering on the 100G Datalogging commercial gas endpoint must line up with Inlet lettering on the meter. Slowly lower the endpoint on the Itron/Sprague/Actaris/Schlumberger commercial meter aligning the drive dog and wriggler. The endpoint housing should rest on the top of the meter without gaps. Warning Do not press down on the 100G Datalogging commercial gas endpoint if a gap exists between the endpoint and the meter.
Elster American and Itron Actaris Commercial Meter Installation 2. Place the extension driver on the 100G Datalogging commercial gas endpoint wriggler securely. 3. Align the index wriggler with the commercial 100G Datalogging commercial gas endpoint wriggler driver extension. 4. Install the two index mounting screws. Tighten the first screw two or three turns. Install second screw and tighten to secure. Tighten the first screw to a snug fit. Tighten each index mounting screw evenly.
Elster American and Itron Actaris Commercial Meter Installation 5. Place the index cover over the index with the clear side covering the index dials for easy reading. Align the holes in the index cover with the endpoint adapter plate mounting holes. Secure with the four mounting screws from the adapter kit. Tighten the mounting screws in a diagonal alternating pattern. Insert the first screw and tighten enough to hold the index in place. Insert the second screw and tighten two to three turns.
Elster American and Itron Actaris Commercial Meter Installation This completes installation of the commercial 100G Datalogging commercial gas endpoint on the Itron Commercial meter.
CHAPTER 7 Sensus/Rockwell Commercial Meter Installation This chapter provides instructions to install the 100G Datalogging commercial gas endpoint on a Commercial Sensus/Rockwell diaphragm meter. Removing the Index/ Index Assembly from the Meter 100G Datalogging commercial gas endpoints can be mounted on Sensus/Rockwell Commercial Meters in various configurations. These instructions show the index assembly mounted without a mounting plate.
Sensus/Rockwell Commercial Meter Installation 2. Remove the index screws from the meter. Set the index cover aside where it will not be damaged or fill with dirt, rain or snow. You will re-install the index later in this procedure. Note Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises.
Sensus/Rockwell Commercial Meter Installation Programming the 100G Datalogging Gas Endpoint Program 100G Datalogging gas endpoints using: A FC200SR handheld computer with Endpoint-Link® or Endpoint-Link Pro version 5.3 or higher or A FC300 with SRead handheld computer with Endpoint-Link or Endpoint-Link Pro version 5.5 or higher or A 900MHz Belt Clip Radio with Endpoint-Link version 5.5 or higher and a customer-supplied laptop.
Sensus/Rockwell Commercial Meter Installation To program the 100G Datalogging commercial gas endpoint 1. Program the index drive rate into the commercial endpoint using the endpoint programming device. For all programming and "Check Endpoint" operations, hold the handheld programmer as close to vertical as possible. For best success, keep the handheld programmer within 6 feet of the target endpoint.
Sensus/Rockwell Commercial Meter Installation To attach the 100G Datalogging commercial gas endpoint on the Sensus/Rockwell commercial meter 1. Tilt the 100G Datalogging commercial gas endpoint at an angle and turn the wriggler until the drive notches line up with the meter wriggler's drive teeth. 2. Align the 100G Datalogging commercial gas endpoint so the screw holes line up with the meter's top screw holes.
Sensus/Rockwell Commercial Meter Installation 4. Align the 100G Datalogging commercial gas endpoint with the index mounting holes. Verify the index drive dog intersects with the endpoint's wriggler. Install the endpoint mounting screws (SCR-0062-003 see Installation Prerequisites on page 7 for screw information). Turn each screw 1/4 to 1/2 turn after it contacts the index/endpoint assembly. 5. Install the index cover.
Sensus/Rockwell Commercial Meter Installation 6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press into place with an 11/32" nut driver or similar blunt tool. If your mounting assembly requires a utility-approved wire seal, pass wires through holes in the screw heads and crimp the approved wire seal. This completes installation of the 100G Datalogging commercial gas endpoint on the Sensus/Rockwell commercial diaphragm meter.
Sensus/Rockwell Commercial Meter Installation Mounting a 100G Datalogging Commercial Gas Endpoint on a Rockwell 750 meter with an Aluminum BOX Direct Reading (VDR) Installing the 100G Datalogging commercial endpoint on a Sensus/Rockwell commercial meter with an Aluminum Box Direct Reading (VDR) Index requires two Itron SCR-0062-001 mounting screws (see Installation Prerequisites on page 7) - purchased separately. To remove the index from the 1.
