Installation & Cabling Terminal stations Edition 2.
The information contained in this document is subject to change without prior notice. INTRACOM S.A. TELECOM SOLUTIONS, 2022 All rights reserved. All copyright, intellectual and industrial rights in this document and in the technical knowledge it contains are owned by INTRACOM S.A. TELECOM SOLUTIONS and/or their respective owners. This document is made available to the end users only for their internal use.
Document Revision History WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Document Revision History Revisions This page shows the main changes effected in relation to the previous edition of the WiBASTM / WiBASTM G5 Terminal Stations Installation & Cabling manual. Revisions Reasons of change Previous Document Edition: 2.0 Current Document Edition: 2.
(Page intentionally left blank)
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Equipment Disposal Disposal of old electrical and electronic equipment (applicable through the European Union and other European countries with separate waste collection systems). This symbol, found on this product and any of its parts or on its operating instructions or on its packaging, indicates that electrical and electronic equipment may not be disposed of as unsorted municipal waste.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Statement: Information to the User, Continued WiBAS G5 Connect+ (auto polarization) WiBAS-Connect WiBAS-Connect (auto-polarization) Class B equipment FCC Part 15.19 Statement: Information to the User This device complies with Part 15 of the FCC Rules.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Statement: Information to the User, Continued WiBAS OSDR-TS Class A equipment EN 55022 / EN 55032: This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Warning: This is a Class A product according to EN 55022/EN 55032.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Statement: Information to the User, Continued PONE-OD-DC Class B equipment EN 55022 / EN 55032: This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. FCC Part 15.19: This device complies with Part 15 of the FCC Rules.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Declaration of Conformity English Hereby, Intracom S.A. Telecom Solutions declares that the product WiBASTM is CE marked in compliance with the essential requirements of the Radio Equipment Directive 2014/53/EU, Eco Design Directives 2009/125/EC, 2017/1369/EU, RoHS directive 2011/65/EU, 2015/863/EU and relevant amendments of the above directives.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Table of Contents 1. Introduction ....................................................................................................................... 13 About this Document ........................................................................................................ 13 About WiBAS Terminal Stations .......................................................................................
(Page intentionally left blank)
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 1. Introduction About this Document Scope of document The scope of this document is to provide detailed instructions to the installation and cabling of the following wireless PtMP / PtP Terminal Station products: WiBASTM G5 Connect+ (auto polarization) WiBASTM – Connect (single & auto polarization) WiBASTM OSDR-TS OSDR is an Outdoor Software-Defined Radio platform.
1. Introduction About this Document, Continued Target audience This document is addressed to certified technicians with wireless equipment knowledge and skills concerning the following: Reference manuals Outdoor Radio Unit pole / tower / wall installation. Antenna with mounting kit installation. Preparation & Termination of: Ethernet & Grounding cables. Laying and Installation of: Ethernet, Fiber Optic & Grounding cables. Testing Ethernet cables using Ethernet testers.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.
1. Introduction Radio Units & Antennas Compatibility Matrix Product installation overview WiBASTM solution provides high flexibility, through a wide variety of compact Terminal Station radio units combined with multiple antenna options facilitating demanding coverage scenarios. The following table presents a compatibility matrix between the radio units form factors and the available antennas.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions RF exposure assessment Introduction Any Radio Equipment is emitting Radio Frequency (RF) Radiation through its antenna which may be integrated to the equipment or not. It is important to follow any local, national or international regulation during installation and operation of the Radio Equipment to avoid radiation hazards.
1. Introduction Safety Precautions, Continued RF exposure assessment, continued RF Exposure General Guidelines for equipment installation As a general rule it is expected that the highest level of emission would be in line of sight and in close vicinity of the antenna. Additional requirements for the installation of equipment shall be as follows: The equipment should be located in such a way to prevent the public from accessing the area where the RF Radiation exceeds the regulation limits.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions, Continued RF exposure assessment, continued Specification Value / Description Radio Unit Type WiBASTM-Connect Frequency, GHz 28 Antenna Type Low profile parabolic Diameter, m 0.3 Gain, dBi 37.5 Parameter Power Flux Density Limit, W/m2 (General Public) 10.0 Compliance Boundary, m (General Public) 1.38 Power Flux Density Limit, W/m2 (Occupational) 50.0 Compliance Boundary, m (Occupational) 0.
