cl \ Testing the Future LABORATORIES, INC. EXHIBIT E SYSTEM MANUAL \.
Thin Line II Reader Installation Manual . y Parts List (Included) Quantity Installation Requirements Thin Line ll 1 The following instructions will explain the installation procedure | 2) #6-32 x 1” self tapping, Type for the Thin Line ll Reader. The instructions include these sec§ 3) Installation Sheet 1 sons: Parts Recommended (not Included) 1) Wire Splice 9 Connecting the Reader to the Host 2) Grommet 3) DC Power Supply 4.
Connect the Reader to the Host according to this wiring diagram and the Hast installation guide. The legend for wiring is color ceded according to the “Gandhian Standard” for the recommended cable. The numbering for the terminals is shown on the back label and in Figure 2 _ Color Gandhian Clock & Data Red +DC +DC Back. Ground.
Proximity Reader Installation Manual Installation Requirements The flowing instructions will explain the installation procedure for the Proximity Reader. The instructions include these sec Hons: Mounting Instructions (hazardous & nonhazardous) Connecting the Reader to the Host Testing & Operation of the Proximity Reader Mounting Instructions 1. Determine an appropriate mounting position for the Reader. 2. Drill two 7/64th (.109) Inch holes for mounting the Reader to the surface. 3.
Connect the Reader to the Host according to this wiring diagram and the Host installation guide. The legend for wiring is color coded according to the “Gandhian Standard” for the recommended cable.
| ; Installation Procedure: 36 — 237 -— (hazardous unit) n Figure 3 / 1. Determine an appropriate location for J the junction box. Attach the junction box to the ! ° mounting surface using the 4 holes shown in figure 3. { Mount the junction box cover to © the junction box and mount the Reader to the cover with the provided screws. « 2. Route conduit and cable to the junction box per National Electric 24 == Code Article 720-2.