Assembly Instructions This indirection manual iy only'a gen grid guide and may not fully represent your cabin Building sizes, specifications and drawings of vogue cabin will be found 1 cabin instructions 2208 N. Highland Ave Jackson, TN 38305 731-574-8702, www.hud1ezbuildings.
Fast aging prevention The timber we use is-absolutely untreated except for the impregnated floor beam parts: Timber needs to be protected from the damaging effects of weather changes, sunlight, moisture and biological infestation: It means; that it will turn: grayish over the years: Quarantine the longevity.of your Log Cabin, we recommend to treat it with three coats of quality preservative.
BEFORE STARTING Please be aware that the plans for our building can be buried in the pack, if building ls multiple packs, the plans can be in any of them We advise to unpack all packs and find plans first ROOF COVER Please ensure you have your chosen Roof Covering (Metal roof plates, Shingles) ready before building your cabin Before starting the assembling make sure that you have all the tools and items that will be necessary: Necessary Tools: hammer, screwdriver, ladder, saw, spirit level, measuring tape N
1.FOUNDATION The most important task before your Log Cabin is assembled, into have the base prepared properly. To ensure complete stability, it is important that the foundation is level and flat. Also it is good to make sure that the ground permeates water well and that the frost heaving is prevented. As an alternative, we recommend solid concrete slab or a concrete sole. Tip: an even base is the main step for a successful assembly.
2. FIRST LOGS OF YOUR CABIN As yow might have noticed, not-all the cabin logs are normal in width, A few of them are half width. Tip: The placement of the first logs is very important, because a good start is the key to success, Necessary Tools and Items: | TANGLE.
Place all the first logs in correct order and screw them in place.
3.DOO0ORS AND WINDOWS For your convenience, we recommend fixing doors only after at least 5.logs are applied. Tip: Usually the door opens outward, Single door The door comes fully prepared for assembly, all you ha veto do is slide it down to the right place. Also, be sure that vou are fixing the right side of It. The door has an adequate tolerance 50 that the wall log would fit in smoothly: it doesn't fit in easily; ensure that the logs at the sides and the battens of the frame are straight.
Attention: Do not use too much strength in order not to break the frame Double door Double door frame has to be put together at site using nails or screws.
Continue on assembling by using cabin instructions, until you reach:the point where the windows have to be added {usually iris 7 or 7,5 logs). We recommend to fix the windows when there are 4 logs from: each side-to keep a window from falling out. Fit the windows into their places the same way haste door. if the frame won't fit, vou will need to cut the wall logs leaving about 5mm tolerance between a window and a'wall.
Tilt & Turn window working principle Main points to know: # The handle ¢ ‘The hinge # The locker Ways to open the window e Tilt ® Turn Turn opening. Switch locker position to open Locker open HANDLE HINGE LOCKER Tilt opening. Press the hinge clipper to release the rod. The locker has to be closed.
4.THE FINAL WALL PARTS Necessary Tools and Items: The parts at the very top have 3 unique angled corner.
5.ROOF TRIANGLES Carefully attach the triangle on top of the wall and fix it in place. Use screws if necessary.
Then make sure that all of the purloins are sitting correctly in their places. Fix them with screws if necessary. if there ds a mismatch, you have to fix it, because later you will have problems with the roof boards. Depending on the type of mismatch, you should either cut deeper holes in the triangle or add some piece of wood underneath the purloin to lift it If the cornered wall parts ina triangle are not in the same line =they have to be adjusted.
7.THE ROOF Necessary Tools and Items: 30 We recommend you to start in the front side and continue by moving backwards.
Keep assembling onside of the roof until the edge. It might be that you will need to cut the last roof board in order to adjust the width, oe CHATTING LINE.
8.
9. THE FLOOR Necessary Tool sand Items: Start installing floor boards perpendicularly to floor bearers, starting from the farthest side of the cabin or room looking from:door. Floor boards are shorter in length than a distance between the cabin walls, so it fits without hassle. Here you will need a hammer and a piece of log to knock the planks in a certain place.
10. TRIMS AND RHOMBUS Necessary Tools and Items: SN Trims Trims are used to cover the gap between the floor boards and the wall, All trims have-to be cut by internal cabin measurements, Rhombus iris the very last part. It is fixed on top of the roof triangle and covers the connection of wind boards.
11. WALL LOG CONNECTION Insert a metal plate into the notch Connect the locks, make sure that they have sat perfectly. Screw those locks together, with two screws. Do tas shown in the picture. This applies to all the half-joints in bifurcation.
12. COLUMN The columns are used to support the structurally weakest points bifurcation, After treacherous level whereat should be mounted, carefully measure the length that will be necessary to support the structure and cut the column in needed length. 1. Drill a hole for metal Column Adjusting Piece (CAP) 2. Attach CAP to the base, then put-the: column onto of CAP with hole facing down. Attention: CAP has a nut, which should be adjusted according to house settling.