1. Introduction Safety Precautions, Continued RF exposure assessment, continued Specification Value / Description Radio Unit Type WiBASTM-Connect Frequency, GHz 10.5 Antenna Type Low profile parabolic Diameter, m 0.3 Gain, dBi 29.5 Parameter Power Flux Density Limit, W/m2 (General Public) 10.0 Compliance Boundary, m (General Public) 0.87 Power Flux Density Limit, W/m2 (Occupational) 50.0 Compliance Boundary, m (Occupational) 0.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions, Continued RF exposure assessment, continued Specification Value / Description Radio Unit Type WiBASTM-Connect Frequency, GHz 10.5 Antenna Type Panel Dimension, mm (H x W x D) 268 x 268 x 51 Gain, dBi 25.0 Parameter Power Flux Density Limit, W/m2 (General Public) 10.0 Compliance Boundary, m (General Public) 0.57 Power Flux Density Limit, W/m2 (Occupational) 50.
1. Introduction Safety Precautions, Continued RF exposure assessment, continued Specification Value / Description Radio Unit Type WiBASTM-Connect Frequency, GHz 26 Antenna Type Parabolic Diameter, m 0.6 Gain, dBi 42.3 Parameter Power Flux Density Limit, W/m2 (General Public) 10.0 Compliance Boundary, m (General Public) 2.40 Power Flux Density Limit, W/m2 (Occupational) 50.0 Compliance Boundary, m (Occupational) 1.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions, Continued RF exposure assessment, continued Specification Value / Description Radio Unit Type WiBASTM G5 Connect+ Frequency, GHz 24 Antenna Type Low profile parabolic Diameter, m 0.3 0.5 Actual diameter, m 0.393 0.505 Gain, dBi 36.3 39.5 Compliance Boundary, m (General Public) 1.40 2.0 Compliance Boundary, m (Occupational) 0.70 1.
1. Introduction Safety Precautions, Continued RF exposure assessment, continued Specification Value / Description Radio Unit Type WiBASTM G5 Connect+ Frequency, GHz 28 Antenna Type Low profile parabolic Diameter, m 0.3 0.5 Actual diameter, m 0.393 0.505 Gain, dBi 37.5 40.5 Compliance Boundary, m (General Public) 3.10 4.40 Compliance Boundary, m (Occupational) 1.40 2.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions, Continued RF exposure assessment, continued RF Radiation Safety Information This equipment complies with: Cet équipement est conforme: ISED RSS-102 FCC title 47 part 1.1310 EMF Exposure Directive (1999/519/EC) Radiation exposure limits set forth for an uncontrolled environment.
1. Introduction Safety Precautions, Continued General Do not install or operate this system in the presence of flammable gases or fumes. Operating any electrical instrument in such an environment is a safety hazard. Outdoor units and antennas should be installed ONLY by experienced installation professionals who are familiar with local building and safety codes and, wherever applicable, are licensed by the appropriate government regulatory authorities.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions, Continued Working on the Building’s Roof During stormy weather, do not perform any mechanical assembling or antenna installation / alignment works on the building’s roof. The metal structure of towers / masts is prone to lightning. Proper Grounding Installation Never power on any equipment unless you have completed the grounding installation. There is risk of equipment failure and / or electrical shock.
1. Introduction Safety Precautions, Continued Local power Source AC: Safety requirements require a single pole circuit-breaker to be employed between the local AC power source and power injector. The circuit breaker(1) must disconnect the mains phase of the AC power source.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Safety Precautions, Continued Power Injector Ethernet cable: Connect the OUT receptacle of power injector to the proper receptacle of the radio unit, as described in this manual. Do not connect the power injector’s OUT receptacle to network switches / routers / laptops. There is risk of damaging the network devices due to potential power that is carried inside the Ethernet cable.
