Installation Guide

PVC
(SCHEDULE 40)
Ideal for irrigation and potable water systems
INSTALLING PVC
After cutting pipe to length,
remove all burrs with a
de-burring tool or sand-
paper.
Dry fit the parts before
applying cement. Mark
depth and alignment with
a felt tip marker.
Apply PVC cement and
quickly assemble pipe and
valve or fittings because
PVC cement dries very fast.
Give a 1/4 turn and align marks.
Hold in place for 30 seconds
so glue has time to bond. Wipe
off excess cement. Joint is ready
to handle in about 15 minutes.
Apply primer to outside of
pipe and inside of valve or
fittings and let dry.

Summary of content (1 pages)