Sensus/Rockwell Commercial Meter Installation 2. Remove the screws holding the aluminum box to the meter. 3. Carefully remove the aluminum box and set it aside. You will use it later in this installation. Program the 100G Datalogging Sensus/Rockwell Commercial endpoint before attaching it to the Sensus/Rockwell meter (see Programming the 100G Datalogging Commercial Gas Endpoint on page 70).
Sensus/Rockwell Commercial Meter Installation 2. Tilt the 100G Datalogging commercial gas endpoint at an angle and turn the wriggler until the drive notches line up with the meter wriggler's drive teeth. 3. Align the 100G Datalogging commercial gas module so the screw holes line up with the meter's top screw holes. Carefully lower the module on the meter so the wriggler's bars line up with the meter drive dog. Itron recommends installation with one bar inserted into the meter drive dog's u-shaped gear.
Sensus/Rockwell Commercial Meter Installation 4. Verify the bottom of the 100G Datalogging commercial gas endpoint and the top of the meter meet. The endpoint housing must rest on top of the meter without gaps. Warning Do not press down on the 100G Datalogging commercial gas endpoint if a gap exists between the module and the meter. A gap may be caused by misalignment of the module wriggler and meter wriggler's drive teeth.
Sensus/Rockwell Commercial Meter Installation 6. Attach the index cover with the original index cover screws and insert tamper seals in the tamper seal cups. Push tamper seals into place using an 11/32" nut driver or similar blunt tool. This completes installation of the 100G Datalogging commercial endpoint with an Aluminum Box Direct Reading (VDR) Index on a Sensus/Rockwell commercial meter.
CHAPTER 8 Dresser ROOTS® Commercial Rotary Meter Installation This chapter provides the instructions to mount 100G Datalogging gas endpoints (residential and commercial) on Dresser ROOTS® Commercial Rotary Meters. Some commercial AMR applications require a Dresser ROOTS® Rotary Meter with a residential 100G Datalogging gas endpoint. Only Elster American version residential 100G Datalogging gas endpoints are compatible with Dresser ROOTS® series rotary gas meters.
Installation Examples The following pictures show typical installations.
Dresser ROOTS® Commercial Rotary Meter Installation Programming the 100G Datalogging Gas Endpoint Assembly Program the 100G Datalogging gas endpoints using: A FC200SR handheld computer with Endpoint-Link® or Endpoint-Link Pro version 5.3 or higher or A FC300 with SRead handheld computer with Endpoint-Link or Endpoint-Link Pro version 5.5 or higher or A 900MHz Belt Clip Radio with Endpoint-Link version 5.5 or higher and a customer-supplied laptop.
To program the 100G Datalogging gas endpoint 1. Program the meter drive rate into the 100G Datalogging gas endpoint using the endpoint programming device. For all programming and "Check Endpoint" operations, hold the handheld computer as close to vertical as possible. For best success, keep the handheld computer within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application.
Dresser ROOTS® Commercial Rotary Meter Installation TC 8C-15C and 2M-11M 16M Number of dials: 5 TC 1.5M-11M Number of dials: 5 Drive rate: 100 Drive rate: 50 PCOMP factor: NONE PCOMP factor: NONE Number of dials: 6 16M Number of dials: 6 Drive rate: 1000 Drive rate: 500 PCOMP factor: NONE PCOMP factor: NONE Settings for Series S3A Registers Model CTR Meter Size 1.
B3 CTR Meter Size 56M B3 CTR Meter Drive Rate 100 B3 TC Meter Size B3 TC Meter Drive Rate LMMA CTR Meter Size 1.5M LMMA CTR Meter Drive Rate 10 LMMA TC Meter Size 1.5M LMMA TC Meter Drive Rate 50 3M 10 3M 50 5M 10 5M 50 7M 10 7M 50 11M 10 11M 50 16M 100 16M 500 S3A CTR Meter Size S3A CTR Meter Drive Rate 1.5M 10 S3A TC Meter Size 1.
Dresser ROOTS® Commercial Rotary Meter Installation Insert the last mounting screw and tighten until snug. Tighten the remaining mounting screws in an alternating, diagonal pattern until snug. Tighten all mounting screws evenly. Warning A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth.