2. Materials 2. Materials Scope This chapter describes the installation materials of WiBASTM Terminal Stations. For each material there is an extensive packing list description to the respective installation procedure. Radio units One of the following radio units, depending on site-specific RF planning requirements: WiBAS™G5 Connect+ terminal radio unit, auto-polarization (WG5-CONN-PLUS-HP-27-29). WiBASTM-Connect terminal radio unit (CONN-OB-U-DSDS).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Materials, Continued Antennas One of the following antennas, depending on site-specific RF planning requirements: Panel antenna for WiBASTM-Connect and WiBASTM OSDR-TS, 10.5 - 10.65 GHz (25 dBi) - rectangular flange (ANT-IS-11-PL-C). Parabolic Antenna 0.3 m for WiBASTM-Connect(1) and WiBASTM OSDR-TS, 24.50 - 26.50 GHz (36.8 dBi), - (ANT-IS-26-1F). Low profile parabolic antenna 0.3 m for WiBASTM-Connect, 10.15 - 10.
2. Materials Materials, Continued Antenna adaptation kits One of the following adaptation kits, depending on site-specific antenna requirements: Hooks (OSDR-PL-ANT-KIT). Adaptation plate (WCONN-PAR-ANT-KIT). Mounting kits One of the following pole mounting kits, based on site-specific mounting kit requirements: Pole mounting kit - for poles 42 mm to 80 mm (WG5-WCONN-PL-MNT). Pole mounting kit - for poles 42 mm to 80 mm (WCONN-PL-MNT).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Materials, Continued Power injectors One of the following power injectors, depending on site-specific powering requirements: AC POE injector, indoor, 75 watt (POE-AC75-ID). AC POE injector, indoor, 72 watt (POE-ID-AC72). AC POE injector, indoor, 56 watt (POE-AC56-IDH). AC POE injector, indoor, 35 watt (POE-ID-AC35) AC PONE injector, outdoor, 67 watt (PONE-OD67-AC). DC PONE injector, outdoor, 60 watt (PONE-OD-DC).
2. Materials Materials, Continued Others One of the following items, depending on site-specific installation requirements: Cable holder for fastening 2 x M20-GLAND with cables (OSDR-HOLD-2). Alignment tool (set of two) for WiBASTM-Connect terminal station radio unit (both editions) (WCONN-ALT-KIT). Outdoor lightning surge protector with IP68 ingress protection for Ethernet line (ETH-SRG-OD68). Hand crimping tool for RJ-45 (ST-RJ45) connector (CRIMP-TOOL-S).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 3. Before Starting the Installation Scope This chapter describes all the prerequisites that must be considered prior to installing the following wireless equipment: WiBASTM G5 Connect+ WiBASTM -Connect WiBASTM -Connect auto-polarization WiBASTM OSDR-TS 3.1.
3. Before Starting the Installation WiBAS G5 Connect+ Receptacles # Marking Description Use A GbE1 Gigabit Ethernet, Electrical R-J45 (100 / 1000 Base-T). To connect the S-FTP cable for traffic, inband management and power. B RSSI RSSI cable entry with screw-in tap. To connect the RSSI cable for antenna alignment. Label # Description A FCC statement. B Order code (27 GHz lower band - 29 GHz upper band). C Product description.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.
3. Before Starting the Installation WiBAS G5 Connect+, Continued Other points 38 # Marking Description A GND Radio unit grounding screw. To connect 16 mm2 grounding terminal. B - Wave guide interface. To connect antenna feeder. # Marking A - Description Radio unit holes for M5 screws. Use Use WG5-WCONN-PL-MNT installation with ANT-DP-2628-1F-C and ANT-DP-2628-1D6F-C antennas.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect WiBASTM-Connect (single / auto polarization) Receptacles # Marking Description Use A RSSI RSSI cable entry with screw-in tap. To connect the RSSI cable for antenna alignment. B GbE1 Gigabit Ethernet, Electrical R-J45 (100/1000 Base-T). To connect the S-FTP cable for traffic, inband management and power.
3. Before Starting the Installation WiBAS-Connect, Continued WiBASTM-Connect Label # Description 1 Product description. 2 Frequency band. 3 L or H = WiBASTM-Connect determination transmit as (L)ow or (H)igh in the link pair. 4 Duplex spacing (MHz).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect, Continued WiBASTM-Connect (auto-polarization) Label, continued # Description 1 Product description. 2 Frequency band. 3 L or H = WiBASTM-Connect determination transmit as (L)ow or (H)igh in the link pair. 4 Duplex spacing (MHz). 5 Auto polarization edition.
