StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.1 Document Revision History Revisions • Previous Edition: 1.0 • Current Edition: 1.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.1 Equipment Disposal • Disposal of old electrical and electronic equipment (applicable through the European Union and other European countries with separate waste collection systems). This symbol, found on this product and any of its parts or on its operating instructions or on its packaging, indicates that electrical and electronic equipment may not be disposed of as unsorted municipal waste.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.1 Declaration of Conformity • Hereby, Intracom S.A. Telecom Solutions declares that the product StreetNode 6250 PTP is CE marked, complying with the requirements of the R&TTE Directive 1999/5/EC , EMC Directive 2004/108/ΕC, LVD Directive 2006/95/ΕC, ΕCO Design Directive 2009/125/EU & with the requirements of the RoHS Directive 2011/65/ΕU. The product complies to all relevant FCC regulations.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.1 Radiation Safety Introduction Any radio equipment is emitting Radio Frequency (RF) radiation through its antenna. In the StreetNodeTM 6250 PTP radio, the antenna is integrated and located inside the unit’s enclosure. It is important to follow any local, national or international regulation during installation and operation of the radio equipment to minimize radiation hazards.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.1 Radiation Safety, Continued General installation guidelines (RF exposure) As a general rule, it is expected that the highest level of emission would be at the antenna emission lobe maximum, in direct line-of-sight condition and in the close vicinity of the antenna.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.
StreetNode 6250 PTP with Embedded Node Manager WebGUI Commissioning Manual - Ed1.1 FCC Part 15.19 Statement: Information to the User This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. FCC Part 15.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Table of Contents 1. 2. Introduction ................................................................................................ 2 Startup & Commissioning ......................................................................... 3 Safety Precautions ....................................................................................... 4 Hardware & Software Requirements ............................................
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 1. Introduction Scope This document provides detailed startup, commissioning and operation instructions for the following equipment: • StreetNode 6250 PTP with embedded Node Manager (NM) software. Target audience The procedures described in this manual can be carried out by any technician with basic skills in computer-aided commissioning of outdoor electrical equipment.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 2. Startup & Commissioning Topics • • Safety Precautions • • • • • • Before starting any commissioning works please refer to Reference manuals item 2 on page 2.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Safety Precautions Before starting any commissioning works please refer to Reference manuals item 2 on page 2.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Hardware & Software Requirements Hardware / Software Description Laptop with the following minimum requirements: • CPU x86, 9th generation (Intel Core 2 or AMD ATHLON II Neo). • 250 MB HDD. • 512 MB RAM. • Network interface card. • Windows XP or later version. Ethernet cable (CAT5e, straight-through).
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Connecting the Laptop Where to connect The laptop can be connected directly to the StreetNodeTM 6250 PTP node, in any of its available traffic interfaces located underside: • Gigabit Ethernet 1 (electrical, RJ-45). • Gigabit Ethernet 2 (electrical, RJ-45). • Gigabit Ethernet 3 (SFP). StreetNode GbE Ethernet cable Laptop (Power supply cabling is not shown for simplicity).
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Assumptions For reader’s convenience, we make the following assumptions regarding the startup and commissioning procedure: • Site A – the location of the StreetNodeTM 6250 PTP node that is closest to customer’s PoP (Point of Presence) and is the node that will be installed first.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Startup & Commissioning Procedure Introduction Precautions On the following pages, an overview of the startup and commissioning procedure is provided. For detailed instructions on the included steps, the reader is prompted to the respective section of the Reference Manual of the Node Manager for StreetNodeTM 6250 PTP.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Startup & Commissioning Procedure, Continued Overview Step The commissioning of a StreetNodeTM 6250 PTP unit will be carried as follows: Action Details Refer to 1 Visit site A. Install StreetNodeTM 6250 PTP, point it coarsely toward site B and power it up. StreetNodeTM 6250 PTP Installation & Cabling Manual. 2 Configure management.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Startup & Commissioning Procedure, Continued Overview, continued Step 4 5 6 Details Action Visit site B. a. Repeat steps 1 to 3 for site B. - b. Perform antenna alignment at site B. § Configuring Antenna Alignment. c. Save node B configuration. § Saving Configuration. Connect to site A (from site B) to carry out alignment . a. Use your web browser and the IP address of StreetNode node at site A.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 System LED Indications The LED at the bottom of StreetNodeTM 6250 PTP unit provides visual indications of the system status: LED Status Description Stable ON, green Ready Stable ON, orange Modem alarm is active. Stable ON, red Active alarm (internal or communication). Blinking green Link operational. Blinking orange Waiting for link id. Blinking red Antenna alignment in progress.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.1 Appendix A: Standards of Compliance This product is in full compliance with the following standards: Radio/Use of Spectrum: ETSI EN 302217-3 ν2.2.1 : 2014 ETSI EN 302217-4-2 v1.5.1 : 2010 (antenna) FCC Part 15.255 EMC / EMI : ETSI EN 301 489-1 v1.9.2: 2011 EΤSI ΕN 301 489-4 ν2.1.1 : 2012 EΝ 55022:2010 EΝ 61000.
StreetNode 6250 PTP with Embedded Node Manager WebUI Commissioning Manual – Edition 1.