Warranty

ATTENTION
SPIKE
IS INSERTED
IN POST
ATTENTION
LE PIQUET
EST INSÉRÉ
DANS LE POTEAU
Item #1002 629 570
Model #HD28583
Use and Care Guide
SOLAR PATHLIGHT
PACKAGE CONTENTS
Assembly and Installation
1
Attaching and installing the light
3
Battery replacement
2
Installation tips
Please read and save these instructions
Part Description Quantity
A
Top cap
6
B
Cage
6
C
Post
6
D
Spike
6
q If the solar panel is covered by a protective lm, remove it before using
the product. Remove the pull-tab from the battery door. Place the solar
light in a location where it can receive a full 8 hours of sunlight to allow
the rechargeable battery/batteries to reach maximum capacity.
q If the soil is of a loose, sandy or organic type, grasp the post with both
hands near the spike and rmly push into the ground.
q If the soil is hard, pour some water onto the ground to soften it.
q If the soil is stony, soften the ground with a rake or shovel and remove
large rocks. Dig a small hole, insert the xture spike, replace the soil and
tap down.
q Never push the xture into the ground by the xture head.
q Attach the spike (D) to the post (C) by pressing them together and press
the post into the bottom of the cage base (B).
q Install the bulb on the top cap (A) by turning it clockwise to lock on
the base.
q Install the top cap (A) by turning it clockwise on top of the cage (B).
qRemove the top cap (A) by turning it counterclockwise.
qRemove the bulb by turning it counterclockwise.
qRemove the battery cover.
qRemove the old battery and replace with 1 new AA NiMh
rechargeable battery of same or greater mAh.
(USE RECHARGEABLE BATTERIES ONLY).
qBe sure to insert the battery in proper direction.
qReplace the battery cover.
qReplace the bulb by turning it clokwise.
qReplace the top cap by turning clockwise.
A
B
D
C
A
B
D
C
D
Pull-tab
Bulb
Battery
Battery cover
LED
A
CAUTION: The light element is fragile. Please be careful not to touch when
removing the bulb to change the battery.
WARNING: When planting the spike ensure that there are no underground utility
lines or pipes.
NOTE: This operation should be done in the morning on a sunny day. This will allow
the light to receive a full 8 hours of sunlight so that the rechargeable battery can reach
maximum capacity.
Note : Clean the battery contacts and those of the device prior to battery installation.

Summary of content (4 pages)