3.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect, Continued WiBASTM-Connect (both editions) Other points # Marking Description Use A - Anchor point. For installation of safety lanyard. B - Wave guide interface. To connect antenna feeder(1). C GND Radio unit grounding terminal. To connect 16 mm2 grounding cable. Continued on next page (1) Circular for WiBASTM-Connect (auto-polarization) / Rectangular for WiBASTM-Connect.
3. Before Starting the Installation WiBAS-Connect, Continued WiBASTM-Connect Other points, continued # A Marking Description Radio unit (horizontal or vertical polarization) for WCONN-PL-MNT installation with ANT-IS-2628-1F-C, ANT-IS-2628-1D6F-C and ANT-IS-11PL-C antennas. - Radio unit holes for M5 screws. A&B C Use - Hook features.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect, Continued WiBASTM-Connect (auto-polarization) Other points, continued # Marking Description Use A - Radio unit holes for M5 screws. Radio unit for WCONN-DP-PL-MNT installation with ANT-DP-2628-1F-C and ANT-DP-2628-1D6F-C antennas. B - Hook features. Radio unit for ANT-DP-2628-2F-C antenna installation.
3. Before Starting the Installation WiBAS OSDR-TS Receptacles # Marking A GbE2 B FE C Description Use Gigabit Ethernet, Electrical RJ-45 (100/1000 Base-T). To connect Ethernet (S-FTP) cable for traffic / inband management and power via power injector. Fast Ethernet, RJ-45 (100 Base-T). To connect Ethernet (S-FTP) cable for outband management / power via power injector. - - Reserved for future use. D - - Reserved for future use. E GbE1 Gigabit Ethernet, SFP cage.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS OSDR-TS, Continued Label # Description 1 Product description. 2 Frequency band. 3 OSDR determination as Low or High in the link pair. 4 Duplex spacing (MHz). 5 For 26 / 28 / 32 GHz Sub-band (01 up to 02). 6 Transmit frequencies. 7 Receive frequencies.
3. Before Starting the Installation WiBAS OSDR-TS, Continued Other points 48 # Marking Description Use A - Anchor point To fit lanyard for lifting to the pole. B - Wave guide To install antenna feeder. C - Clamps To mount antenna. D - Female threads for M5 screws. To install mounting kit for panel antenna. E GND Enclosure grounding terminal. To connect 16 mm2 grounding cable. F RSSI Receive signal level indication.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 3.2. Radio Unit Cabling Overview Introduction This section describes all the available cabling connections of WiBASTM Terminal Stations. The cabling overview described, as follows: Gigabit ETH cable for service Traffic, Inband Management and Powering Precaution The section describes the cabling overview without using any additional device for lightning surge protection.
3. Before Starting the Installation Gigabit ETH cable for service Traffic, Inband Management and Powering Ethernet cable length restrictions The Gigabit Ethernet (S-FTP) cable for service traffic, inband management and external powering applies to the following restriction: The maximum length of Gigabit Ethernet (S-FTP) cable (Cat5E or Cat6), between WiBASTM receptacles and customer network receptacle cannot exceed 100 meters.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued AC power injector The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code POE-ID-AC35: Marking GbE1 / POE LAN AC INPUT GND Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power.
3. Before Starting the Installation Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued AC power injector, continued The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code POE-AC56-IDH: Marking GbE1, GbE2, OUT IN AC INPUT GND Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power. Gigabit Ethernet (S-FTP) cable for traffic and inband management.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued AC power injector, continued The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code PONE-OD67-AC: Marking GbE1, GbE2, GbE OUT Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power.
3. Before Starting the Installation Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued AC power injector, continued The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code POE-ID-AC72: Marking GbE1, GbE2, POE LAN AC INPUT GND Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power. Gigabit Ethernet (S-FTP) cable for traffic and inband management.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued AC power injector, continued The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code POE-AC75-ID: Marking GbE2, OUT IN AC INPUT GND Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power.