100G Datalogging Elster American Commercial Gas Endpoint 100G Datalogging Sensus/Rockwell Commercial Gas Endpoint Installation Overview Installation requires the following items: One index mounting plate (if applicable) Gasket and drive cover kit (if applicable) An Elster American Meter or Sensus/Rockwell 100G Datalogging commercial gas endpoint A flat, slot-drive screwdriver TDC-0823-005 100G Datalogging Installation Guide - Direct Mount Proprietary and Confidential 87
Dresser ROOTS® Commercial Rotary Meter Installation Programming the 100G Datalogging Commercial Gas Endpoint Assembly Program the 100G Datalogging gas endpoints using: A FC200SR handheld computer with Endpoint-Link® or Endpoint-Link Pro version 5.3 or higher or A FC300 with SRead handheld computer with Endpoint-Link or Endpoint-Link Pro version 5.5 or higher or A 900MHz Belt Clip Radio with Endpoint-Link version 5.5 or higher and a customer-supplied laptop.
To Program the 100G Datalogging commercial gas endpoint 1. Program the meter drive rate into the 100G Datalogging Commercial Gas Endpoint using the endpoint programming device. For all programming and "Check Endpoint" operations, hold the handheld programmer as close to vertical as possible. For best success, keep the handheld programmer within 6 feet of the target endpoint.
Dresser ROOTS® Commercial Rotary Meter Installation B3, LMMA, and S3A CD/TD Dresser ROOTS® Series Meter Drive Rates Use the information in the following tables to program 100G Datalogging commercial gas endpoints installed on Dresser ROOTS® Series B3, LMMA, and S3A registers. Reference the Meter Compatibility List to confirm compatibility. Warning Drive rates listed in the following tables are for commercial module programming. Do not use these settings to program residential or remote modules.
S3A CD Meter Size 1.5M S3A CD Meter S3A TD Meter S3A TD Meter Drive Rate Size Drive Rate 100 1.5M 100 3M 100 3M 100 5M 100 5M 100 7M 100 7M 100 11M 100 11M 100 16M 1000 16M 1000 Note S3A rotary meters are LMMA meters retrofitted with Series 3 accessory.
Dresser ROOTS® Commercial Rotary Meter Installation 2. Locate the INLET (1) stamp on the endpoint and position the endpoint as shown. Verify the 100G Datalogging commercial gas endpoint wriggler (3) and drive dog shaft (2) are aligned (See To attach the 100G Datalogging commercial gas endpoint to the Elster American commercial meter on page 57 or To attach the 100G Datalogging commercial endpoint on the Sensus/Rockwell commercial meter on page 72. 3.
6. Insert new utility-approved wire seals and crimp (if required). Note To mount an index and index cover on a rotary meter without an accessory odometer unit, remove the domed cover and reference To attach the index/cover assembly on the meter on page 64.
Dresser ROOTS® Commercial Rotary Meter Installation Completed Installation Examples 100G Datalogging Elster American Commercial Gas Endpoint mounted on a Dresser ROOTS® Meter with an Instrument Drive 100G Datalogging Sensus/Rockwell Commercial Gas Endpoint mounted on a Dresser ROOTS® Meter with an Instrument Drive TDC-0823-005 100G Datalogging Installation Guide - Direct Mount Proprietary and Confidential 94
Index Symbols & Numbers M 100G Datalogging Gas Endpoint • 1 Meter Compatibility List • 2 Mounting a 100G Datalogging on a Rockwell 750 meter with an Aluminum BOX Direct Reading (VDR) • 75 A Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter • 71 Attaching the 100G Datalogging Gas Endpoint Assembly to Flat-faced Sprague Meters • 35 Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Sprague Meter • 32 Attaching the 100G Datalogging Gas Endpoi
Index To attach the 100G Datalogging Gas Endpoint to the meter • 50, 33, 25, 17 To attach the index/cover assembly on the meter • 64, 60 To install the 100G Datalogging commercial gas endpoint on a Rockwell 750 meter with an Aluminum Box Direct Reading (VDR) Index • 76 To Program the 100G Datalogging commercial gas endpoint • 89, 71, 56 TDC-0823-005 To program the 100G Datalogging gas endpoint • 83, 49, 32, 24, 16 To remove the index assembly • 53 To remove the index from the • 75 To remove the index fro