3. Before Starting the Installation Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued DC power injector The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code PONE-OD-DC: Marking GbE1,GbE2, Gbe OUT Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power. Gbe IN Gigabit Ethernet (S-FTP) cable for traffic and inband management.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Gigabit ETH cable for service Traffic, Inband Management and Powering, Continued DC power injector, continued The following schematic shows a cabling overview of WiBASTM Terminal Stations when powering is through power injector with order code POE-HP-OD67-DC: Marking GbE1,GbE2, GbE OUT Cable Type Gigabit Ethernet (S-FTP) cable for traffic, inband management and superimposed DC power.
3. Before Starting the Installation 3.3. Site Prerequisites Site survey Site survey should be done before start the installation taking in consideration the following: Premises information Site details (address, contact persons, GPS and/or map co-ordinates, etc.). Site access and storage information (means of transport, equipment storage and lifting information, etc.). Site location maps. Network planning Site Coordinates.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 Site Prerequisites, Continued Network port distributors Suitable electrical network port distributor should be available. The exact location of the network port distributor, as well as the network ports to reserve, should be known prior to installing the equipment. Also, all the reserved ports on the network port distributors should be qualified and tested before realizing the network connections with the equipment.
3.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 3.4. Recommended Installation Tools Introduction This section describes all the recommended tools for installation of WiBASTM Terminal Stations. Prerequisites It is installer responsibility to provide the tools for equipment installation. Equipment installation tools Item 1 Tool / Photo Description Adjustable torque U-wrench tool (up to 29 mm opening and supporting max tightening torque 40 Nm).
3. Before Starting the Installation Recommended Installation Tools, Continued Termination of cables Type of cables to be terminated: Ethernet (S-FTP) (ETH-CAB-SFTP). Power supply cable (AC-PWR-CAB, DC-PWR-CAB-1 / 2 / 3). Grounding (GND-CAB6-ID, GND-KIT16-OD). Item Tool / Photo Description 1 Blade. 2 Cable cutter. 3 Pliers (long nose). 4 CRIMP-TOOL-S 5 Ethernet cable tester. 6 7 Crimping tool for 6 mm 2 and 16 mm2 grounding cable. Hot air gun. 8 Soldering iron. 9 Solder.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 4.
4. Installation Procedures 4.1. Installing Radio Units and Antennas Overview 64 This section describes the installation procedures for radio unit and antenna, as follows: # Description 1 WiBAS G5 Connect+ Combo 2 WiBAS-Connect Combo 3 WiBAS-Connect and Low Profile 0.3 m / 0.5 m 4 WiBAS-Connect and Parabolic 0.3 m with Adaptation Plate / 0.6 m with Clamps 5 WiBAS-Connect and Panel 6 WiBAS OSDR-TS and Parabolic 0.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS G5 Connect+ Combo Introduction Apply this procedure for installing the following wireless equipment: WiBASTM G5 Connect+ Combo Terminal radio unit WG5-CONN-PLUS-LB-UB with pre-mounted antenna 0.3 m (ANT-IS-2628-1F-C). Mounting kit Pole Mounting kit WG5-WCONN-PL-MNT for installing WiBASTM G5 Connect+ Combo.
4. Installation Procedures WiBAS G5 Connect+ Combo, Continued Pole installation overview WiBASTM G5 Connect+ / Antenna / Mounting Kit WG5-CONN-PLUS-LB-UB and ANT-IS-2628-1F-C WG5-CONN-PLUS-LB-UB and ANT-IS-2628-1D6F-C WG5-WCONN-PL-MNT Pole Installation Overview with 0.3 m Antenna Pole Installation Overview with 0.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS G5 Connect+ Combo, Continued Mounting kits packing materials WiBASTM G5 Connect+ Details WG5-WCONN-PL-MNT Azimuth bracket (A). Elevation bracket (B). Pole bracket (C). U-BOLT, M8 x 100 mm (D). U-BOLT bracket and M5 nuts flange serrated (x2) (E). Set-A: M8 x 25 mm screws (x4). M8 washers steel (x4). M8 lock washers (x4). Set-B: M8 x 25 mm screws (x4). M8 washers (x4). M8 lock washers (x4).
4. Installation Procedures WiBAS G5 Connect+ Combo, Continued Prerequisites For elevation adjustment there is an elevation degrees indicator at both sides of the mounting kit, as shown below. The bracket during installation should be installed in 0 degrees. During commissioning the proper elevation degrees will be applied.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS G5 Connect+ Combo, Continued Precautions Do not grab, nor touch the antenna during lifting, turning or any handling of the terminal while the terminal is mounted on the pole, it may lead to damage of the antenna.
4. Installation Procedures WiBAS G5 Connect+ Combo, Continued Precautions, continued The parabolic low profile antenna should NEVER be placed on a hard surface. Handle the antenna with care and avoid the application of pressure on the antenna cover as this may lead to breakage of the antenna dipole. Never leave unoccupied receptacles without cover. Covering receptacles is necessary to protect against humidity penetration. Tools Adjustable torque U-wrench.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS G5 Connect+ Combo, Continued Procedure for WiBAS G5 Connect+ Combo Step 1 How to install the WiBASTM G5 Connect+ Combo to pole mounting kit (WG5-WCONN-PL-MNT), proceed as follows: Action Mount the azimuth bracket onto the pole bracket and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws (Set-A and Set-B).
4.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS G5 Connect+ Combo, Continued Procedure for WiBAS G5 Connect+ Combo continued Step Action 3 Mount the elevation bracket onto the radio unit and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws. Adjust the tool for applying max tightening torque 5.5 Nm for M5 screws. 4 For cables installation refer to Installing Radio Units Cables . End of procedure.
4. Installation Procedures WiBAS-Connect Combo Introduction Apply this procedure for installing the following wireless equipment: WiBASTM-Connect Combo Terminal radio unit CONN-OB-U-DSDS with pre-mounted antenna 0.3m (ANT-IS-2628-1F-C) or 0.5 m (ANT-IS-2628-1D6F-C). Terminal radio unit CONN-OB-U-DSDS-DP with pre-mounted antenna 0.3 m (ANT-DP-2628-1F-C) or 0.5 m (ANT-DP-2628-1D6F-C). Mounting kits Pole Mounting kit WCONN-PL-MNT for WiBASTM-Connect Combo.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Pole installation overview WiBASTM-Connect / Antenna / Mounting kit WiBASTM-Connect (auto-polarization) / Antenna / Mounting Kit CONN-OB-U-DSDS and ANT-IS-2628-1F-C CONN-OB-U-DSDS-DP and ANT-DP-2628-1F-C CONN-OB-U-DSDS and ANT-IS-2628-1D6F-C CONN-OB-U-DSDS-DP and ANT-DP-2628-1D6F-C WCONN-PL-MNT WCONN-DP-PL-MNT Pole Installation Overview with 0.
4. Installation Procedures WiBAS-Connect Combo, Continued Wall installation overview CONN-OB-U-DSDS-DP and ANT-DP-2628-1F-C WCONN-PL-W-MNT-DP CONN-OB-U-DSDS-DP and ANT-DP-2628-1D6F-C Overview with 0.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Mounting kits packing materials WiBASTM-Connect Details WCONN-PL-MNT Azimuth bracket (A). Elevation bracket (B). Pole bracket (C). U-BOLT, M8 x 100 mm (D). U-BOLT bracket (E). Set-A: M8 x 25 mm screws (x4). M8 washers steel (x4). M8 lock washers (x4). Set-B: M8 x 25 mm screws (x4). M8 washers (x4). M8 lock washers (x4). Set-C: M5 x 40 mm screws (x4).
4. Installation Procedures WiBAS-Connect Combo, Continued Mounting kits packing materials, continued WiBASTM-Connect (auto-polarization) Details WCONN-DP-PL-MNT Azimuth bracket (A). Elevation bracket (B). Pole bracket (C). U-BOLT, M8 x 100 mm (D). U-BOLT bracket (E). Set-A: M8 x 25 mm screws (x4). M8 washers steel (x4). M8 lock washers (x4). Set-B: M8 x 25 mm screws (x4). M8 washers (x4). M8 lock washers (x4). Set-C: M5 x 70 mm screws (x4). M5 nuts (x4).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Mounting kits packing materials, continued WiBASTM-Connect (auto-polarization) Details WCONN-PL-W-MNT-DP Azimuth bracket (A). Elevation bracket (B). Wall bracket (C). Set-A: M8 x 25 mm screws (x4). M8 washers steel (x4). M8 lock washers (x4). Set-B1 / B2: M8 x 25 mm screws (x4). M8 washers (x4). M8 lock washers (x4). Set-C: M5 x 70 mm screws (x4). M5 nuts (x4).
4. Installation Procedures WiBAS-Connect Combo, Continued Prerequisites For elevation adjustment there is an elevation degrees indicator at both sides of the mounting kit, as shown below. The bracket during installation should be installed in 0 degrees. During commissioning the proper elevation degrees will be applied.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Precautions Do not grab, nor touch the antenna during lifting, turning or any handling of the terminal while the terminal is mounted on the pole, it may lead to damage of the antenna. The parabolic low profile antenna should NEVER be placed on a hard surface.
4. Installation Procedures WiBAS-Connect Combo, Continued Tools Adjustable torque U-wrench. Drilling machine (fitted with a 13 mm drill bit) for wall mount installation. Procedure for WiBASConnect Combo How to install the WiBASTM-Connect Combo to pole mounting kit (WCONNPL-MNT), proceed as follows: Step 1 Action Mount the azimuth bracket onto the pole bracket and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Procedure for WiBASConnect Combo, continued Step 2a Action For installing the pole bracket onto the pole perform the respective actions A, B, C and D, as shown below. For installing the pole bracket onto the pole using hose clamps go to the next step. Do not over tighten the nuts. Overtightening will cause deformation of the support clamp.
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect Combo, continued Step 2b Action Pass through both clamps to pole bracket openings and then install the whole assembly onto the pole (taking into the account the caution below): Do not over tighten the warm screws. Adjust the tool for applying min / max tightening torque 5.5 / 7 Nm.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Procedure for WiBASConnect Combo, continued Step 3 Action Turn the antenna to determine the desirable polarization, as shown below.
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect Combo, continued Step Action 4 Mount the elevation bracket onto the radio unit and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws. Adjust the tool for applying max tightening torque 5.5 Nm for M5 screws.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Procedure for WiBASConnect Combo, continued Step Action 5 Mount the elevation bracket onto the azimuth bracket and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws. Adjust the tool for applying max tightening torque 15 Nm. 6 For cables installation refer to Installing Radio Units Cables . End of procedure.
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo How to install the WiBASTM-Connect auto-polarization Combo to pole mounting kit (WCONN-DP-PL-MNT) or to wall mounting kit (WCONN-PLW-MNT-DP), proceed as follows: Step 1 Action For pole mount installation, proceed as follows. For wall mount installation go to step 7.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step 2a Action For installing the pole bracket onto the pole perform the respective actions A, B, C and D, as shown below. For installing the pole bracket onto the pole using hose clamps go to the next step. Do not over tighten the nuts. Overtightening will cause deformation of the support clamp.
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step 2b Action Pass through both clamps to pole bracket openings and then install the whole assembly onto the pole (taking into the account the caution below): Do not over tighten the warm screws. Adjust the tool for applying min / max tightening torque 5.5 / 7 Nm.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step 4 Action Mount the elevation bracket onto the radio and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws. Adjust the tool for applying max tightening torque 5.5 Nm for M5 screws.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step Action 5 Mount the elevation bracket onto the azimuth bracket and then install the respective set of mounting kit packing materials, as shown below: Do not over tighten the screws. Adjust the tool for applying max tightening torque 15 Nm. 6 For cables installation refer to Installing Radio Units Cables .
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step Action 8 Perform the following actions: Attach the wall bracket into the wall surface. Install the respective set of mounting kit packing materials, as shown below.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step 9 Action Mount the azimuth bracket onto the wall bracket and then install the respective set of mounting kit packing materials, as shown below. Do not over tighten the screws. Adjust the tool for applying max tightening torque 15 Nm.
4. Installation Procedures WiBAS-Connect Combo, Continued Procedure for WiBASConnect (autopolarization) Combo, continued Step Action 10 Set the antenna position, as shown in step 3. 11 Mount the elevation bracket onto the radio and then install the respective set of mounting kit packing materials, as shown in step-4. Do not over tighten the screws. Adjust the tool for applying max tightening torque 5.5 Nm for M5 screws.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect and Low Profile 0.3 m / 0.5 m Introduction Apply this procedure for installing the following wireless equipment: WiBASTM-Connect terminal radio unit (CONN-OB-U-DSDS). Low profile antennas 0.3 m (ANT-IS-2628-1F-C) / 0.5 m (ANT-IS-2628-1D6F-C). WiBASTM-Connect terminal radio unit auto-polarization edition (CONN-OB-U-DSDS-DP). Low profile antennas 0.3 m (ANT-DP-2628-1F-C) / 0.5 m (ANT-DP-2628-1D6F-C).
4. Installation Procedures WiBAS-Connect and Low Profile 0.3 m / 0.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Radio unit and antenna packing materials CONN-OB-U-DSDS Details TM WiBAS -Connect terminal radio unit. ANT-IS-2628-1F-C Details Low profile antenna 0.3 m – rectangular flange. Greasing paste. ANT-IS-2628-1D6F-C Details Low profile antenna 0.5 m – rectangular flange. Greasing paste.
4. Installation Procedures WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Mounting kit packing materials WCONN-PL-MNT Details Azimuth bracket (A). Elevation bracket (B). Pole bracket (C). U-BOLT, M8 x 100 mm (D). U-BOLT bracket (E). Set-A: M8 x 25 mm screws (x4). M8 washers steel (x4). M8 lock washers (x4). Set-B: M8 x 25 mm screws (x4). M8 washers (x4). M8 lock washers (x4). Set-C: M5 x 40 mm screws (x4). M5 nuts flange serrated (x4). M5 washers (x4).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Mounting kit packing materials, continued WCONN-DP-PL-MNT Details Azimuth bracket (A). Elevation bracket (B). Pole bracket (C). U-BOLT, M8 x 100 mm (D). U-BOLT bracket (E). Set-A: M8 x 25 mm screws (x4). M8 washers steel (x4). M8 lock washers (x4). Set-B: M8 x 25 mm screws (x4). M8 washers (x4). M8 lock washers (x4).
4. Installation Procedures WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Prerequisites For elevation adjustment there is an elevation degrees indicator at both sides of the mounting kit, as shown below. The bracket during installation should be installed in 0 degrees. During commissioning the proper elevation degrees will be applied.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Precautions Do not grab, nor touch the antenna during lifting, turning or any handling of the terminal while the terminal is mounted on the pole, it may lead to damage of the antenna. The parabolic low profile antenna should NEVER be placed on a hard surface.
4. Installation Procedures WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Tools Adjustable torque U-wrench. Procedure How to install the antennas 0.3 m or 0.5 m parabolic low profile to radio unit (CONN-OB-U-DSDS or CONN-OB-U-DSDS-DP) and then to pole mounting kit (WCONN-PL-MNT), proceed as follows: Step Action 1 Perform the following actions: Remove the antenna waveguide plastic sticker (A). Lubricate the O-ring with silicone grease (B).
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Procedure, continued Step Action 4 This step is related to radio unit CONN-OB-U-DSDS and antennas ANT-IS-2628-1F-C / ANT-IS-26281D6F-C.
4. Installation Procedures WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Procedure, continued Step Action 5 This step is related to radio unit CONN-OB-U-DSDSDP and antennas ANT-DP-2628-1F-C / ANT-DP-26281D6F-C. Follow the radio unit label, as shown below.
WiBAS / WiBAS G5 Terminal Stations Installation & Cabling Manual - Edition 2.1 WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Procedure, continued Step 6 Action Install the feeder onto the radio wave guide, as shown below. Use the cross-headed screwdriver to install the four lock washers and screws. Do not over tighten. Adjust the tool for max tightening torque 4.2 Nm.
4. Installation Procedures WiBAS-Connect and Low Profile 0.3 m / 0.5 m, Continued Procedure, continued Step 7 Action Install the antenna reflector, as shown below. Use the cross-headed screwdriver to install the four lock washers and screws. Fully tighten. Do not over tighten.